weather A Presentation of two halves 1. Very brief summary about - - PowerPoint PPT Presentation
weather A Presentation of two halves 1. Very brief summary about - - PowerPoint PPT Presentation
Transformation: Efficiency.......and weather A Presentation of two halves 1. Very brief summary about Gaist 2. Making Service reductions? Or just day to day efficiencies? 3. Cabinet Office/DfT Research on Local Highways 4. Technology the
- 1. Very brief summary about Gaist
- 2. Making Service reductions? Or just day to
day efficiencies?
- 3. Cabinet Office/DfT Research on Local
Highways
- 4. Technology the common theme
A Presentation of two halves
- Work with over 25% Highway Authorities (County
Councils & Smaller authority asset surveying/support)
- Technology & Innovation support to:
– University based (York & Lancaster) – Government Departments including; MOD, DCLG, Cabinet Office, DfT – Councils including; Cumbria (Resilience & new tech) etc
- Work with major contractors such as Tarmac and KIER
- Data support (and data integrity analysis) including using
blended data sources (Open, Scanner etc)
Gaist – not who you think we are?
Where can service reductions be made?
- 1. Procurement
particularly competitive dialogue
- 2. Collaboration (but with
a health warning)
- 3. Low hanging fruit and
being challenging
- No magic bullet
- Many authorities doing great things
- Important to remember history & where a service has
come from (cherry pick right efficiencies)
- Consistently asking questions and challenging status
quo
- Take a leaf out of Health Service Transformation
– Arrogance biggest block to innovation, efficiency & change
Reduction in service?
- Fundamental Service Analysis
– Does require being brave! – Does require not knowing the answers – Does require process mapping accepted norms!
- APSE are an important resource
- Looking at technology differently
- Relationships with elected members
Biggest area of efficiencies you can effect
Research into isolated communities
Paula Claytonsmith, Director Strategy Steve Berry, Head of Local Roads, Innovation, Resilience, Light Rail & Cableways,DfT
UK Weather always unpredictable?
UK Weather always unpredictable?
UK Weather always unpredictable?
Past and Present
Times are changing and what about
- ur Highways?
- Asked by Sir Oliver Letwin to undertake a range of
flooding scenarios on English Highways
- Using Algorithm problem solving we looked at:
– Isolated Communities across England (not ‘isolated’ to northern authorities) – 1:30, 1:1000 (Depth 1ft/2ft) – Road/River intersections – Vulnerable assets analysis
National Flood Resilience Review
- Initial data using EA highlighted scenario challenges
– Responsible use of Data, unintended consequences – Property blight
- Met with LGA and discussed approach
- Currently reviewing best way for councils to input
e.g Bridges/Culverts
- DfT considering additional ways to support in
extreme events
Post National Flood Resilience Review
Weather - Temperature
Increased Snowfall
Rainfall peaks and troughs
BUT......
- Society is changing
- Public finance is changing
- Expectations of Councils & Government is
changing with each extreme event
- Social Media & instant media has challenged
the impact people see
Are we winter ready?
- Technology (& social media) can be as much your
friend as it can be your master
- Technology is no longer expensive but you can
make it expensive.......unintentionally
- Incremental Innovation goes hand in hand with
service transformation
- Don’t forget your users, Elected Members & staff
Technology binds my points
Thankyou Contact details: Paula.Claytonsmith@gaist.co.uk
Service Overview - Slough Borough Council
APSE Performance Networks Best Performer - Roads, Highways and Winter Maintenance 2015
Slough became a member of APSE in 2012 Awarded Best Performer in Roads, Highways and Winter Maintenance for year 17 (2014-15) Highways Engineering is a division within the Regeneration, Housing and Resources Directorate, and are responsible primarily for keeping the highway network safe and unobstructed for all highway users. Our vision statement is: “To provide a safe well maintained highway minimising congestion delivered in the most efficient way adopting continual improvement and best practice principles to best serve the residents, business and visitors of Slough”
APSE performance networks
About Slough
APSE performance networks
About Slough’s network
65
APSE performance networks
APSE performance networks
Approach to highway maintenance – Inspection regime
Slough is split into 3 areas – East, West and Central Each road in Slough is inspected at least twice a year Network is split into 3 categories Cat 1, 2 and 3 – 1 most heavily used and 3 least heavily used Cat 1 are inspected monthly – walked twice a year and driven ten times Cat 2 – walked twice a year and driven twice Cat 3 – walked twice a year All shopping areas are walked once a month High Street is walked weekly
APSE performance networks
Approach to highway maintenance – Condition surveys
Slough carry out the following annual condition surveys CARRIAGEWAY SCANNER – machine survey – 100% of the A, B and C road network surveyed annually SCRIM – machine survey – 100% of A, B, C and D roads surveyed annually CVI – manual survey – 100% of D and U roads surveyed annually FOOTWAY FNS – manual survey -
- f the network surveyed each year
We wanted a way to benchmark our performance against other similar authorities It would give us an indication of whether our overall service delivery was getting better or worse We wanted to know which areas we were strong in and which areas required work It would help us identify areas where we should attempt to get more funding
APSE performance networks
Why we joined APSE
As part
- f
the governments drive towards promoting greater efficiency in the provision of local government services, authorities are being encouraged to implement better asset management. One of the ways Slough has done this is by compiling Highway Asset Management Policy and Strategy documents (HAMP and HAMS). These documents have now been formally adopted by cabinet. The documents provide us with a framework we can refer to, to ensure that our work is done according to good asset management principles.
APSE performance networks
Highway Asset Management Policy and Strategy
SURVEYS WORKS January Commission condition surveys Engineers produce a priority list March Programme produced by resurfacing contractor May Works planned and organised June Works carried out on site July Surveys completed on site First phase of programme complete October Survey data received November Process survey data December Produce survey plots
APSE performance networks
Programme of works
We process the raw condition data from the surveys and produce the plots ourselves using our UKPMS
APSE performance networks
Condition surveys
APSE performance networks
Condition surveys
APSE performance networks
Condition surveys
APSE performance networks
Recent innovations
- Slough made the transition to an electronic inspection record to
ensure ease of data recollection and reporting, accuracy of data and ease of assess.
- Previously Slough used 3 priority levels when issuing a works
- rder. We recently moved to 2.
- This simplified system has greatly improved value for money, for
both the Council and our term maintenance contractor.
APSE performance networks
Summary of key indicators
Condition of principal roads Condition of all non principal roads Condition of unclassified roads Number of category one defects per km of maintained road PI 02b PI 02c PI 02g PI 28 SCANNER SCANNER CVI 2012-13 6% Q4 14% Q3 6% 0.34 Q3 2013-14 9% Q4 9% Q2 6% Q1 0.31 Q2 2014-15 2% Q1 2% Q1 4% Q1 0.17 Q2
0% 2% 4% 6% 8% 10% 12% 14% 2012-13 2013-14 2014-15 PI 02b PI 02c PI 02g
APSE performance networks
Winners!!!
Total number of indicators – 38 First in service - 11 out of 38 - 29% Top Quartile achieved - 21 out of 38 - 55%
INSPECTIONS/ REPAIRS - On top of ad-hoc maintenance ROAD CONDITION - Road network is in good condition (all categories) INSURANCE CLAIMS - Network is in a safe state versus money being spent on it BRIDGES – No bridges failing European standards WINTER MAINTENANCE – High percentage of network treated MISC – Good standard of customer service and low employee absence
APSE performance networks
Analysis of 2014-15 performance
APSE performance networks
Post 2014-15
- Pressures to reduce budgets whilst maintaining the standard of service
- £1.2m saved throughout 2015-16 primarily through cuts in service budgets
- No major changes in Highways structure from 2014-15 to 2015-16
- Planned to merge with Transport by start of 2016-17 FY
- What was the effect on our performance as measured by APSE following these
changes?
APSE performance networks
Projected performance in 2015-16
INSPECTIONS/ REPAIRS – Performance still good BRIDGES – only drop is in Principal Inspections done on time – this is due to Third Party issues out
- f our control
WINTER MAINTENANCE - Performance still good MISC - Performance still good INSURANCE CLAIMS – Slight increase in number of claims on the footway that were settled ROAD CONDITION Slightly worse A road condition – possibly due to cut in maintenance budgets. Unclassified roads significantly worse. We have raised this with our survey contractor and will be auditing the survey data.
APSE performance networks
Projected performance in 2015-16
HOW DID WE PERFORM ON INDICATORS WHERE WE DID BADLY LAST TIME?
PRO-ACTIVE MAINTENANCE – we are still spending too much on reactive and not enough on planned KM INSPECTED PER SAFETY INSPECTOR – seems to be an issue possibly with how other authorities are reporting their figures – in the process of querying this BRIDGE CONDITION – in the process of getting Capital funding from the DfT for an ‘Invest to save’ project PERCENTAGE OF FW’S TREATED – consistently only treat a small percentage of footway – due to budget constraints
APSE performance networks
2016-17 and beyond
- Highways and Transport Teams successfully merged
- Rationalisation of management structure
- £1m saved in first 6 months of 2016-17 from cuts in posts and
service budgets
- Further budget cuts still needed
APSE performance networks
2016-17 and beyond
LED project
- We put together a joint bid for the DfT Challenge Fund (1st
Tranche) late Dec 2014/ early Jan 2015
- Received the grant approval Feb 2015
- Slough is the lead authority for this collaborative project. Our
partner authorities are Wokingham and Reading Borough Councils.
APSE performance networks
2016-17 and beyond
LED project
Began project in April 2016 – to be completed by March 2018
- Installing 1,500+ new columns 12,000+ new lanterns, energy savings and a new CMS by 2018
- Partnership working - managing decision making between three authorities
- Main benefits will be a reduction in energy costs via the new lanterns and maintenance costs via the CMS
- What have we learnt and what are the next steps?
As the project is only in its initial stage we have only encountered a minor admin issue with regards to Inter Borough cross charging
APSE performance networks
2016-17 and beyond
DfT Challenge Fund bid for Capital structural works Tranche 2
- We anticipate that the bid will be made in Jan 2017 – a joint bid
with other Berkshire authorities
- Total number of bridges / structures owned or maintained by
Slough - 65 (53 bridges and 12 gateway signs)
APSE performance networks
Future performance
- Due to our successful Street Lighting LED bid we have
managed to do a bulk overhaul of the entire inventory. This will lead to significant cost savings in the medium to long term at minimal cost to us.
- If we are successful in the Tranche 2 Structures bid we
will be able to follow a similar strategy for them.
APSE performance networks
Future performance
- Our
main
- bjective
is to move towards a pro-active approach to maintenance.
- We aim to do this by introducing Lifecycle Planning mechanisms.
- We
have adopted Highway Asset Management Policy and Strategy documents (HAMP and HAMS) as part of our organisational culture as mentioned before – we now need to focus on their implementation.
- This will be part of the process which includes revising our maintenance
policy based on the new guidance document ‘Well-managed Highway Infrastructure’.
APSE performance networks End of presentation Questions?
Heading
Body text
Heading
Body text
UP FOR THE CHALLENGE Highway Maintenance to Boost the Economy
Jon Munslow South Gloucestershire Council
Heading
Body text
Heading
Body text
Our successful bids What we did How we did it Why we did what we did What we learned
Heading
Body text
Heading
Body text
Links Avonmouth Port and Severnside Enterprise Zone to The M48, M49, M4 and M5. Serves rural communities. Highways England diversion route A403 Joint bid with Bristol City £15.4 million
Heading
Body text
Heading
Body text
Major commuter and business route. Serves two Enterprise Zones. 52000 vehicles per day. Links north and east Bristol to the motorway network.
Highways England diversion route
A4174 Ring Road £15.5 million
Heading
Body text
Heading
Body text
Nearly didn’t do it. – Too much effort? We are too small? Thought about our investor – It is DfT’s money. Used Project Management – Bidding is a project. Identified where we would need help and sought it. Invested in our bid – put our own money at risk.
Do it like you mean it
Heading
Body text
Heading
Body text
Set up a project and team Read;
- How the DfT assesses the business case for major
investments.
- Transport Analysis Guidance – WebTAG
- Recent successful Major Transport Bids.
The Bid Project
Heading
Body text
Heading
Body text
Asset Modelling Life Cycle Planning Economic Modelling Added Benefits Delivery Modelling Added Opportunities Optimised the Benefits to be achieved.
The Bid Project
Heading
Body text
Heading
Body text
Be careful what you bid for! Put the effort in Teamwork is key Use your opportunities Outcomes for the Customer and Economy
What we Learned
Heading
Body text
Heading
Body text
Thank You
https://www.southglos.gov.uk/transport-and- streets/challenge-fund/ challengefund@southglos.gov.uk Jon Munslow South Gloucestershire Council
LED Street Lighting Costs, Benefits and Contracts
Mark Darlow-Joy Highways Contract Manager
LED Street Lighting Costs and Benefits
- LED installation in Street Lighting in
Gloucestershire
- Developing a business case for installation
- Delivering in partnership with contractors
- Challenges overcome and outcomes achieved
How we got here……..
- c60,000 street lights – costing £2m per year to keep lit
- Electricity costs expected to rise, 57% of service spend and
requiring annual growth bids
- Energy efficiency projects – dimming, part night lighting (gone
about as far as we could go)
- 53% of CO2 footprint (excl schools)
- Carbon reduction target, 60% by 2020/21 – not achievable without
significant change in street lighting
LED Technology
- Mainstream solution
- Up to 50% energy saving, can then be dimmed
- 70% reduction in maintenance cost, fewer faults
- Better light quality – whiter so easier to see
- Less light pollution – better focussed
- Lighting for residential areas relatively mature
- Traffic routes need brighter lighting – more
expensive but also more energy efficient, cost still likely to fall as matures
Before After
Example of LED Scheme
- 2
4 6 8 10 12 14 £ Millions
Street Lighting Budget Requirements including Energy from Waste
- traffic routes last, 60% GCC Funded, 70% dimming with CMS
Street Lighting Budget (energy, maintenance, CRC) Business as Usual, no LED @ market energy rate Business as Usual, no LED @ Energy from Waste facility energy rate LED with CMS - Glos-wide 60% GCC funding and 75% CMS coverage
MTC2 £1.7m cost avoidance, MTC2 Cashable saving Initial investment repaid
Driver replacement
Cost avoidance Cashable savings (after investment repaid)
- 5
10 15 20 25 30
Financial Year Start
Actual Emissions Predicted Business as Usual Emissions Target Emissions Emissions in Carbon Management Plan (Street Lighting Business as usual) LED no CMS, 50% dimming LED with 75% CMS, 50% Traffic Routes & 70% Residential
CO2 (thousand tonnes)
Carbon progress against 60% reduction target
- n 2006/07 baseline
Funding
- GCC Salix Fund
£1.5m
- National Seels (Salix)Fund
£4.67m
- DfT Challenge Fund £5.04m
- GCC Capital Receipts £2.51m
- Total £13.72m
Contract Process
- Used restricted EU tender process
- Tender process administered using South
West council’s “Pro-Contract” software
- Further to OJEU notice, Eleven companies
expressed interest and submitted a pre- qualification questionnaire (PQQ)
- Five companies invited to submit Tender bids
which were evaluated for whole life cost (70%) and quality (30%)
Contact Type
- Contract is based on HMEP, NEC 3 term
maintenance conditions of contract and is for up to 12 years
- Contract has 2 main elements;
– Core Investment
- Replacement of 54,325 Luminaires with LED light source)
- Replacement of 4,700 concrete columns
– Term Maintenance
- Includes reactive repairs
- Annual routine cyclic programme
- Attendance of emergencies
Phased Implementation
- The start of the contract was phased to provide
energy savings earlier and a smooth transition of service delivery.
- This was achieved by completing ‘Year 1’ of LED
replacement through the new contractor Skanska and continuing with our contract for maintenance through our incumbent contractor SSE
- In April 2016 Skanska became responsible for all
Core Investment, Customer Care & Term Maintenance
Guarantees
- The contract includes for
– 12 year warranty on all materials and labour for the LED Luminaires and Central Management System (CMS)
- Various other guarantee periods exist for
material items (for example LED Bollard gear trays - 5 years, Traffic Bollard shells - 2 years)
- 12 month guarantee for all other works
Key Performance Indicators (KPI)
- There are 17 KPI’s within the contract
- These monitor performance for all key work areas
including
– Energy Reduction – Concrete Column Replacement programme – Street Lighting units working as planned – Response time to reactive repairs – Customer satisfaction with service
- Each KPI is monitored monthly and any areas of non-
performance are addressed through the provision of service points and liquidated damages
Working Together
- Gloucestershire County Council and Skanska
are co-located in County Hall
- This aides communication, transfer of
information and problem solving
- We are working together on a variety of work