Upcom ing Projects Strathcona County CEA Partnering with Industry Symposium January 2020 I ntroduction Relevant departments: Transportation Planning and Engineering (TPE) planning studies o roadway upgrades, or new o alignments


slide-1
SLIDE 1

Upcom ing Projects

Strathcona County

CEA Partnering with Industry Symposium January 2020

slide-2
SLIDE 2

I ntroduction

1/ 13/ 2020 2

Relevant departments:

  • Transportation Planning and

Engineering (TPE)

  • planning studies
  • roadway upgrades, or new

alignments

  • Transportation and Agriculture

Services

  • maintenance/ rehab of

transportation infrastructure

  • Planning and Development Services
  • Utilities
  • sanitary, water
  • Facility Services
  • Recreation, Parks and Culture
  • For more information: Strathcona.ca
slide-3
SLIDE 3

Approved 5 -Year Capital Plan

Transportation Planning and Engineering

  • Annual programs:

– Annual Missing Links Sidewalk Program

  • 2020: (Funding approved)

– Integrated Transportation Master Plan

  • 2021: (Tentative)

– Highway 15 / Highway 830 / Range Road 214 Interchange Study

  • 2022: (Tentative)

– Range Road 231 Design, Land, and Utilities, Wye Road to Hillshire Boulevard – Broadmoor Boulevard and Baseline Road Functional Planning Study

1/ 13/ 2020 3

slide-4
SLIDE 4

Approved 5 -Year Capital Plan

Transportation Planning and Engineering

  • 2023: (Tentative)

– South of LEA Functional Planning Study (Highway 21 to Range Road 222 and Township Road 530 to LEA Boundary)

  • 2024: (Tentative)

– Township Road 530 and Range Road 222 Intersection Improvements – Future Class l Grid Road Improvement project (design, land, utilities)

1/ 13/ 2020 4

slide-5
SLIDE 5

I ntegrated Transportation Master Plan ( I TMP) - RFP

  • ITMP 2020

– Transportation Planning and Engineering re-write ITMP – Public and stakeholder engagement – Guiding document for all transportation works

1/ 13/ 2020 5

slide-6
SLIDE 6

6

2021 (Tentative): INIT 121-FPS Highway 15 / Highway 830 / Range Road 214 Interchange Study Industrial Heartland Area

slide-7
SLIDE 7

7

2022 (Tentative): Range Road 231 Design, Land and Utilities Wye Road to Hillshire Boulevard

slide-8
SLIDE 8

8

2022 (Tentative): INIT 19 – FPS - Broadmoor Boulevard and Baseline Road Functional Planning Study

slide-9
SLIDE 9
  • Annual programs:

– Annual traffic and pedestrian safety

  • 2020: traffic calming construction

– Annual traffic signal/ intersection replacements

  • 2020 roadway improvements:

– Sherwood Drive, Ash Street to Village Drive, construction – Wye Road, Estate Drive to Clover Bar Road, widening construction – Township Road 550, Range Road 221 to Highway 830, widening construction

  • For more information: strathcona.ca/ transportation-roads/

Other Projects

Transportation Planning and Engineering

1/ 13/ 2020 9

slide-10
SLIDE 10

10

2020 - Sherwood Drive, Ash Street To Village Drive, Construction For more information: Search “Sherwood Drive Functional Improvements” at Strathcona.ca

slide-11
SLIDE 11

Transportation and Agriculture Services and Utilities Departm ents

  • no anticipated new capital projects in the 5-year capital

budget

  • maintenance and operations – periodically will have

Requests for Proposals for consulting services

1/ 13/ 2020 11

slide-12
SLIDE 12

Capital Projects

Facility Services Departm ent

  • Previously on-going projects:

– Multi-Purpose Agriculture Facility – Annual Facility Lifecycle Program

  • 2021-2024 tentative capital projects:

– Multi-Sport and Wellness Centre design (Recreation, Parks and Culture budget)

1/ 13/ 2020 12

slide-13
SLIDE 13

Projects

Recreation, Parks and Culture Departm ent

  • Projects vary:
  • typically new trails, landscaping, and gathering spaces (parks, amenities)
  • spray deck project anticipated in 2021
  • examples of past projects:

– paved trail connections in urban fringe areas – new trails with River Valley Alliance and TransCanada Trails – Ardrossan spray park – Emerald Hills Sports Pavilion

  • project management by Transportation Planning and Engineering department

1/ 13/ 2020 13

slide-14
SLIDE 14

Future Outlook

  • Future capital projects may

be created due to:

– emerging industrial development projects in Alberta’s Industrial Heartland – residential development – other emergent needs

1/ 13/ 2020 14

Heartland Area Map

slide-15
SLIDE 15

Questions?

1/ 13/ 2020 15

Garry Johnston, P.Eng., Manager, Project Construction and Engineering Transportation Planning and Engineering department Email: Garry.Johnston@strathcona.ca