Verification Contract RFP 2nd Kickoff January 12, 2017
Disclaimer: Information in this presentation is not final and is subject to change.
Verification Contract RFP 2 nd Kickoff January 12, 2017 Disclaimer: - - PowerPoint PPT Presentation
Verification Contract RFP 2 nd Kickoff January 12, 2017 Disclaimer: Information in this presentation is not final and is subject to change. Construction Timeline: July 2017 to late 2019 Estimated Project Cost: $50 million Resurface 6
Disclaimer: Information in this presentation is not final and is subject to change.
Construction Timeline: July 2017 to late 2019
Estimated Project Cost: $50 million
Resurface 6 miles of existing pavement on I-35
Remove and replace bridges:
New bridge at TH 97 interchange will be a Diverging Diamond Interchange.
Update crosswalks at Hwy 97 to meet modern accessibility standards
I-35 will be reduced to two lanes in each direction during work. I-35E and I-35W will be reduced to
Access to I-35 at Hwy 8, Broadway Avenue Forest Lake rest stop, Hwy 97/Co Rd 23 will be impacted during construction
Coordination with Rice Creek Watershed District and Comfort Lake – Forest Lake Watershed District will be key to a successful project
Disclaimer: Information in this presentation is not final and is subject to change.
Disclaimer: Information in this presentation is not final and is subject to change.
MnDOT Goal: Increase opportunities to DBE/TGB/Vet firms as Primes
TGB and Vet-owned businesses have been direct-selected by
DBVC will have responsibility of training and mentoring the TGB/Vet
A successful team will have strong mentorship and leadership from
Disclaimer: Information in this presentation is not final and is subject to change.
Disclaimer: Information in this presentation is not final and is subject to change.
Disclaimer: Information in this presentation is not final and is subject to change.
The RFP will include the exact hours that each team will bid. The
Section Role Total Uniform Bid Hours 8 Verification Consultant PM & Design-Build Contract Manager 2,234 9 Deputy Project Manager and Design Manager 2,922 10 Roadway Design Engineer 239 10 Roadway Design Engineer Phase 2 1,062 11 Structures Design Engineer 239 11 Structures Design Engineer Phase 2 1,185 12 Utility Coordinator 179 12 Utility Coordinator Phase 2 31 13 Drainage Engineer 239 13 Drainage Engineer Phase 2 1,123 14 CPM Schedule Reviewer 157 14 CPM Schedule Reviewer Phase 2 62 15 Environmental Compliance Manager 1,208 15 SWPPP Designer 2,330 15 Permitting Specialist 317 15 Permitting Specialist Phase 2 1,070
Disclaimer: Information in this presentation is not final and is subject to change.
Summer 2017 Summer 2018 Summer 2019 Late 2019 Project Start Project End $100,000 TGB Contract is up Prime Phase 2 MnDOT TGB Contract
Disclaimer: Information in this presentation is not final and is subject to change.
Rating factor Rating factor We Weight hting g percentage percentage Project Project ris risk 5% Wor Work plan plan Project Project approach approach Qual Quality manageme y management nt a) 5% b) 4% c) 6% Veri Verification Consu
tant Project Manager Manager & & Desig Design Buil Build Contrac Contract Manager Manager 12% Deput Deputy Project Project Manager & Design Manager & Design Manager Manager 12% Roadway Design Engineer Roadway Design Engineer 8% Structures De ctures Design sign En Engi gineer eer 8% Utili Utility Coordi ty Coordinator nator 4% Drainage Engineer Drainage Engineer 6% CPM Sche CPM Schedule Revie Reviewer 5% Enviro Environmental Comp nmental Compliance Manager / ance Manager / SW SWPPP Desig PPP Designer / er / Permit Permitting ng Sp Speci eciali list st 10% Cost detai Cost detail 15%
Disclaimer: Information in this presentation is not final and is subject to change.
Disclaimer: Information in this presentation is not final and is subject to change.
Disclaimer: Information in this presentation is not final and is subject to change.