WERE The Scape pe C Cons nstruc uct information evening for - - PowerPoint PPT Presentation

we re
SMART_READER_LITE
LIVE PREVIEW

WERE The Scape pe C Cons nstruc uct information evening for - - PowerPoint PPT Presentation

THE D DOCUME MENT: WERE The Scape pe C Cons nstruc uct information evening for Reside dent nts affected by the Ealing F Fields 2 2018 scheme. SPECIALI ECIALISTS STS IN FITTING OUT THE P PROJECT: AND Ealing Fields High School


slide-1
SLIDE 1
slide-2
SLIDE 2

WE’RE SPECIALI ECIALISTS STS IN FITTING OUT AND REFURBISHING BUILDING ILDINGS, S, ALWAYS WAYS COVERING ALL THE ANGLES

THE D DOCUME MENT: The Scape pe C Cons nstruc uct information evening for Reside dent nts affected by the Ealing F Fields 2 2018 scheme. THE P PROJECT: Ealing Fields High School 2018 Temps THE P PROGRAMME MME: 13 Weeks THE D DEADLINE: 3rd September 2018 PROJECT O OVERV RVIEW: The relocation of modular buildings from Elthorne Park school to Ealing Fields School, with extensive Mechanical & Electrical Upgrades.

04 04

slide-3
SLIDE 3
slide-4
SLIDE 4

05 05 Education & Skills Funding Agency Sharon McHale Project Director Mel Speed Project Manager Aecom Kevin Read Lead Technical Advisor Kate Wonson Technical Advisor Scape Construct Dave Shaw Project Director Dan Hickman Project Manager

18065@scapeconstruct.com

slide-5
SLIDE 5
slide-6
SLIDE 6

Design Detailing to provide a solution that goes above and beyond.

START O ON SITE 13 13TH

TH JUNE

NE GROUND W WORK CO COMPLETE 5TH

TH JULY

LY CRANE L LIFTS TS A AND T TRANSPOR ORTATION ON 6TH

TH JULY

LY – 16 16TH

TH JULY

LY ELTHO HORNE P PARK F FINISHE HED 23 23RD JULY LY EALING F G FIELDS F FINISHE HED 27 27TH

TH AUGU

GUST PROJ OJECT H HANDOV OVER 3RD

RD SEPTEM

EMBER ER 06 06

slide-7
SLIDE 7

07 07 6 6 - 8 LORRY LOADS P PER DAY HOLDIN ING A AREAS O ON SITE SPEED LIMIT 5 5 MPH NO WAIT ITIN ING ON ON PUBL BLIC R IC ROADS NO LOADS A AT P PEAK T K TIMES

slide-8
SLIDE 8

08 08 FENCE CED OF OFF T TURNIN ING A AREA BANKSMAN A AT A T ALL TIM TIMES SPEED LIMIT 5 5 MPH AC ACCESS T TO ALLOTMENTS PARKI KING S SPACES I INCREASED

slide-9
SLIDE 9

09 09 VICARAGE L E LANE F E FENCED ED O OFF BANKSMAN A AT A T ALL TIM TIMES SPEED LIMIT 5 5 MPH TREE W WORK T TO B BE R ROUTIN INE NO CRA RANE L E LIFTING O OVER ER P PARK RK FULLY CO CONTAIN INED SITE REP REPLACEM EMEMT OF SHRU RUBS

slide-10
SLIDE 10

Design Detailing to provide a solution that goes above and beyond.

SITE H HOURS 7AM M – 6P 6PM NOISY W WOR ORKS RESTRICT ICTED T TO 9AM M – 4P 4PM WE WEEKEND W D WORKING NOT PROGRAMME MMED CO CONTRACT CTOR P PARKIN ING ON SITE O ONLY DUST CO CONTROL/CLEANIN ING DAILY LY DEL ELIVERY P PERI ERIODS RE RESTRICTED T TO 10A 10AM – 2: 2:30P 30PM / / 4P 4PM – 6P 6PM 10 10

slide-11
SLIDE 11

Design Detailing to provide a solution that goes above and beyond.

ALL H HOARDING NG/FENCI NCING NG T TO B BE NETTED SIGNAG AGE 24/7 PROJE JECT CT T TEAM CO CONTACT CT NO UNSUPERVIS ISED W WORK CO CONSID IDERATE CO CONSTRUCT CTOR A AUDIT IT H&S &S AUDIT PUBLIC INFOR ORMATI TION ON P POINTS TS 11 11