CITY OF LITTLE ROCK Public Works Department Ward 6 2016 to 2018 Street and Drainage Program Meeting April 13, 2015 CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT Ward 6 Sales Tax/Bond Projected Allocation 2013-2015 2016-2018 2019-2021 Sales
April 13, 2015 2
Ward 6
Sales Tax/Bond Projected Allocation
2013-2015 2016-2018 2019-2021
Sales Tax $ 2,600,000 $ 2,600,000 * $ 2,600,000
*
Bond $ 7,000,000 $ 5,750,000
*
Total $ 9,600,000 $ 2,600,000 * $ 8,350,000
* * Projected Funding
CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT
CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT
Ward 6 - 2013 to 2015 Bond/Sales Tax Summary
- A total of $2,600,000 in Sales Tax funding was allocated.
- A total of $7,000,000 in Bond Issues was allocated.
- In the 2013 to 2015 project request list, there were 22 jobs requested.
- A total of 4 Bond Program jobs and 4 Sales Tax Program jobs were
selected and are in the process of design, bidding, and construction.
- Currently 7 jobs (88%) are in design, 1 job (10%) is currently in
construction, and 0 jobs (0%) are totally complete.
April 13, 2015 3
CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT
4 April 13, 2015
CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT
- Ward 6 Sales Tax Project Status
April 13, 2015 5
Request # Location Description Status
Anticipated Bid Quarter
6-2 Malloy St Reconstruct roadway from 42nd St to Col. Glenn. In Design – 90% complete 2nd - 2015 6-7a Potter St Reconstruct roadway from Colonel Glenn to 40th St. In Design – 90% complete 2nd - 2015 6-9 a, b, c, d, e, f, g, h, I, j, k, l, m, n, o, p Broadmoor Subdivision Repair curb and gutter at multiple locations within the Broadmoor Subdivision area. Streets included are Broadmoor Dr, Glenmere Dr, Belmont Dr, Lakeshore Dr, Berkshire Dr, Barbara Circle, Archwood Dr. Design Pending 4th - 2015 6-100 36th St & Shackleford Add sidewalk, curb, gutter, underground drainage along both 36th St and Shackleford from Dartmouth on 36th St. west to Shackleford and going north on Shackleford 600 feet. This project would be phased. First phase would be adding improvements on a portion of 36th St. Phase I cost - $515,000. This would allow approximately 750 lf of roadway improvements. In Design – 80% complete 2nd - 2015
- Misc. Sidewalk
Design Pending
CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT
- Ward 6 Bond Project Status
April 13, 2015 6
Request # Location Description Status
Anticipated Bid Quarter
B-6a Kanis Road Design and acquire right-of-way from Shackleford to Bowman. Construct from Shackleford to Embassy Suites Dr. In Design – 50% complete 1st - 2016 B-6b Barrow Road Streetscape Improve designated route including street, trees, lighting, and sidewalk. In Design – 50% complete 4th - 2015 B-6c 36th Street Roundabout Reconstruct existing roundabout to include widening, landscape, sidewalk, curb and gutter. In Construction B-6d 44th St Reconstruct / widen street to current standards including curb, gutter, sidewalk, underground drainage system. In Design – 90% complete 2nd - 2015 Overlay Program In Construction – 36% complete
CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT
Ward 6 - 2016 to 2018 Project Request Summary
- Anticipated total of $2,600,000 in Sales Tax funding will be allocated.
- Currently there are 8 new requests.
- Deadline for Submission is May 1, 2015.
- For access to the Project Infrastructure Request form, citizens may:
1. Pick up a copy here
2. Go to website at http://www.littlerock.org/citydepartments/publicworks.aspx
Halfway down the page under “Civil Engineering”, click on “Infrastructure Request Form (Fillable)” link. 3. Send form to: City of Little Rock - Department of Public Works Infrastructure Project Requests 701 West Markham Little Rock, AR 72201 Email: PublicWorks@littlerock.org
April 13, 2015 7