Highway 15 Hutchinson Project WELCOME! Public Meeting - Please Sign In - Thank you for attending! Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch Highway 15 Hutchinson Project


  1. Highway 15 Hutchinson Project WELCOME! Public Meeting - Please Sign In - Thank you for attending! Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  2. Highway 15 Hutchinson Project Project Schedule 2017 2018 2019 2020 July - Sept Oct - Dec Jan - Mar April - June July - Sept Oct - Dec Jan - Mar April - June July - Sept Oct - Dec Public Engagement Open House 1 Open House 2 Open House 3 Open House 4 Open House 5 Open House 6 Public Open Houses, Local Government Aug Late Summer Summer Spring Spring Updates, and Targeted Meetings 24 Fall Building Inspections, Surveying Historic Signed Environmental Review Property CATEX Review Traffi c Engineering/ 30% 60% 90% 100% Hydraulics, Utilities. Permits Geometric Preliminary Design Layout Detailed Design Final Design, Streetscape/Landscape Project Letting/ C O N S T R U C T I O N November 22, 2019 Contractor Selection Project Goals & Benefi ts Summary of Work • Smoother road surface • Complete reconstruction of Main Street/ Highway 15 through downtown • Modernize sanitary sewer, water main and storm sewer • Pavement resurfacing of Highway 15 between 5th Ave S and just south of Denver Ave • Help ensure city and state infrastructure serves their purpose for many years • Update sidewalk and pedestrian crossings along project area to meet Americans with • The City of Hutchinson views this project as Disabilities (ADA) standards an opportunity to enhance downtown and improve livibility in the central district Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  3. Highway 15 Hutchinson Project DOWNTOWN TYPICAL SECTIONS Existing 10.5’ 8’ 15’ 14’ 15’ 8’ 10.5’ Walk Park Lane Shared Center Lane Right Turn Walk Left Turn Lane Lane 60’ Roadway 82.5’ Right-of-Way Proposed 13’ 10’ 11’ 13’ 11’ 10’ 13’ Walk Park Lane Shared Center Lane Right Turn Lane Walk Left Turn Lane 55’ Roadway 82.5’ Right-of-Way Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  4. Highway 15 Hutchinson Project PROJECT AREA & CONSTRUCTION DETOUR Construction and detours begin in 2020. Preliminary detour route utilizes Highway 22 to the east, between Highway 7 and Airport Road (County Road 115). Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.