VIJAY NIRMAN COMPANY PVT LTD ENGINEERS CONSTRUCTORS AN ISO - - PowerPoint PPT Presentation

vijay nirman company pvt ltd
SMART_READER_LITE
LIVE PREVIEW

VIJAY NIRMAN COMPANY PVT LTD ENGINEERS CONSTRUCTORS AN ISO - - PowerPoint PPT Presentation

VIJAY NIRMAN COMPANY PVT LTD ENGINEERS CONSTRUCTORS AN ISO CERTIFIED COMPANY 04 DECADES OF ENGINEERING EXCELLENCE Our VISION A RESPECTED INFRASTRUCTURE ORGANIZATION WITH ETHICAL STANDARDS, COMMITTED TO QUALITY, RELIABILITY AND


slide-1
SLIDE 1

VIJAY NIRMAN COMPANY PVT LTD

ENGINEERS CONSTRUCTORS AN ISO CERTIFIED COMPANY

04 DECADES OF

ENGINEERING EXCELLENCE

slide-2
SLIDE 2
  • A

RESPECTED INFRASTRUCTURE ORGANIZATION WITH ETHICAL STANDARDS, COMMITTED TO QUALITY, RELIABILITY AND CONTINUOUS TECHNOLOGY UP GRADATION.

  • CUSTOMER CENTRIC BY BUILDING BEST RELATIONSHIPS WITH OUR

CLIENTS IN TERMS OF PERFORMANCE, TRUST AND CUSTOMER SATISFACTION.

  • AN

ENTERPRISE PROVIDING OUR EMPLOYEES A POSITIVE ENVIRONMENT FOR CONTINUOUS LEARNING, MOTIVATION, CHALLENGE IN WORK PLACE AND REWARDING THEM SUITABLY.

  • RECOGNIZED

FOR TREATING ALL OUR STAKEHOLDERS WITH GRATITUDE, DIGNITY AND OPTIMIZING THEIR INVESTMENT WITH US.

  • A RESPONSIBLE CORPORATE IMPROVING THE QUALITY OF LIFE

WITHIN AND OUTSIDE THE ORGANIZATION.

Our VISION

slide-3
SLIDE 3

VNC VALUES

slide-4
SLIDE 4

Company Overview

  • Vijay Nirman Company Private Limited (‘VNC’) was promoted

by Dr.S.Vijaya Kumar, in 1982

  • Engaged in civil construction works such as

 Urban Infrastructure –Residential, Commercial, Institutional  Roads & Associated Structures like Flyovers, Bridges, ROB’s, Viaducts, Metro Works  Industrial structures, Ports, Power plants, Steel plants, and other Marine works.  Foundation works like Piling, Diaphragm wall etc.

  • Corporate Office is in Visakhapatnam and has operating offices at Bangalore,

Nagpur, Hyderabad, Chennai, Delhi.

  • Has over 1,700 employees and has executed over 450 projects.
  • Infrastructure and deliverance confirming to international standards in terms of

quality and Safety

  • ISO 9001:2015 & OHSAS 18001 : 2007 certified company.
slide-5
SLIDE 5

We Only Look Forward

VNC is a multi-faceted organization with the power to craft everything from concept to commissioning

  • efficiently. Our adherence to quality, in-time delivery

and cost-effectiveness has made us a name to reckon with the engineering industry. We deliver projects that are engineering marvels, with our construction and engineering excellence that keeps getting better by the

  • day. What started as the Chairman Dr.S.Vijaya Kumar’s

dream is today an extremely powerful reality and that has only been possible because of his perceptive vision and progressive thinking. We have been successful in building a solid platform for a more aggressive industrial and infrastructural growth in India and eventually the world. No matter what stands against us, what we stand for gives us the strength to keep marching ahead. The strength of the company has always been the core values, which have enabled us to build long time relationship with all the clients.

slide-6
SLIDE 6

KEY PERSONNEL

  • Dr. S.Vijaya Kumar, ME (Structure),Ph.D

Chairman

  • Dr. Vijaya Kumar established Vijay Nirman

Company in the year 1982 and leads the Company from the front. He has nurtured the company on the tenets of professionalism, excellence and quality. He empowers the core team as well as employees with the twin mantras of freedom and trust

A.V.V.V.Prasad (Vishnu), M.Sc. Vice Chairman

  • Mr. Vishnu has over 35 years of experience in

execution

  • f

several projects encompassing Pile Foundations, Bridges, Marine Works and Industrial Structures, housing projects and multi-stored buildings.

  • V. Ajay Kumar, B.Tech, MS

Managing Director

  • Mr. Ajay Kumar has done his Masters in Technical

Management from Eastern Michigan University, USA and has over 15 years (National and International ) experience in Corporate Business Management and Strategic Planning. Y.V. Ramana, M.Tech(Geo Engg) Chief Executive Officer (CEO)

  • Mr. Ramana has over 33 Years
  • f experience in

executing number of projects involving Marine works, Industrial Infrastructure and Buildings Projects. Business development is his forte.

slide-7
SLIDE 7

KEY PERSONNEL

A.S. MAHALLE, B.E. COO -Projects

  • Mr. Mahalle has over 30 years of experience in executing projects in the fields of Marine Works, Power

Plants, Cement & Steel Plants, Residential Buildings, Water Supply Projects etc.

  • M. Vamsidhar, MBA

Dy COO-Projects

  • Mr. Vamsidhar has over 20 years of experience in construction industry involving industrial and urban

infrastructure such as Buildings & Housing, transportation structures including grade separation units, industrial buildings, intricate foundations etc. Cmde(Retd). N. Krishna Rao, M.Tech (Mech) Director-Projects He has more than 32 years of experience in Indian Navy and had executed various industrial projects . As DDG-DGNP, he had handled Marine Infrastructure and Equipments. He is a recipient of Nausena Medal from the President of India.

slide-8
SLIDE 8

a) Management

  • 06

Nos b) Business Development

  • 03

Nos c) Civil/Technical

  • 579 Nos

d) Design Department

  • 02

Nos e) Finance and Accounts

  • 72

Nos f) Form Work Department

  • 14

Nos g) HR, Admin and IT

  • 113

Nos h) MEP

  • 150 Nos

i) Plant & Machinery

  • 110 Nos

j) Quality Assurance & Control

  • 51

Nos k) QS, Planning & Contracts

  • 32

Nos l) Stores & Procurement

  • 106 Nos

m) Safety Department

  • 61

Nos n) Technical Consultants

  • 01

Nos

  • ) VNC Academy
  • 02

Nos TOTAL

  • 1302 Nos

TOTAL MANPOWER WITH THE COMPANY

slide-9
SLIDE 9

MAJOR PLANT AND EQUIPMENT

Sl.N

  • Equipment

Capacity No s 1 Hydraulic Piling Rig 600-1800 dia 12 2 Conventional Piling Rigs 33 3 Vibro Hammer 4 Tons 2 4 Crawler Cranes 18T to 70 T 10 5 Hydraulic Cranes 10T-12T 18 6 Batching Plant 20-30 Cum 20 7 Mini Batching Plant 12 Cum 15 8 Concrete Mixer 28 9 Transit Mixer 6 Cum 66 10 Concrete Pump 350 CC 20 11 Boom Placer 36 m reach 4 12 Hydraulic Excavator 1-2 Cum 3 13 Front End Loader & Wheel Loader 0.5 Cum 15 14 Earth Rammer 17 15 Dumpers/Tippers/Tr ucks 9-14 Cum 27 16 Welding Rectifiers 100-400 Amps 212

Sl.N

  • Equipment

Capacit y Nos 17 SAW/MIG Welding Machine 8 18 Crusher 200 TPH 1 19 Motor Grader 2 20 WMM Plant 1 21 Vibratory Soil Compactors 3 22 Asphalt Hot Mix Plant 1 23 Road Paver 2 24 Kerb Placing Machine 2 25 Pneumatic Tyre Roller 3 26 Tower Cranes 1-6 Tons 12 27 Tower Hoist with Winch 9 28 Diesel Generators (5-250 kVA) 50 29 Electrical Pump Sets 36 30 Survey Equipment (Total Station) 15 31 Weigh batchers 16 32 Trailers 9

slide-10
SLIDE 10

691.57 637.2 659.92 871.48 1045.64 212.22 145.31 145.93 196.96 208.01

200 400 600 800 1000 1200 2014-15 2015-16 2016-17 2017-18 2018-19

Financial Strength

Turnover Net worth

slide-11
SLIDE 11

VNC CONSTRUCTION ACADEMY

We Empower the leaders of tomorrow

The construction Industry is one of the fastest growing industries in

  • India. To compliment this growth, we started the VNC Construction

Academy, an in-house training institute that aims at producing Site Engineers and Supervisors who are prepared for the challenges of tomorrow. Training is imparted to select individuals in the fields of Formwork, Bar Bending, Steel Fixing, Masonry Works, Scaffolding, Laboratory Testing of Materials, Surveying etc. 80% of our trainees are from economically weaker sections of the society. The academy has successfully produced 85 site engineers and 530 site supervisors who now have a firm grip on quality standards. VNC’s belief in the motto ‘Healthy body makes a healthy mind’ has led to the introduction of Yoga Regime, Physical Training, Safety Drills and First Aid Training to the students. We transform learners into competitive individuals and empower them to lead the future.

slide-12
SLIDE 12

CORPORATE SOCIAL RESPONSIBILITY

Social : Established the ‘GokulChandra and Rahul Chandra Memorial Charitable Trust”, which benefits the underprivileged strata of the society. Supporting SOS village and Rotary Club. Health :

  • Financial Assistance for Cancer Patients
  • Providing Hearing aids to the deaf
  • Securing Insurance for HIV patients.

Education and Sports :

  • Awarding scholarships to intermediate and graduate

students.

  • Distribution of books, Uniforms and Mid-day meals to

primary school children.

  • Renovation of old school and college buildings
  • Providing sports gear to the deserving and the needy in

the fields of skating and archery

  • Sponsoring boxing gear.
slide-13
SLIDE 13

AWARDS

CMD receiving Vishwakarma Award from Chairman of the Prime Minister’s Economic Advisory Council, Dr. C.Rangarajan Indian Achievers Award for business excellence on the occasion of 29th Indian International achievements award ion INDO- THAI business Relations.

ISO CERTIFICATES

slide-14
SLIDE 14

Every Project Is A Mark Of Quality And Performance On Time

Every project we build is a mark of quality and performance, meets global standards and exceeds the customer’s expectations. To us, every project is a new challenge, an

  • pportunity

to showcase

  • ur

versatility and technological

  • innovation. We believe and practice

‘Nothing is impossible’. Our core competence is structured project management, acquired over years of working towards building

  • utstanding projects that are the pride
  • f our nation.
slide-15
SLIDE 15

Creating New Opportunities

Our specialized services come with trust and value, and we are synonymous with diversity. VNC is where expertise and experience converge and effectively diverge as smart solutions for all construction and infrastructure activities. With our enterprising spirit, we have established a bold presence in the following areas:- Roads, Bridges & Metro

  • National and State Highways
  • Bridges, Interchanges, Flyovers and Viaducts
  • Viaducts, Metro Rail Transport works including Ballast-less Tracks

Industrial Infrastructure

  • Material Handling Systems
  • Industrial Buildings
  • Power Plants
  • Integrated Steel Plants and other Metallurgical Units
  • Electrical substations, H.T & E.H.T. Transmission Lines
  • Cement Plants

Urban Infrastructure

  • Residential/Commercial Buildings
  • Water Treatment Plants and Distribution
  • Sewage Treatment Plants and Network
  • Desalination Plants

Ports & Terminals

  • Piling Works
  • Marine Structures
  • Diaphragm Walls
slide-16
SLIDE 16

ROADS S AND ND BR BRIDGES ES

slide-17
SLIDE 17

ROADS AND BRIDGES

  • WIDENING OF EXISTING ROAD TO 2 LANE NH STANDARDS

ALONG WITH IMPROVEMENT AND RE-ALIGNMENT FROM KM 0+000 TO KM 57+250 IN THE STATE OF ARUNACHAL PRADESH ON NH NO.229 - PACKAGE – I FOR SUSHEE INFRA.

  • CONTRACT

KC-17R: (1) CONSTRUCTION OF ELEVATED VIADUCT, THREE STATIONS VIA: ERNAKULUM SOUTH, THAIKOODAM AND PETTA INCLUDING ARCHITECTURAL FINISHING, PLUMBING AND ELECTRICAL WORKS ON ALWAYE- PATTA LINE OF KOCHI METRO RAIL PROJECT.

  • CONSTRUCTION OF FOUR LANE APPROACH RAMP AT RAJIV

GANDHI INTERNATIONAL AIRPORT HYDERABAD FOR GMR.

  • VUDA -

CONSTRUCTION OF A COMPOSITE LEVEL GRADE SEPARATOR WITH ARCHITECTURAL FINISHING, AESTHETICS, SERVICE ROADS ETC, AT NAVAL ARMAMENT DEPOT (NAD) JN. IN VISAKHAPATNAM.

  • DESIGN AND CONSTRUCTION OF CIVIL, STRUCTURES AND

TRACK WORKS FOR DOUBLE LINE RAILWAY INVOLVING FORMATION IN EMBANKMENT/CUTTING, BALLAST ON FORMATION, TRACT WORKS, BRIDGES, STRUCTURES, BUILDINGS, YARDS, INTEGRATION WITH IR EXISTING RAILWAY SYSTEM AND TESTING AND COMMISSIONING ON DESIGN-BUILD LUMP SUM BASIS FOR NEW KARCHANA STATION . -202 D IN KANPUR.

Ongoing Projects

slide-18
SLIDE 18

ROADS AND BRIDGES

  • CONSTRUCTION

OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY (NH NO.11) PACKAGE I THE STATE OF HARYANA AT SONIPAT FOR SADHBAV.

  • 4 LANING OF JHANSI - KHAJURAHO SECTION -I OF NH -

75/76 IN THE STATE OF UP & MP (SECTION-1 JHANSI JN. WITH NH 25 TO NH-75 ALLAHABAD JUNCTION FOR PNC

  • CONSTRUCTION

OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY (NH NO.11) PACKAGE II FROM KM 22.000 TO KM46.55 - LOI FOR STRUCTURE WORKS FROM KM33.880 TO KM 46.55 IN THE STATE OF UP AT GHAZIABAD FOR SADHBAV

  • CONTRACT CC-47 : PART DESIGN & CONSTRUCTION OF

ELEVATED VIADUCT FROM MUNDKA TO TIKRI BORDER, SIDING AT TIKRI BORDER AND FOUR ELEVATED STATIONS FOR SADHBAV

  • CONSTRUCTION

OF ROAD BRIDGE WORKS IN BHAVNAGAR-TALAJA SECTION OF NH-8E IN THE STATE OF GUJARAT TO BE EXECUTED ON HYBRID ANNUITY MODE UNDER NHDP PHASE IV PROJECT.

Ongoing Projects

slide-19
SLIDE 19

ROADS AND BRIDGES

  • DESIGN AND CONSTRUCTION OF CIVIL, STRUCTURES AND TRACK WORKS

FOR DOUBLE LINE RAILWAY INVOLVING FORMATION IN EMBANKMENT/CUTTING, BALLAST ON FORMATION, TRACT WORKS, BRIDGES, STRUCTURES, BUILDINGS, YARDS, INTEGRATION WITH IR EXISTING RAILWAY SYSTEM AND TESTING AND COMMISSIONING ON DESIGN-BUILD LUMP SUM BASIS FOR MUGHAL SARAI TO NEW KARCHANA STATION-201 B IN MIRZAPUR.

  • CONSTRUCTION OF SRCPL PHASE – IIB (CH. 54 TO 70 KM) ON ENGINEERING,

PROCUREMENT AND CONSTRUCTION (EPC) BASIS. (SARGUJA RAIL CORRIDOR) FOR ADANI.

  • ROADS AND BUILDING WORKS FOR RAJURA CHECK POST, KHARPI CHECK

POST AND BILIOLI CHECK POST - MOBILISATION AND COMPUTERISATION OF INTEGRATED BORDER CHECK POSTS AT 22 LOCATIONS IN THE STATE OF MAHARASHTRA FOR SADBHAV ENGINEERING LIMITED.

  • REHABILITATION AND UP-GRADATION TO FOUR LANING OF CHHAPRA-

HAJIPUR SECTION OF INCLUDING MAJOR RIVER BRIDGE ACROSS GANDAK RIVER

  • CONSTRUCTION

OF APRON STANDS BETWEEN TAXIWAY M1-L1 AND ASSOCIATED WORKS AT IGI AIRPORT ,NEW DELHI(PHASE-3A)

  • CONSTRUCTION

OF APRON STANDS BETWEEN TAXIWAY L1-L2 AND ASSOCIATED WORKS AT IGI AIRPORT ,NEW DELHI(PHASE-3A)

  • CONSTRUCTION OF FBO/MRO FACILITIES AT IGI AIRPORT ,NEW DELHI

Ongoing Projects

slide-20
SLIDE 20

SARGUJA RAIL CORRIDOR

slide-21
SLIDE 21

4 LANE APPROACH RAMP WORK AT RGIA- HYDERABAD

ROADS AND BRIDGES

slide-22
SLIDE 22

4 LANE APPROACH RAMP WORK AT RGIA- HYDERABAD

ROADS AND BRIDGES

slide-23
SLIDE 23

APRON STANDS – M1 L1 , DELHI INTERNATIONAL AIRPORT ROADS AND BRIDGES

slide-24
SLIDE 24
  • CONSTRUCTION

OF VIADUCT INTERCHANGE, BRIDGES AND VEHICULAR UNDERPASS, WHICH INCLUDES PILING WITH HYDRAULIC RIGS, SUBSTRUCTURE WITH RCC, SUPERSTRUCTURE WITH PRECAST PRE-STRESSED PRECAST CONCRETE GIRDER, TRANSPORTATION & LAUNCHING AT REQUIRED SPANS OF STRUCTURES.

  • CONSTRUCTION OF OUTER RING ROAD (ORR) ON DESIGN, BUILD,

FINANCE, OPERATE AND TRANSFER (DBFOT) - CONSTRUCTION OF MAJOR STRUCTURES FROM KM 0.00 TO KM 12.00 (PKG-2).

  • CONSTRUCTION OF STRUCTURE WORK FROM KM.0.000 TO KM.57.000

OF THE CHHINDWARA RING ROAD EXCLUDING THE PORTION FROM

  • KM. 23.553 TO KM 29.275 , KM 167.700 IMLIKHERA JUNCTION AND ERR.
  • CONSTRUCTION

OF STRUCTURE WORK FROM KM.193.000 TO KM.222.000 ON THE PROJECT HIGHWAY - FOUR LANING OF GOMTI CHAURAHA - UDAIPUR SECTION OF NH-8 (FROM KM.177/000 TO KM 260/100) IN THE STATE OF RAJASTHAN UNDER NHDP PHASE IV ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (TOLL) BASIS.

  • MRTS - PHASE - II - EXTENSION FROM VELACHERY TO ST. THOMAS

MOUNT - PROPOSED ELEVATED SUPERSTRUCTURE CONSISTING OF PSC BOX GIRDERS, "U" TYPE PSC DECK SLABS AND OTHER RCC WORKS, PROTECTIVE COATING TO PSC GIRDERS ETC. OVER ALREADY COSTRUCTED SUB STRUCTURE BETWEEN CHAINAGE 19750 AND 23350.

Major Completed Projects

ROADS AND BRIDGES

slide-25
SLIDE 25
  • CONSTRUCTION

OF BRIDGE ACROSS ENNORE CREEK TO ENNORE EXPRESSWAY NORTH CHENNAI.

  • LC-3 – CONSTRUCTION OF ROAD OVER BRIDGE IN LIEU OF EXISTING LC-3

BETWEEN THONDIARPET AND TIRUVOTTIYUR RAILWAY STATION NEAR TIRUVOTTIYUR MATTUMANDHAI.

  • FOUR LANING OF BETWEEN KM 00.00 TO KM 80.858 OF ROHTAK TO PANIPAT

SECTION OF NH-71 IN THE SATE OF HARYANA.

  • CONSTRUCTION OF ROB IN ATHIPATTU, BETWEEN ENNORE -ATHIPATTU

STRETCH IN RAILWAY PORTION AT 2/610 OF NORTH CHENNAI THERMAL POWER STATION (NCTPS) ROAD, CHENNAI, TAMILNADU.

  • CONSTRUCTION OF THREE LANE BRIDGE ADJACENT TO THE EXISTING THIRU-

VI-KA BRIDGE ACROSS ADYAR RIVER CHENNAI.

  • WIDENING OF 4 LANING AND STRENGTHENING OF EXISTING TWO LANE

CARRIAGE FROM KM 0+313 TO 27+280 ON SALEM ULUNDERPET SECTION OF NH-68 IN TAMIL NADU.

  • CONSTRUCTION OF PROPOSED MAJOR BRIDGES PSC BOX / I-GIRDER WITH

PILE FOUNDATIONS FOR COAL CONVEYOR SYSTEM AND FOR CARRYING PIPE LINE PASSING ACROSS RAILWAY LINES BETWEEN ATTIPATTU PUDUNAGAR - ENNORE STATIONS AND ENNORE CREEK, BUCKINGHAM CANAL DULY CONNECTING VALLUR THERMAL POWER PLANT OF M/S.NTECL AND NORTH CHENNAI THERMINAL POWER STATION AT VALLUR FOR RITES.

Major Completed Projects

ROADS AND BRIDGES

slide-26
SLIDE 26
  • BRIDGES, UNDERPASSES AND ROBS FOR FOUR LANING & STRENGTHENING OF

EXISTING 2 LANE OF TINDIVANAM – ULUNDURPET SECTION OF NH-45 IN TAMILNADU FOR GMR PROJECTS PVT. LTD.

  • MAJOR AND MINOR BRIDGES INCLUDING RE WALLS, WELL FOUNDATIONS,

KERBS AND REHABILITATION WORKS OF WESTERN TRANSPORT CORRIDOR TUMKUR - HAVERI NH-4 PROJECT OF NHAI FOR UE DEVELOPMENT INDIA PVT LTD.

  • CONSTRUCTION OF ROAD OVER BRIDGE NEAR PAKUR STATION IN JHARKHAND

FOR KONKAN RAILWAY CORPORATION.

  • CONSTRUCTION OF RAIL BRIDGE ACROSS LAKSHMANTEERTHA RIVER IN

MYSORE- HASSAN SECTION FOR SOUTHERN RAILWAYS.

  • MAIN CARRIAGEWAY CONSTRUCTION OF ELEVATED HIGHWAY OF HOSUR

ROAD, BANGALORE FOR MAYTAS.

  • CONSTRUCTION

OF SUBSTRUCTURE AND SUPER STRUCTURE FOR METROPOLITAN TRANSPORT PROJECT (RAILWAYS), CHENNAI OF MRTS PHASE- II IN TIRUMALAI- VELACHERY SECTION.

  • RECONSTRUCTION OF SUBSTRUCTURE OF 275M LONG RAILWAY BRIDGE OVER

RIVER KADALUNDI FOR SOUTHERN RAILWAYS, KERALA CONSISTING OF 44 NOS PILES OF 1000MM DIA. AND ASSOCIATED CIVIL WORKS OF THE BRIDGE – THIS PROJECT HAS BEEN COMPLETED WITHIN A RECORD TIME OF 43 DAYS AND WON THE COMPANYA LETTER OF APPRECIATION FROM THE CLIENT.

“ The affected (Kadalundi) bridge has been rebuilt in less than 45 days. Considering that this was done during the monsoon across one of the backwaters of Kerala, it is not less than a miracle. M/s Vijay Nirman Company adopted the unique concept using the railway track for doing the work of bored piles..” M.Ravindra, Former Chairman, Railway Board

ROADS AND BRIDGES

Major Completed Projects

slide-27
SLIDE 27

ROADS AND BRIDGES

Udaipur GMR Outer Ring Road (ORR), Chennai

Tambaram-Tindivanam Road Project, Road works at Acharapakkam &Melmaruvathur.

slide-28
SLIDE 28

ROADS AND BRIDGES

Bridge across Lakshmanteertha river Metropolitan Transport Project, Chennai

slide-29
SLIDE 29

ROADS AND BRIDGES

MTP, Chennai

slide-30
SLIDE 30

ROADS AND BRIDGES

YAMUNA EXPRESS WAY-DELHI

slide-31
SLIDE 31

ROADS AND BRIDGES

Tapi River Bridge

slide-32
SLIDE 32

URBAN INFRASTRUCTURE

slide-33
SLIDE 33

URBAN INFRASTRUCTURE

Sea Valley Resorts – Varun Beach Novotel Hotel, Visakhapatnam

slide-34
SLIDE 34

Urban Infrastructure - Residential/Commercial Buildings

Major Ongoing Projects

  • CONSTRUCTION

OF HOUSING TOWNSHIP USING SHEAR WALL TECHNOLOGY FOR APITDCO AT VIZIANAGARAM, SRIKAKULAM, VIZAG DISTRICT – PHASE 1 OF 5440 UNITS WITH AREA OF 18.79 LAKHS

  • SFT. VALUED AT RS.321 CRORES.
  • CONSTRUCTION

OF HOUSING TOWNSHIP USING SHEAR WALL TECHNOLOGY FOR APITDCO AT VIZIANAGARAM DISTRICT OF 7677 UNITS WITH AREA OF 26.51 LAKHS SFT. VALUED AT RS.418.44 CRORES.

  • CONSTRUCTION

OF HOUSING TOWNSHIP USING SHEAR WALL TECHNOLOGY FOR APITDCO AT SRIKAKULAM DISTRICT OF 4773 UNITS WITH AREA OF 16.48 LAKHS SFT. VALUED AT RS.261 CRORES

  • CONSTRUCTION

OF ACADEMIC BLOCK (NORTH WEST), HOSTEL 02 BLOCK (INCLUDING INTERNAL, PLUMBING, ELECTRICAL WORKS FIREFIGHTING, VENTILATION AND IBMS FOR BOTH BLOCKS) AND INFRASTRUCTURE & ALLIED WORKS IIT CHITTOR, SRICITY ANDHRA PRADESH

slide-35
SLIDE 35

APTIDCO Housing Project

slide-36
SLIDE 36

APTIDCO Housing Project

slide-37
SLIDE 37

Urban Infrastructure - Residential/Commercial Buildings

Ongoing Projects

Sl. No Description of tower Area per Floor Area over all project Qty (Sqm) Qty (Sft) Qty (Sqm) Qty (Sft) A AMALFI TOWER Typical floor (36 floors) 1,048 11,281 37,728 406,104 Basement (3 Floors) 5,504 59,246 16,512 177,738 Total 6,552 70,527 54,240 583,842 B TIANA TOWER Typical floor (34 floors) 1,019 10,965 34,635 372,816 Basement (3 Floors) 6,505 70,024 19,516 210,072 Total 7,524 80,989 54,152 582,888 C ANCHORAGE TOWER Typical floor (46 floors) 1,107 11,911 50,904 547,926 Basement (2 Floors) 5,806 62,492 11,611 124,983 Total 6,912 74,403 62,515 672,910 A+B +C Total Area 170,907 1,839,640

Hiranandani – Project Details

slide-38
SLIDE 38

URBAN INFRASTRUCTURE

Ongoing Projects

  • CONSTRUCTION OF HIGH RISE RESIDENTIAL APARTMENTS WITH A

BUILT-UP AREA OF 7M25M000 SFT AT VIJAYAWADA FOR VNC-GEV HOUSING.

  • CONSTRUCTION OF HIRANANDANI COTTAGES AND APARTMENTS FOR

HIRANANDANI UPSCALE PROJECT AT DEVANAHALLI, BANGALORE.

  • CONSTRUCTION OF 36 FLOORS OF RESIDENTIAL DEVELOPMENT FOR

“HIRANANDANI AMALFI” FOR HIRANANDANI DEVELOPERS AT CHENNAI.

  • VIT-AP AMARAVATHY CAMPUS
  • PROPOSED CONSTRUCTION OF BOYS

HOSTEL & GIRLS HOSTEL –HB2 (G+14 FLOORS) AT INNAVOLU VILLAGE.

  • CONSTRUCTION OF CIVIL WORKS FOR ANCHORAGE BASEMENT AND

BUILDING WORK FOR HIRANANDANI DEVELOPERS AT CHENNAI. (45 FLOOR TOWER WHICH IS TALLEST BUILDING IN SOUTH INDIA)

  • CONSTRUCTION OF TOWNSHIP FOR TATA PROJECTS AT THEIR POWER

PLANT IN NELLORE, ANDHRA PRADESH

slide-39
SLIDE 39

URBAN INFRASTRUCTURE

Ongoing Projects

slide-40
SLIDE 40

URBAN INFRASTRUCTURE

Convention Centre at RGIA, Hyderabad

slide-41
SLIDE 41

Urban Infrastructure - Residential/Commercial Buildings

  • CONSTRUCTION OF ESIC MEDICAL COLLEGE AT

SANATHANAGAR, HYDERABAD .

  • CONSTRUCTION OF CLIENTS PROJECT OFFICE &

ITS FACILITIES, PROJECT CONSTRUCTION PACKAGES – 6,7,8,9,IT, HT, WWT, ANNEXURE BUILDINGS, GATES & CATTLE GRIDS & MISCELLANEOUS WORKS. FOR FORD INDIA PVT LTD .

  • CONSTRUCTION

OF TWIN TOWERS “LANSUM OXYGEN TOWERS” OF G+35 FLOORS AT VISAKHAPATNAM.

Completed Projects

ESI Medical Collage Building Ford India Plant, Ahmedabad Hotel & Multiplex complex, Visakhapatnam

slide-42
SLIDE 42

URBAN INFRASTRUCTURE RESIDENTIAL/COMMERCIAL BUILDINGS

  • CIVIL WORKS OF SEA VALLEY RESORTS WITH A BUILT

UP AREA OF 6,00,000 SFT, A MULTIPLEX AND HOTEL IN VISAKHAPATNAM.

  • CONSTRUCTION OF 125 INDEPENDENT VILLAS AT

CLOUD-9, INCLUDING ALL CIVIL WORKS, INTERNAL ELECTRICAL AND SANITARY WORKS IN BENGALURU FOR NU- TECH PRASIDDHI PROPERTIES.

  • CHALUKYA HOLIDAY RESORTS (2 BASEMENTS + 14

FLOORS) AT BENGALURU WITH A BUILT UP AREA OF 3,30,000 SQFT.

  • CIVIL AND ARCHITECTURAL WORKS FOR

‘ROYAL LEGEND’ HIGH RISE BUILDINGS OF 11 BLOCKS OF 7 STORIED BUILDINGS WITH A BUILT UP AREA OF 6,00,000 SFT AT BOMMANAHALLI, BENGALURU.

  • HIGH

QUALITY LUXURY APARTMENTS CALLED ‘ATRIA TOWERS’ WITH A BUILT UP AREA OF 3,00,000 SFT IN BENGALURU, DESIGNED BY SAA-SINGAPORE, CONSISTING OF THREE BLOCKS, 16 FLOORS WITH SWIMMING POOL, CLUB HOUSE ETC.

Completed Projects

Cloud 9, Bangalore Royal Legend, Bangalore

slide-43
SLIDE 43

URBAN INFRASTRUCTURE RESIDENTIAL/COMMERCIAL BUILDINGS

  • RESIDENTIAL APARTMENTS ‘HM TROPICAL TREE’

WITH BUILT UP AREA OF 1,50,000 SFT IN BENGALURU FOR HM INFRATECH PVT LTD.

  • CONSTRUCTION OF DIAPHRAGM WALL AND PILING

WORKS FOR A COMMERCIAL COMPLEX IN BANGALORE USING TOP DOWN CONSTRUCTION.

  • CONSTRUCTION

OF RESIDENTIAL GOLF VIEW APARTMENTS FOR TULSIANI DEVELOPERS AT LUCKNOW.

  • CIVIL WORKS FOR CONSTRUCTION OF APARTMENT

FOR HIRANANDANI CYPRESS AT DEVANAHALLI, BENGALURU

  • CIVIL WORKS FOR CONSTRUCTION OF HIGH RAISED

APARTMENT FOR VGN PRAGNYA ,CHENNAI.

  • CONSTRUCTION

OF RELIANCE HYPER MALL, TIRUNELVELI.

  • PART DESIGN AND CONSTRUCTION OF KAUSHAMBI

METRO STATION AT DELHI FOR DMRC

Completed Projects

Golfview Apartments, Lucknow Hiranandani Apartments, Bangalore

slide-44
SLIDE 44

IND NDUST STRI RIAL AL INF NFRAST STRUCT UCTURE RE

slide-45
SLIDE 45

INDUSTRIAL BUILDINGS

  • CIVIL WORKS FOR BOP FOR 1X800MW SDSTPS,

STAGE - II UNIT - NO. 3, KRISHNAPATNAM PROJECT IN NELLORE DISTRICT, ANAHDRA PRADESH FOR TATA.

  • MAIN CIVIL WORKS (ISBL & OSBL) – HURL (6378-

HGCI & 6382 – HGCO) PROJECT AT HURL, GORAKHPUR, UTTAR PRADESH FOR TOYO.

  • CIVIL

WORKS FOR CONSTRUCTION OF POKARNA ENGINEERED STONE LIMITED – UNIT II PLANT AT MEKAGUDA.

Major Ongoing Projects

slide-46
SLIDE 46

INDUSTRIAL BUILDINGS

  • CONSTRUCTION OF ‘MAINTENANCE, REPAIR AND OVERHAUL

FACILITY BUILDING’ AT RAJIV GANDHI INTERNATIONAL AIRPORT AT SHAMSHABAD, HYDERABAD INCLUDING CIVIL WORKS, FINISHES, APRON AND DRAIN WORKS FOR GMR AEROSPACE ENGINEERING.

  • CIVIL, FABRICATION

AND ERECTION (2500 T) OF STEEL STRUCTURES AND EQUIPMENT) WORK OF GAS SUSPENSION CALCINER AT NALCO – DAMANJODI AND ANGUL, ORISSA FOR FFE MINERALS INDIA PVT. LTD.

  • CIVIL WORKS FOR WET GRAVITY PLANT AND DRY GARNET

PLANT AT SRIKAKULAM, ANDHRA PRADESH FOR TRANSWORLD GARNET INDIA (P) LTD.

  • NEW STAGE PREPARATION BUILDING AT PSLV COMPLEX -

SHAR FOR DEPT OF SPACE, AT SRIHARIKOTA .

  • WORKSHOP

BUILDINGS 5 & 6 INVOLVING 6000 T OF STRUCTURAL STEEL FABRICATION & ERECTION AND TECHNICAL BUILDINGS 9, 10, 11 & 12 WITH ALLIED CIVIL WORKS FOR DIRECTOR GENERAL OF NAVAL PROJECTS.

  • DM & PT PLANT PACKAGE FOR SOLAPUR SUPER THERMAL

POWER PROJECT (2 X 660 MW) AT PHATATEWADI, NTPC SOLAPUR

Wet Gravity and Dry Garnet Plant, Srikakulam Pharmazell, Visakhapatnam

Major Completed Projects

slide-47
SLIDE 47

INDUSTRIAL BUILDINGS

  • CIVIL AND STRUCTURAL WORKS

FOR ALUMINIUM ALLOY WHEEL PLANT AT VISAKHAPATNAM FOR SYNERGIES- DOORAYAUTOMOTIVE LTD.

  • CONSTRUCTION OF INDUSTRIAL BUILDINGS, CONTROL ROOMS,

CONVEYORS, HEAD WORKS , INTAKE WELL, FILTRATION GALLERY, JACKWELL, QUARTERS FOR SPONGE IRON PLANT AT CHANDRAPUR, MAHARASHTRA FOR LLOYDS METALS & ENGINEERS LTD.

  • CIVIL WORK FOR THE MAIN PLANT INCLUDING MACHINE

FOUNDATIONS, COMPOUND WALL , DG ROOM, SCCESSORY BUILDINGS AROUND THE MAIN PLANT INCLUDING WATER RE- CIRCULATING PLANT FOR POKARNA ENGINEERED STONE LIMITED, AT APSEZ , VISAKHAPATNAM.

  • CIVIL WORKS INCLUDING SITE GRADING, CONSTRUCTION OF

BUILDINGS, RCC WATER TANKS, RCC EFFLUENT STORAGE TANKS, ROADS AND DRAINSFOR PHARMAZELL (VIZAG) PVT LTD. AT VISAKHAPATNAM.

  • CIVIL

WORKS FOR LAMINATED GLASS WINDSCREEN MANUFACTURING FACILITY FOR PILKINGTON AUTOMOTIVE INDIA PVT. LTD. AT VISAKHAPATNAM.

  • CIVIL WORKS FOR BP-18 AIR SEPARATION PLANT FOR PRAXAIR

INDIA PVT LTD. AT BELLARY.

Steam Turbine Hall, Godavari Gas Power Project, Kakinada 3x33 MW STG Project, Bina

Major Completed Projects

slide-48
SLIDE 48

INDUSTRIAL STRUCTURES

Hanger for MASGMR at Hyderabad Airport

slide-49
SLIDE 49

INDUSTRIAL STRUCTURES

Granite Stone Plant for Pokarna Ltd

Glass Factory for Pilkington Automotive Pvt Ltd.

slide-50
SLIDE 50

INDUSTRIAL STRUCTURES

Reliance Hyper Market-Andhra Pradesh

slide-51
SLIDE 51

INDUSTRIALSTRUCTURES

INTERIM INTERNATIONAL DEPARTURE TERMINAL BUILDING, RGIA- HYDERABAD

slide-52
SLIDE 52

INDUSTRIALSTRUCTURES

INTERIM INTERNATIONAL DEPARTURE TERMINAL BUILDING, RGIA- HYDERABAD

slide-53
SLIDE 53
slide-54
SLIDE 54

POWER PLANTS

Major Ongoing Projects Major Completed Projects

  • CIVIL WORKS FOR BOP FOR 1X800 MW SDSTPS, STAGE –

II UNIT NO 3 KRISHNAPATNAM PROJECT IN NELLORE DISTRICT, AP.

  • 1X30 MW CAPTIVE POWER PLANT FOR ARYAN COAL BENEFICATIONS
  • PVT. LTD. CONSISTING OF TURBINE HOUSE, BOILER HOUSE, ESP

FOUNDATION, CONTROL ROOM, SILOS, MATERIAL HANDLING SYSTEM, CRUSHER HOUSE, WATER TREATMENT PLANT, COOLING TOWER ETC.

  • 208 MW COMBINED CYCLE POWER PLANT AT KAKINADA FOR

ROLLS ROYCE INDUSTRIAL POWER (INDIA) LTD., INVOLVING 5- CELL RCC COOLING TOWER, WATER TREATMENT FACILITY, STRUCTURAL STEEL FABRICATION & ERECTION FOR THE GAS TURBINE CANOPY & STEAM TURBINE HALL, RESERVOIR LINER PROTECTION ETC.

  • CIVIL & STRUCTURAL WORKS INCLUDING PILE FOUNDATIONS, PILE

CAPS, DG FOUNDATION, DG BUILDING, TRANSFORMER HOUSE, RAW WATER TANK, WATER TREATMENT PLANT, COOLING TOWER FOUNDATIONS, CHIMNEY FOUNDATIONS ETC FOR 3 X 10 MW CAPTIVE POWER PLANT AT BHADRAK, RANDIA (DIST) FOR FERRO ALLOY CORPORATION LTD, BALASORE.

  • CIVIL WORKS FOR POWER BLOCK PACKAGE FOR 2X300MW-TRN

ENERGY THERMAL POWER PROJECT AT RAIGARH CHHATTISGARH.

208 MW Godavari Gas Power Project, Kakinada Vijay Nirman's quality and adherence to time schedules are notable and they are very responsive to the client's needs. By adopting the approach that simple solutions to engineering complexities are possible, they displayed a capacity to innovative. They never showed any tendency to dispute or involve in litigation.” V.P.Hodge, Project Director, Rolls – Royce Industrial Power Limited, England

slide-55
SLIDE 55

ELECRICAL WORKS

  • 11KV

SUBSTATION, OVERHEAD LINES, SWITCHYARD, TRANSFORMERS, DG SETS, HT / LT PANELS INSTRUMENTATION & PLC SYSTEMS, INTERNAL ELECTRIFICATION WORKS OF WET GRAVITY PLANT AND DRY GARNET PLANT FOR TRANSWORLD GARNET INDIA (P)

  • LTD. AT SRIKAKULAM.
  • 33 KV SUBSTATION, SWITCHGEAR, POWER WIRING AND

DISTRIBUTION NETWORK AT ALUMINIUM ALLOY WHEEL PLANT AT VISAKHAPATNAM FOR SYNERGIES-DOORAY AUTOMOTIVE LIMITED.

  • CONSTRUCTION

POWER SUPPLY SYSTEM WITH TRANSFORMER, SUBSTATION AT VISAKHAPATNAM STEEL PLANT EXPANSION TO 6.30 MILLION TONNE FOR RASHTRIYA ISPAT NIGAM LIMITED.

  • PROVISION VIB AND POWER HOUSE AT OUTER WHEELER

ISLAND FOR CCE (R&D), NEW DELHI .

Major Completed Projects

slide-56
SLIDE 56

MATERIAL HANDLING SYSTEMS

  • OPERATION AND MAINTENANCE OF BULK MATERIAL HANDLING

SYSTEM FOR VIZAG SEAPORTS AT VISAKHAPATNAM.

  • CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS RELATED TO

SOLID MATERIALS HANDLING SYSTEM INCLUDING BUNKERS, CONVEYER GALLERIES, TRANSFER TOWERS, CRUSHER HOUSES, STACKER RECLAIMER COMPLEX, HOPPERS, WAGON TIPPLER STRUCTURES ETC. FOR 3X33 MW STG PROJECT, BHARAT OMAN REFINARY LTD., BINA FOR BHEL .

  • CONSTRUCTION

OF WAGON TIPPLER, FABRICATION AND ERECTION OF CONVEYOR STRUCTURES AND ASSOCIATED ELECTRO-MECHANICAL WORKS RELATED TO BULK MATERIAL HANDLING SYSTEM INCLUDING DUST SUPPRESSION SYSTEM AT GANGAVARAM PORT, VISAKHAPATNAM FOR GANGAVARAM PORT LTD.

  • EXPANSION OF ALUMINA HANDLING FACILITIES AT NALCO’S

PORT FACILITY AT VISAKHAPATNAM.

  • CONSTRUCTION OF AMMONIA STORAGE TANK & HANDLING

FACILITIES AT KAKINADA FOR GODAVARI FERTILISERS & CHEMICALS LTD.

  • CIVIL & STRUCTURAL WORKS FOR AMMONIA TANK FOUNDATION

& RELATED FACILITIES FOR COROMANDEL FERTILISERS LTD., VISAKHAPATNAM

Gangavarm port, Visakhapatnam

Major Completed Projects

slide-57
SLIDE 57

PILING WORKS

PILING WORKS :

  • PILING AND RCC WORKS IN BACK UP AREA FOR

EQ9 BERTH AT VSPL. IN VISAKHAPATNAM.

  • GROUND IMPROVEMENT AND EARTH WORKS

IN CONNECTIOIN WITH CONTAINER FREIGHT STATION PROJECT SITUATED AT EXIM PARK AREA – VISAKHAPATNAM

  • CIVIL AND FOUNDATION WORKS RELATED TO

BULK MATERIAL HANDLING SYSTEMS

  • PACKAGE

4F FOR GANGAVARAM PORT LIMITED VISKHAPATNAM

DIAPHRAGM WALLS :

  • CONSTRUCTION OF DIAPHRAGM WALL AND

GUIDE WALL FOR LAUNCHING SHAFT AND STATION BUILDING OF DMRC AT JANPATH, DELHI FOR PRATIBHA-CRFG JV.

  • CONSTRUCTION OF DIAPHRAGM WALL FOR

MFAR COMMERCIAL DEVELOPMENT AT BANGALORE.

Major Completed Projects

slide-58
SLIDE 58
  • TRACK WORK BETWEEN TIRUMALAI – TARAMANI

STATIONS FOR MRTS PHASE II, CHENNAI.

  • TRACK

OVER THE VIADUCT FOR VARIOUS STRETCHES OF LINE-3 (ON DWARAKA SIDE) OF DMRC, DELHI.

  • TRACK

OVER THE VIADUCT FOR VARIOUS STRETCHES IN EXTENSION OF LINE 3 OF DMRC (ON DWARKA SIDE) AT DELHI FOR CONTRACT 3T-06 OF DMRC

  • PHASE – II, PART - 2 CORRIDOR OF DMRC (CENTRAL

SECRETARIAT - GREEN PARK - QUTUB MINAR - SUSHANT LOK) OF DMRC, DELHI.

  • UDHAMPUR-KATRA

SECTION OF UDHAMPUR- SRINAGAR-BARAMULLA SECTION FOR IRCON INTERNATIONAL LTD.

Major Projects SPECIALIZED WORKS – BALLAST-LESS TRACK

slide-59
SLIDE 59
  • SUPPLY,

INSTALLATION, TESTING AND COMMISSIONING OF TRACK WORK INCLUDING INSTALLATION OF THIRD RAIL SYSTEM IN UNDERGROUND AND REACH-3B SECTIONS OF BANGALORE METRO RAIL PROJECT - PHASE-1.

  • TRACK OVER THE VIADUCT AND UNDERGROUND FOR

PART-2 CORRIDOR OF SECTIONS OF JANAKPURI WEST – KALINDI KUNJ (LINE 8) AND CENTRAL SECRETARIAT – KASHMERE GATE (LINE 6 EXTN) OF DMRC PHASE – III.

  • CONSTRUCTION OF BALLASTED AND BALLASTLESS

TRACK WORK FOR MUMBAI METRO, MUMBAI

  • TRACK

IN THE UNDERGROUND IN DELHI FROM JANPATH TO MANDI HOUSE INCLUDING 2 STATIONS OF JANPATH & MANDI HOUSE FOR DMRC BT-01 CONTRACT IN DELHI

  • TRACK OVER THE VIADUCT IN CONNECTION WITH

THE EXTENSION OF METRO RAILWAY, KOLKATA FROM TOLLYGUNGE TO GARIA

Major Projects

SPECIALIZED WORKS – BALLAST-LESS TRACK

slide-60
SLIDE 60

WATER AND SEWAGE TREATMENT SYSTEMS

MAJOR COMPLETED PROJECTS:

  • PRODUCTION BUILDING, UTILITY BLDG, PUMP HOUSE, SUBSTATION BLDG,

SUMPS, TREATMENT PLANTS, STORAGE SHEDS, WARE HOUSE, WORK SHOP, ADMINISTRATION BLDG, COMPOUND WALLS, DRAINS.

  • CIVIL AND STRUCTURAL WORKS FOR 100 MLD DE-SALINATION PLANT AT

NEMMELI IN TAMILNADU FOR CMWSSB FOR VA TECH WABAG LTD.

  • REGIONAL RURAL WATER SUPPLY SCHEME OF MAHARASHTRA JEEVAN

PRADHIKARAN AT GONDPIPRI .

  • REGIONAL RURAL WATER SUPPLY SCHEME OF MAHARASHTRA JEEVAN

PRADHIKARAN AT WARDHA, MUMBAI.

  • CONSTRUCTION

OF AQUEDUCT ON BEMBLA RIVER MAIN CANAL IN YEOTMAL DISTRICT FOR VIDARBHA IRRIGATION DEVELOPMENT CORPORATION.

  • CIVIL WORK FOR GRANITE STONE PLANT AT APSEZ LTD
slide-61
SLIDE 61

OUR CLIENTS

slide-62
SLIDE 62

CONTINUOUS CLIENT RELATIONSHIPS

FY 2009 Construction

  • f Tapi

Bridge

FY 2010 1) Structure workNH- 71 2) Roads and building MP

Fy 2011 Structure work MP

Fy 2012 1) Structure work NH-8 Rajasthan. 2) Structure work NH-13 (MH) FY 2015

Four laning of Rohtak to Hissar section FY 2012 Main substation FIPL-II FY 2012 Machine building FY 2013 Boundary Wall fencing FY 2013

Civil work MEPF –FIPL-Admin / Canteen

FY 2016

Contract CC-47 Elevated Viaduct from Mundka to Tikri

Fy 2016 Twin tunnel works at Bhanpura Canal Project

Fy 2016 Twin tunnel works at Bhanpura Canal Project Fy 2016 Development 6 lane works at Harayana

Fy 2016

Development 6 lane works at Ghaziabad

FY 2012 Phase III, Phase IV Cottage FY 2012 Phase II Cottage FY 2012 Cypress Apartment FY 2013-18 Calgary Apartment, Amalfi, Tiana, Anchorage Towers 2018 Jhansi – Khajurao Structures 2018 Purvachal Expressway Structures 2019 Samruddhi Expressway Structures

slide-63
SLIDE 63

FY 2009 Awarded Structures on Noida-Agra ` 1,638m project FY 2010 Awarded Flyover @ Noida for ` 601m Fy 2011 Toll Plaza Agra Fy 2012 Toll Plaza Noida

CONTINUOUS CLIENT RELATIONSHIPS

FY 2007 Awarded Tindivanam

FY 2010

Chennai

ORR

FY 2011 Hangar Works HYD-Airport FY 2012 Civil works at Airport Hyderabad FY 2016 DFCC Bridge works at Kanpur

FY 2016 DFCC Bridge works at Mirzapur FY 2017 Earthworks of Apron Expansion at HYD Airport FY 2017 Construction of Taxiway PAPA-1 at Delhi Airport

FY 2017 Four lane approach ramp

FY 2017 Terminal Building at Hyd Airport

FY 2008 Awarded Karur Bypass ` 1,851m FY 2010 Awarded Salem - Ullunderpet ` 1,966m FY 2012 Hyper Mall Guntur FY 2012 Tirunelveli Hyper Mall

slide-64
SLIDE 64

SITE PHOTOGRAPHS

slide-65
SLIDE 65

WE BUILD PROJECTS THAT MAKE INDIA PROUD Interchange at 0.00km, Taj Expressway.

slide-66
SLIDE 66

Lakshmanatheertha Bridge near Mysore. Superstructure Work at MRTS, Chennai

slide-67
SLIDE 67

Construction of Tapi Bridge at Dhule for Sadhbav Engineering Ballastless Track Work, Mumbai Metro Rail

slide-68
SLIDE 68

Construction of Diaphragm Wall for Mfar at Manyatha Tech park, Bangalore Desalination Plant for Watech Vabag at Nemmelli, Chennai

slide-69
SLIDE 69

Largest Concrete Truss Span at Kakinada

slide-70
SLIDE 70

LANSUM OXYGEN TOWERS

slide-71
SLIDE 71

Premium Villas “ Cloud 09 ” at Bengaluru Royal Legend Apartments at Bengaluru

slide-72
SLIDE 72

ESI – HOSPITAL - HYDERABAD

slide-73
SLIDE 73

Gangavaram Port - Tippler House – Ore Conveyor Belt Sea Gold - Jetty ESIC –Electrical Panel Room Reliance Hyper Mall

slide-74
SLIDE 74

Registered & Corporate Office – Visakhapatnam

Address: #11-09-16, Dasapalla Hills, Visakhapatnam – 530003, Andhra Pradesh, India Phone: +91 891 2575755 Fax: +91 891 2754046 Email: vncvizag@vijaynirman.com

Contact us

Branch Office – Bangalore

Address: #105, 7th Main, 4th Cross, MLA Layout, RMV 2nd Stage, Bengaluru – 560 094 Phone: +91 80 67433355 Fax: +91 80 67433356 Email: vncblr@vijaynirman.com

Branch Office – Hyderabad

Address: 8-3-833/118, Kamalapuri Phase – 1, Srinagar Colony, Hyderabad – 500 073 Phone: +91 40 42015019 Fax: +91 40 23733890 Email: vnchyd@vijaynirman.com

Branch Office – Nagpur

Address: Plot No. 29, Sobha Heights, S.E Railway Co.op. Housing Society, Somalwar High School Road, Near Pratap Nagar Police Chowki, Pratap Nagar, Nagpur, Maharashtra-440022 Phone: +91 712 2236448 Email: vncngp@vijaynirman.com

Branch Office – Delhi

AddressFlat No. 2A, Pocket 7, Rihayasi Apartment, Sector – 12, Near Dwaraka Sector 12 Metro Station, NEW DELHI – 110078 Email: vncdelhi@vijaynirman.com

slide-75
SLIDE 75

THANK YOU