Construction Document Report
Scott W. Washington Director, School Construction March 10, 2016
WAVERLY ELEMENTARY SCHOOL Construction Document Report Scott W. - - PowerPoint PPT Presentation
Waverly Elementary School WAVERLY ELEMENTARY SCHOOL Construction Document Report Scott W. Washington Director, School Construction March 10, 2016 PARTNERS IN LEARNING Waverly Elementary School Project Update Kitchen renovation scope
PARTNERS IN LEARNING
Scott W. Washington Director, School Construction March 10, 2016
PARTNERS IN LEARNING
PARTNERS IN LEARNING
Aerial Building Photograph
PORTABLE CLASSROOM UNITS MODULAR CONSTRUCTION 2007 ADDITIONS
PARTNERS IN LEARNING
Proposed Site Plan
The following items are designated with numbers on the site plan: 1. Site access from Wetherburn Road off of Rt. 99/Old Frederick Road 2. Existing bus loop 3. Existing gymnasium and entrance reconfigured as new administration suite and secure entry vestibule, maintains the existing building entrance for community recognition 4. Cafetorium expansion 5. Expanded music program in reconfigured space and new one-story addition 6. New mechanical and electrical rooms in reconfigured space. New mechanical courtyard. 7. Reconfigured two-story addition 8. Existing building to be renovated 9. New gymnasium including office, toilet rooms and storage
equipment
The following items are changes made since the design development submission:
Alternate
as Bid Alternate
PARTNERS IN LEARNING
separation with use of operable and/or partial walls
school entrance and cannot be modified to establish secure entry condition
state standards
capacity
cross traffic and lack acoustic separation
population
PARTNERS IN LEARNING
The items below are designated with numbers on the floor plans: 1. Existing gymnasium converted to new administration suite with connected secure entry vestibule 2-3. Two-story classroom addition. 4. New gymnasium, storage, office and toilet rooms. 5. Existing administration suite converted to new COMAR compliant health suite and second art classroom. 6. Cafetorium expansion. 7. New music suite in existing mechanical space and new one-story addition. 8. New mechanical and electrical rooms within existing building
9. Media center is enclosed with new walls and doors to separate it from the corridor.
and surrounding corridors.
reconfigured as OT/PT and ESOL classrooms.
ADA compliant toilet rooms.
Extended learning rooms reconfigured to provide classroom access from pod common area - not through other classrooms.
The following items are changes made since the design development submission:
PARTNERS IN LEARNING
PARTNERS IN LEARNING
PARTNERS IN LEARNING
Base Construction Estimate Architect/Engineering Fee Construction Management Fee Related Costs Project Contingency Equipment and Technology Alt #1: Site Entry Improvements Alt #2: Parking expansion Alt #3: Gym Projector Alt #4: Gym Blinds Alt #5: Staff Lounge Expansion Alt #6: Ballfield Reconstruction Project Total Budget Funding Projections FY15 FY16 FY17 FY18 Total Funding Projections $26,320,821 $1,969,580 $1,996,427 $1,150,000 $1,150,000 $1,150,000 $71,867 $185,411 $25,353 $16,417 $47,894 $81,827 $34,165,597 $2,421,000 $3,770,000 $9,589,000 $18,396,000 $34,176,000