Welcome to UNESCOs Intangible Cultural Heritage of Humanity, Kumbh - - PowerPoint PPT Presentation

welcome to unesco s intangible cultural heritage of
SMART_READER_LITE
LIVE PREVIEW

Welcome to UNESCOs Intangible Cultural Heritage of Humanity, Kumbh - - PowerPoint PPT Presentation

Welcome to UNESCOs Intangible Cultural Heritage of Humanity, Kumbh Mela, 2019 Prayagraj Mela Authority, Uttar Pradesh 2 Key highlights of Kumbh Mela 2019 Major Bathing Dates & Pilgrims Event dates : 15 th Jan to 4 th March , 2019


slide-1
SLIDE 1

Welcome to UNESCO’s Intangible Cultural Heritage of Humanity, Kumbh Mela, 2019

Prayagraj Mela Authority, Uttar Pradesh

slide-2
SLIDE 2

2 2

Key highlights of Kumbh Mela 2019

  • Event dates : 15th Jan to 4th March, 2019
  • Mela Area : 3200 Ha
  • Sectors : 20
  • Institutions setting up camps : More than 6000
  • Kalpvasis : More than 15 Lakh

Major Bathing Dates & Pilgrims

Pilgrims ~2.20 Crore Pilgrims ~1.70 Crore Pilgrims ~1.25 Crore Pilgrims ~5.0 Crore Pilgrims ~1.8 Crore

slide-3
SLIDE 3

3 3

Key Participating Departments

UP Jal Nigam Municipal Corporation Prayagraj Mela Authority UP Police UP state Bridge Corporation Limited UP Power Corporation Limited Irrigation Department Prayagraj Development Authority UP State Road Transportation Corporation Public Works Department UP Health Department District Administration

slide-4
SLIDE 4

4 4

Pilgrim Experience – the Pivot

  • Vision of Divya Kumbh and Bhavya

Kumbh.

  • State-of-the-art infrastructure and basic

amenities.

  • Blend
  • f

traditions and modern technologies.

  • Setting up of Prayagraj Mela Authority to

coordinate with the 28 state departments and 5 central government departments.

  • The core principle while planning for

making the Kumbh Mela has been to ensure enhanced Pilgrim experience.

slide-5
SLIDE 5

5 5

Broad framework for Kumbh Mela 2019

Prayagraj Mela Authority

  • Government of Uttar Pradesh set up the Prayagraj

Mela Authority to coordinate with 28 State Government Departments along with 5 Central Government Departments

Apex Committee Mandal level committee

  • Committee

for coordinating between various Departments

  • f

the government engaged in Kumbh Mela works and to conduct weekly reviews

  • f works under all heads and regular inspections
  • Apex Committee formed under the Chief Secretary of

the State Government for sanctioning works and guiding the Departments and monitoring the work at the highest level

Detailed Work Plans

  • Detailed plans prepared for each of the components

such as Electricity, Water Supply, Drainage, Sanitation, Tentage, Civil Supplies etc.

slide-6
SLIDE 6

6 6

Broad framework for Kumbh Mela 2019

Online Project Monitoring System Third Party Inspection Agency

  • Agency has been contracted by Mela Authority

with 36 Resident Engineers deployed to inspect and report on all ongoing projects for quality

  • PMIS portal has been designed where PERT & other

details of the projects are monitored on real time basis

E-Tendering/ Online Procurement Process

  • All tenders have been successfully completed using

the E-Tendering Portal utilising the transparent processes put in place by the Government of India

  • Consultants and interns from varied backgrounds

have also been engaged.

Innovation Consultants & Interns

slide-7
SLIDE 7

7 7

Permanent Infrastructure Works

slide-8
SLIDE 8

8 8

Uttar Pradesh State Bridge Corporation

  • 9 road-overbridges (R.O.B.) constructed in record time of less than 18 months.
  • Budget allocated – INR 435 Cr.
slide-9
SLIDE 9

9 9

Public Works Department

  • Strengthening and widening of 140 roads done.
  • Budget allocated - INR 10,61 Cr.
slide-10
SLIDE 10

10 10

Prayagraj Development Authority

  • Strengthening and widening of 34 roads in the city completed.
  • Redesigning, refurbishing and beautification work is being done at 64 traffic

junctions.

  • Budget allocated – INR 298.3 Cr.
slide-11
SLIDE 11

11 11

Uttar Pradesh Power Corporation

  • Upgradation and Strengthening of existing power infrastructure and electricity

system.

  • Budget allocated - INR 81 Cr.
slide-12
SLIDE 12

12 12

Uttar Pradesh Jal Nigam

  • Augmentation of water supply system and improvement of drainage and sewerage

system.

  • Budget allocated – INR 101.2 Cr.
slide-13
SLIDE 13

13 13

Health Department and Medical College

  • Renovation work at multiple hospitals, development of new wards and

purchase/upgradation of medical equipment.

  • Budget allocated - INR 73 Cr.
slide-14
SLIDE 14

14 14

Police Department

  • Construction, development and renovation work of multiple Police stations and

hostels.

  • Budget allocated – INR 84.8 Cr.
slide-15
SLIDE 15

15 15

Tourism & Culture Department

  • Upgradation of Tourism Department infrastructure and key tourist sites.
  • Budget allocated- INR 21 Cr.
slide-16
SLIDE 16

16 16

Mela Area Works

slide-17
SLIDE 17

17 17

Facilities and Attractions at Kumbh

  • One of a kind cultural hall to cater to

Pilgrims with a capacity of 10,000 people

  • Various cultural events are being held

at the Ganga Pandal with artists coming from all across the country

  • Public

Accommodation for 20,000 Pilgrims has been constructed in the Mela Area with facilities for staying during the night and proper safety measures

Public Accommodation Ganga Pandal

  • More than 500 cultural programmes

with 5000+ artists are being held in the 6 Convention Halls built in the Mela Area

Convention Halls

slide-18
SLIDE 18

18 18

Facilities and Attractions at Kumbh

  • Ultra modern International Media Center has

been constructed to cater to journalists and media personnel from across the globe

  • More than 902 Stalls of Food, Grocery, Clothing,

Utensils etc. have been set up in designated Vending Zones

  • 3 Amusement zones with a variety of attractive

games, 3D projection theaters and

  • ther

engaging activities have been set up

Media Center Vending Zones Amusement Zones

  • More than 20 Lakh sq. ft. of city and Mela area

infrastructure has been painted by various artists, drawing funds from various Government Projects like Namami Gange, Smart City, Swachha Bharat Mission etc.

Paint My City

slide-19
SLIDE 19

19 19

Swach Kumbh

  • More than 20,000 dustbins with liner bags deployed

for solid waste management

  • More than 24,000 sanitation workers employed for

street sweeping.

  • 40 Compactors and 120 Tippers used for seamless

transportation of waste.

  • More than 1,15,000 toilets installed
  • ICT-based system deployed to monitor and ensure

timely cleaning of toilets

  • Proper
  • nsite

sludge management, cesspool

  • perations

and

  • dour

management are being deployed.

Clean and Beautiful Kumbh

  • More than 1500 Swacchagrahis engaged as foot

soldiers monitoring of the operations and usage of toilets and dustbins

  • Dissemination
  • f

information

  • n

the theme

  • f

protection of the biodiversity of Ganga & cleanliness through hoardings, banners, workshops, roadshows etc.

Behaviour Change

slide-20
SLIDE 20

20 20

Safe Kumbh

  • An ultra-modern Integrated Command and Control Centre (ICCC) has been

developed for crowd management, security and surveillance.

  • A robust security and surveillance plan has been prepared in consultation with

experts.

  • A comprehensive and holistic Disaster Management plan has been developed with

consultation from experts, SDMA and all departments working on Kumbh Mela 2019.

  • 3 Police lines, 40 police

stations, 3 female police stations and 58 police out posts have been constructed.

  • 40 Fire fighting centres, 15

fire out posts and 40 watch towers have been built.

slide-21
SLIDE 21

21 21

Safe Kumbh – Security Plan

  • An in-depth security plan
  • Three tier security
  • More than 20000 police personnel
  • 20 company PAC
  • 54 company CAPF
  • Commando teams
  • More than 20 BDDS/ AS Check teams
slide-22
SLIDE 22

22 22

Safe Kumbh – Traffic Plan Key Highlights

  • Separate plans have been prepared for peak days and non-peak days.
  • Several emergency schemes have been developed for critical situations.
  • 95 parking lots with a total area of 1253 hectares.
  • Combined capacity of parking lots is 563,000 vehicles.
  • Major parking lots are within 1 to 5 km of bathing areas.
slide-23
SLIDE 23

23 23

Safe Kumbh – Traffic Plan Key Highlights

  • Key roads for uni-directionally for optimal traffic management.
  • Signages and variable message boards across the Mela Area and the parking

lots.

  • Availability of cranes on key roads.
  • Shuttle bus and CNG/ e-rickshaw.
  • Holding places.
slide-24
SLIDE 24

24 24

Safe Kumbh – River safety

Deep Water Barricading

River Control Room Rescue Boat

Trolley Mounted High Pressure Water Mist Fire Extinguisher

Fire Fighting High Pressure Water Mist Bike

slide-25
SLIDE 25

25 25

Safe Kumbh – ICCC and Monitoring

  • 2 Command and Control Centres with 4 Viewing Centres
  • 1135 Cameras at 268 Locations
  • 24x7 Surveillance
  • ICCC: Kumbh Mela area viewing operators – 120, call center operators – 30,

video wall cubes – 20.

slide-26
SLIDE 26

26 26

Safe Kumbh – UP Dial 100

  • 24*7 Service.
  • 50 four wheeler vehicles.
  • 200 two wheeler vehicles.
  • Availability of police, medical and fire services in just 5 to 10 minutes.
slide-27
SLIDE 27

27 27

Safe Kumbh – Digital Lost & Found Center

  • Fully digitised lost and found centres for the first time, supplemented by

traditional PA system.

  • 15 centres have being established across the Mela Area and the city.
  • All centres are interconnected by a sophisticated server.
  • Information of lost and found pilgrims are broadcasted with photos on LED

Screens at each centre.

  • Social media platforms are being used to re-unite the Pilgrims.
slide-28
SLIDE 28

28 28

Sanskritik Kumbh

  • Exhibition on various aspects of

Indian history

ODOP Handicrafts Swach Bharat Mission NMCG Information Department Van and Jeev Vibhag

Sanskriti Gram Kala Gram & Kala Kumbh

  • Exhibitions have been setup by

NMCG, ODOP, SBM, Information Department and other Government Departments

Exhibitions

  • NCZCC

has

  • rganized

an exhibition on the various arts from Indian states

  • Sculptures from various states of

India and exhibitions have been set up in 13 pavilions and 7 Cultural Areas have been developed

slide-29
SLIDE 29

29 29

Digital Kumbh

  • Computerised layout, plot allotment system, Geo-fencing and standardization of all

the plots is done.

  • A robust ICT-based system deployed to monitor and ensure timely cleaning of these

toilets and also the monitoring of the manpower engaged in street sweeping.

  • ICT based system deployed to manage Civil Supplies Distribution in the Mela.
  • Virtual Reality tours of Kumbh Mela have being captured and are available to

Pilgrims and visitors for an immersive Kumbh experience.

slide-30
SLIDE 30

30 30

Community Engagement

  • The Mela Authority has engaged and mobilised volunteers to help in various

facets of Mela Organization.

  • Training and capacity building activities are being done for varied stakeholders,

including tour

  • perators,

e-rickshaw drivers, boat

  • perators,

vendors, stakeholders etc.

slide-31
SLIDE 31

31 31

Mela Infrastructure Development Works

  • Electrification
  • f

Pontoon bridges, Parking areas, Panchkoshi Parikrama Marg and Dwadash Madhav done for the first time.

  • M.C.Bs setup in electrical connection of camps

for safety purposes.

46,900

LED Lights

1,180 Km

L.T Line

105 Km

Hyper Tension Line

225

High Masts

64

Temporary Sub Stations

2,80,000

Camp Connections

Electricity Works

  • 1,71,109 chequered plates being used for the

construction of 488 kms roads in the Mela area.

  • 2,387 Pontoons used for developing 22

Pontoon bridges.

Roads & Pontoon

slide-32
SLIDE 32

32 32

Mela Infrastructure Development Works

Drainage & Sewerage

150 Km HDPE Pipe Line 850 Km Drains 100 Diesel/ Trolley Mounted Pumps

  • Ponding

sites and Bio-remedial treatment sites built in and around the Mela area

  • Permanent sewer lines built in a few sectors

to ensure efficient sewage transportation from Mela area to treatment plants

5000 Stand Posts 850 Pipe Line (Km) 75 Water ATM 150 Water Tankers 150 Hand pumps

Drinking Water

  • 24/ 7 drinking water supply ensured during

Mela period to all camps.

  • Continuous Water Testing to check on quality.
  • Water ATMs. Stand Posts and Hand Pumps

installed in the Mela area

slide-33
SLIDE 33

33 33

Kumbh Mela – Website & Mobile Apps

  • Dedicated

section for visitors for where to stay and how to reach.

  • Event calendar
  • Regular updates
  • Global Reach
  • Intuitive and user friendly

mobile apps on iOS and Android.

slide-34
SLIDE 34

34 34

Kumbh Mela – Social Media

Engaging campaigns to drive user interactions and to increase followers.

Paint My City Top trending Objective- Create conversations on the campaign.

slide-35
SLIDE 35

Kumbh Calls!