WERE The Scape pe C Cons nstruc uct information evening for - PowerPoint PPT Presentation

THE D DOCUME MENT: WERE The Scape pe C Cons nstruc uct information evening for Reside dent nts affected by the Ealing F Fields 2 2018 scheme. SPECIALI ECIALISTS STS IN FITTING OUT THE P PROJECT: AND Ealing Fields High School


  1. THE D DOCUME MENT: WE’RE The Scape pe C Cons nstruc uct information evening for Reside dent nts affected by the Ealing F Fields 2 2018 scheme. SPECIALI ECIALISTS STS IN FITTING OUT THE P PROJECT: AND Ealing Fields High School 2018 Temps THE P PROGRAMME MME: REFURBISHING 13 Weeks BUILDING ILDINGS, S, THE D DEADLINE: 3 rd September 2018 PROJECT O OVERV RVIEW: ALWAYS WAYS The relocation of modular buildings from Elthorne Park school to Ealing Fields School, with extensive Mechanical & Electrical COVERING ALL Upgrades. THE ANGLES 04 04

  2. Education & Skills Funding Agency Sharon McHale Project Director Mel Speed Project Manager Aecom Kevin Read Lead Technical Advisor Kate Wonson Technical Advisor Scape Construct Dave Shaw Project Director Dan Hickman Project Manager 18065@scapeconstruct.com 05 05

  3. Design Detailing to provide a solution that goes above and beyond. START O ON SITE TH JUNE 13 13 TH NE GROUND W WORK CO COMPLETE TH JULY 5 TH LY CRANE L LIFTS TS A AND T TRANSPOR ORTATION ON TH JULY TH JULY 6 TH LY – 16 16 TH LY ELTHO HORNE P PARK F FINISHE HED 23 RD JULY 23 LY EALING F G FIELDS F FINISHE HED TH AUGU 27 TH 27 GUST PROJ OJECT H HANDOV OVER RD SEPTEM 3 RD EMBER ER 06 06

  4. 6 6 - 8 LORRY LOADS P PER DAY HOLDIN ING A AREAS O ON SITE SPEED LIMIT 5 5 MPH NO WAIT ITIN ING ON ON PUBL BLIC R IC ROADS NO LOADS A AT P PEAK T K TIMES 07 07

  5. FENCE CED OF OFF T TURNIN ING A AREA BANKSMAN A AT A T ALL TIM TIMES SPEED LIMIT 5 5 MPH AC ACCESS T TO ALLOTMENTS PARKI KING S SPACES I INCREASED 08 08

  6. VICARAGE L E LANE F E FENCED ED O OFF BANKSMAN A AT A T ALL TIM TIMES SPEED LIMIT 5 5 MPH TREE W WORK T TO B BE R ROUTIN INE NO CRA RANE L E LIFTING O OVER ER P PARK RK FULLY CO CONTAIN INED SITE REPLACEM REP EMEMT OF SHRU RUBS 09 09

  7. Design Detailing to provide a solution that goes above and beyond. SITE H HOURS 7AM M – 6P 6PM NOISY W WOR ORKS RESTRICT ICTED T TO 9AM M – 4P 4PM WE WEEKEND W D WORKING NOT PROGRAMME MMED CO CONTRACT CTOR P PARKIN ING ON SITE O ONLY DUST CO CONTROL/CLEANIN ING DAILY LY DEL ELIVERY P PERI ERIODS RE RESTRICTED T TO 10A 10AM – 2: 2:30P 30PM / / 4P 4PM – 6P 6PM 10 10

  8. Design Detailing to provide a solution that goes above and beyond. ALL H HOARDING NG/FENCI NCING NG T TO B BE NETTED SIGNAG AGE 24/7 PROJE JECT CT T TEAM CO CONTACT CT NO UNSUPERVIS ISED W WORK CO CONSID IDERATE CO CONSTRUCT CTOR A AUDIT IT H&S &S AUDIT PUBLIC INFOR ORMATI TION ON P POINTS TS 11 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.