SLIDE 1
US 60 Widening Project
Public Meeting May 23, 2012
SLIDE 2 Discussion Items
- Purpose of Tonight’s Meeting
- US 60 Widening Project Team
- Project Purpose and Need
- Alternatives
- Project Schedule
SLIDE 3 Why we are here
- To share information about the US 60 Widening
Project
- To discuss improvement alternatives that are
under consideration
- Most importantly, to obtain your comments and
concerns through the comment forms
We need your input!
SLIDE 4 The US 60 Project Team
- KYTC District 9
- Stantec Consulting Services
– Design Consultant
SLIDE 5
- From I-64 to KY 180
- Just over 3.8 miles in length
- In Phase I / Preliminary Design phase
- Will explore needed improvements to the KY 180 intersection
Project Information
SLIDE 6
Project Purpose
The purpose of the US 60 widening project is to relieve congestion, improve safety, and provide system connectivity for motorists accessing downtown Ashland from the I-64 corridor.
SLIDE 7 Traffic Forecasts
– 10,500 to 13,500 vehicles per day (VPD)
– 3 Lane: 14,400 to 15,600 VPD – 5 Lane: 17,400 to 18,800 VPD
- The 5 Lane option diverts traffic from KY 180
SLIDE 8 Crash History
2009-2011
crashes make up 50%
- f all collisions
- Below average crash
rate overall
SLIDE 9 We need your input!
- The Project Team needs your help in determining
what the future roadway should look like
- Would you prefer to widen US 60 to 3 lanes or 5
lanes?
- Which typical section do you prefer?
- How should we accommodate bicycles and
pedestrians?
- Please fill out your questionnaire and leave it at
the sign-in table.
SLIDE 10 Proposed Typical Sections
Three-lane options
Three lane Urban Typical with curb and gutter Three lane Rural Typical with shoulders
Five-lane options
Five lane Urban Typical with curb and gutter Five lane Rural Typical with shoulders
SLIDE 11
Bicycle and Pedestrian Accommodations
Single sidewalk on the north / west side Bicycle Lanes on both sides of the roadway
SLIDE 12
Alternatives Considered
SLIDE 13
Potential Alignment Changes
SLIDE 14
Segment 3
SLIDE 15
KY 180 Intersection
SLIDE 16
KY 180 Intersection Existing
SLIDE 17
KY 180 Intersection Improved
SLIDE 18
Project Schedule
Phase I (Preliminary Design) Complete Late Summer 2012 Phase II (Final Design) Complete 2013 Right-of-Way 2013-2014 Utilities 2014 Construction 2015-2016
SLIDE 19
Contact Information
Rachel Catchings, P.E. Darrin Eldridge, P.E.
KY Transportation Cabinet District 9 822 Elizaville Ave. Flemingsburg, KY 41041 Phone: (606) 845-2551 Jason Bricker, P.E. Stantec Project Manager 400 East Vine St., Suite 300 Lexington, KY 40507 Phone: (859) 233-2100