WERE The Scape pe C Cons nstruc uct information evening for - - PowerPoint PPT Presentation
WERE The Scape pe C Cons nstruc uct information evening for - - PowerPoint PPT Presentation
THE D DOCUME MENT: WERE The Scape pe C Cons nstruc uct information evening for Reside dent nts affected by the Ealing F Fields 2 2018 scheme. SPECIALI ECIALISTS STS IN FITTING OUT THE P PROJECT: AND Ealing Fields High School
WE’RE SPECIALI ECIALISTS STS IN FITTING OUT AND REFURBISHING BUILDING ILDINGS, S, ALWAYS WAYS COVERING ALL THE ANGLES
THE D DOCUME MENT: The Scape pe C Cons nstruc uct information evening for Reside dent nts affected by the Ealing F Fields 2 2018 scheme. THE P PROJECT: Ealing Fields High School 2018 Temps THE P PROGRAMME MME: 13 Weeks THE D DEADLINE: 3rd September 2018 PROJECT O OVERV RVIEW: The relocation of modular buildings from Elthorne Park school to Ealing Fields School, with extensive Mechanical & Electrical Upgrades.
04 04
05 05 Education & Skills Funding Agency Sharon McHale Project Director Mel Speed Project Manager Aecom Kevin Read Lead Technical Advisor Kate Wonson Technical Advisor Scape Construct Dave Shaw Project Director Dan Hickman Project Manager
18065@scapeconstruct.com
Design Detailing to provide a solution that goes above and beyond.
START O ON SITE 13 13TH
TH JUNE
NE GROUND W WORK CO COMPLETE 5TH
TH JULY
LY CRANE L LIFTS TS A AND T TRANSPOR ORTATION ON 6TH
TH JULY
LY – 16 16TH
TH JULY
LY ELTHO HORNE P PARK F FINISHE HED 23 23RD JULY LY EALING F G FIELDS F FINISHE HED 27 27TH
TH AUGU
GUST PROJ OJECT H HANDOV OVER 3RD
RD SEPTEM
EMBER ER 06 06
07 07 6 6 - 8 LORRY LOADS P PER DAY HOLDIN ING A AREAS O ON SITE SPEED LIMIT 5 5 MPH NO WAIT ITIN ING ON ON PUBL BLIC R IC ROADS NO LOADS A AT P PEAK T K TIMES
08 08 FENCE CED OF OFF T TURNIN ING A AREA BANKSMAN A AT A T ALL TIM TIMES SPEED LIMIT 5 5 MPH AC ACCESS T TO ALLOTMENTS PARKI KING S SPACES I INCREASED
09 09 VICARAGE L E LANE F E FENCED ED O OFF BANKSMAN A AT A T ALL TIM TIMES SPEED LIMIT 5 5 MPH TREE W WORK T TO B BE R ROUTIN INE NO CRA RANE L E LIFTING O OVER ER P PARK RK FULLY CO CONTAIN INED SITE REP REPLACEM EMEMT OF SHRU RUBS
Design Detailing to provide a solution that goes above and beyond.
SITE H HOURS 7AM M – 6P 6PM NOISY W WOR ORKS RESTRICT ICTED T TO 9AM M – 4P 4PM WE WEEKEND W D WORKING NOT PROGRAMME MMED CO CONTRACT CTOR P PARKIN ING ON SITE O ONLY DUST CO CONTROL/CLEANIN ING DAILY LY DEL ELIVERY P PERI ERIODS RE RESTRICTED T TO 10A 10AM – 2: 2:30P 30PM / / 4P 4PM – 6P 6PM 10 10
Design Detailing to provide a solution that goes above and beyond.