SLIDE 14 5/19/2015 14
L aunc h Pr
Be for e August 1 – Alpha site finalize d, ar c hite c tur e finishe d August 1 – Be ta site r
- llout to se le c t gr
- ups – te sting/ fe e dbac k
Se pte mbe r 1 – Be ta site r e le ase d to all inte r nal UVU c ommunity Oc tobe r 15 – “Go L ive ” (authe ntic ate d syste ms switc he d) UVL
ink will still be available
Oc t 15, 2015 – June 30, 2016 F
e atur e s slowly r e move d fr
ink, pointing the m to myUVU
June 30, 2016 Old UVL
ink and UVL ink Mail syste m de c ommissione d
L aunc h and Ne xt Phase s
T
ate d to make all c hange s r ight now
F
ir st, r e plac e what we c ur r e ntly have
Se c ond, impr
vic e s
T
hir d, add additional func tionality as ne e de d
“L
iving” syste m
F
utur e e nhanc e me nts Inte gr
ate ne w Banne r XE por tle ts for ne w func tionality
Mobile app fe atur
e s imple me nte d within myUVU
Addition of many thir
d par ty syste ms ac r