CITY OF LITTLE ROCK Public Works Department Ward 2 2016 to 2018 Street and Drainage Program Meeting April 6, 2015 CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT Ward 2 Sales Tax/Bond Projected Allocation 2013-2015 2016-2018 2019-2021 Sales


slide-1
SLIDE 1

CITY OF LITTLE ROCK Public Works Department

April 6, 2015

Ward 2

2016 to 2018 Street and Drainage Program Meeting

slide-2
SLIDE 2

April 6, 2015 2

Ward 2

Sales Tax/Bond Projected Allocation

2013-2015 2016-2018 2019-2021

Sales Tax $ 2,600,000 $ 2,600,000 * $ 2,600,000

*

Bond $ 8,800,000 $ 5,750,000

*

Total $ 11,400,000 $ 2,600,000 * $ 8,350,000

* * Projected Funding

CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT

slide-3
SLIDE 3

CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT

Ward 2 - 2013 to 2015 Bond/Sales Tax Summary

  • A total of $2,600,000 in Sales Tax funding was allocated.
  • A total of $8,800,000 in Bond Issue funds was allocated.
  • In the 2013 to 2015 project request list, there were 61 jobs requested.
  • A total of 6 Bond Program jobs and 8 Sales Tax Program jobs were

selected and are in the process of design, bidding, and construction.

  • Currently 3 jobs (21%) are in design, 7 jobs (50%) are currently in

construction, and 4 jobs (29%) are totally complete.

April 6, 2015 3

slide-4
SLIDE 4

CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT

4 April 6, 2015

slide-5
SLIDE 5

CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT

  • Ward 2 Sales Tax Project Status

April 6, 2015 5

Request # Location Description Status

Anticipated Bid Quarter

2-5b Westminister Dr Replace curb and gutter and install underground drainage system at #45 Westminister Dr. Project Complete 2-6a Windamere Additional/continuation of drainage improvements from Windamere Dr. to Carlyle Dr. In Construction 2-9b Butler Rd Replace curb and gutter and install underground drainage system on Butler Rd at Allyson Circle. Project Complete 2-18a Tamela Dr Install additional curb inlets along Tamela Dr Between Valley and Ramona Dr. Project Complete 2-20 5919 Lancaster Improve drainage ditch along rear property lines for houses fronting Lancaster Rd and Lyndell Dr. In Construction 2-28 Woodson Rd Street reconstruction including curb, gutter, underground drainage system from Young Rd to Halifax Dr. (1270 lf) In Construction 2-32a Abigail St Replace curb and gutter, install underground drainage system from 8th to 10th In Construction 2-32d Adams St Install curb, gutter and underground drainage from W 12th St north to I- 630.

In Design – 98% complete 1st - 2015

slide-6
SLIDE 6

CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT

  • Ward 2 Bond Project Status

April 6, 2015 6

Request # Location Description Status

Anticipated Bid Quarter

B-2a Geyer Springs Railroad Overpass Grant match for new overpass. In Design - 1% complete AHTD Controlled B-2b Scott Hamilton Widen and improve roadway including sidewalks. In Construction B-2c Dailey Drive Sidewalk Install sidewalk From Baseline Rd South to Pulaski County SW Health Unit (575'). Project Complete B-2d West 10th St Improve roadway section including sidewalk, curb, gutter, and underground storm drainage. In Construction B-2e Traffic Calming Install traffic calming measures along Fair Park Blvd In Design - 60% complete 3rd - 2015 B-2f Elm St and Maryland St Elm St from 8th to Maryland, Maryland St west to Lewis In Construction Overlay Program In Construction – 44% complete

slide-7
SLIDE 7

CITY OF LITTLE ROCK PUBLIC WORKS DEPARTMENT

Ward 2 - 2016 to 2018 Project Request Summary

  • Anticipated total of $2,600,000 in Sales Tax funding will be allocated.
  • Currently there are 7 new requests.
  • Deadline for Submission is May 1, 2015.
  • For access to the Project Infrastructure Request form, citizens may:

1. Pick up a copy here

2. Go to website at http://www.littlerock.org/citydepartments/publicworks.aspx

Halfway down the page under “Civil Engineering”, click on “Infrastructure Request Form (Fillable)” link. 3. Send form to: City of Little Rock - Department of Public Works Infrastructure Project Requests 701 West Markham Little Rock, AR 72201 Email: PublicWorks@littlerock.org

April 6, 2015 7