PASEO DEL NORTE WIDENING RAINBOW BLVD TO CALLE NORTEA CPN 7050.06 DEPARTMENT OF MUNICIPAL DEVELOPMENT ENGINEERING DIVISION DECEMBER 5, 2019 PRE-SUBMITTAL MEETING PROJECT LOCATION DECEMBER 5, 2019 PASEO DEL NORTE WIDENING RAINBOW BLVD


slide-1
SLIDE 1

PASEO DEL NORTE WIDENING RAINBOW BLVD TO CALLE NORTEÑA

CPN 7050.06

DEPARTMENT OF MUNICIPAL DEVELOPMENT ENGINEERING DIVISION DECEMBER 5, 2019 PRE-SUBMITTAL MEETING

slide-2
SLIDE 2

PROJECT LOCATION

DECEMBER 5, 2019 PASEO DEL NORTE WIDENING – RAINBOW BLVD TO CALLE NORTEÑA

slide-3
SLIDE 3

PROJECT SCHEDULE & FUNDING

  • Design Completion by the end of 2021
  • Construction Completion
  • TBD – subject to initial and continued funding, which may cause phasing of construction
  • Funding Source
  • State Capital Outlay (Design)
  • Federal Funding is not being requested at this time; but should it become available, the Respondent should be prepared to follow

the Federal NEPA process during design, which may include Environmental Documentation related to Cultural or Biological Resources

  • Anticipated Construction Cost
  • $19,000,000 (Not including right-of-way acquisition)

DECEMBER 5, 2019 PASEO DEL NORTE WIDENING – RAINBOW BLVD TO CALLE NORTEÑA

slide-4
SLIDE 4

EXISTING CONDITIONS

  • Incomplete Pavement Sections
  • Typical section may be temporary within

portions of the project corridor

  • Traffic Signals
  • 4 existing signalized intersections with no

coordination

  • Pedestrian and Bicycle Facilities missing or

insufficient

  • Storm Drainage Infrastructure is Deficient
  • No Water or Sanitary Sewer Facilities
  • Shallow Basalt bedrock exists throughout

the corridor

  • 70’ of City-owned ROW east of Universe

and 156’ to the west of Universe

DECEMBER 5, 2019 PASEO DEL NORTE WIDENING – RAINBOW BLVD TO CALLE NORTEÑA

slide-5
SLIDE 5

PROJECT SCOPE

DESIGN AND CONSTRUCTION PHASE SERVICES

  • Design Analysis Report
  • Permanent Roadway Section
  • Pedestrian & Bicycle Facilities
  • Traffic Engineering Services
  • Storm Drainage Analysis
  • SPECIAL CONSIDERATIONS
  • Coordination with National Park Service and

AMAFCA

  • Boundary and Topographic Survey
  • Right of Way Acquisition and Support Services
  • Corridor Lighting Improvements
  • SUE and Identification of Utility Relocations
  • Traffic Flow Modeling
  • Public Involvement
  • Water Utility Authority Coordination
  • Bid Phase Services

DECEMBER 5, 2019 PASEO DEL NORTE WIDENING – RAINBOW BLVD TO CALLE NORTEÑA

**ALL NEW DESIGN TO BE COMPLIANT WITH COMPLETE STREETS ORDINANCE O-2019-022**

slide-6
SLIDE 6

PROJECT SCOPE

GUIDANCE DOCUMENTS:

  • MRCOG Futures 2040 Long Range Plan and MRCOG Roadway Access Control Policy (RAC)
  • Albuquerque Integrated Development Ordinance (IDO) and Related Reference Documents
  • City of Albuquerque DPM, ITE, AASHTO and NACTO
  • AMAFCA Upper Peidras Marcadas Watershed Drainage and Water Quality Management Plan

DECEMBER 5, 2019 PASEO DEL NORTE WIDENING – RAINBOW BLVD TO CALLE NORTEÑA

Paseo del Norte Proposed Typical Section

slide-7
SLIDE 7

PROPOSAL INFORMATION

  • Due Tuesday January 21, 2020 before 3:00PM

Selection Advisory Committee Office: Capital Implementation Program (CIP) Division Office One Civic Plaza 7th Floor, Room 7057 Albuquerque/Bernalillo County Government Center Albuquerque, New Mexico 87102

  • No proposals will be accepted after the time specified.

DECEMBER 5, 2019 PASEO DEL NORTE WIDENING – RAINBOW BLVD TO CALLE NORTEÑA

slide-8
SLIDE 8

CONTACT INFORMATION

  • Project Manager:
  • Jill Cuppernell
  • Email: jcuppernell@cabq.gov
  • Office: (505) 768-3502