US 101/Broadway Interchange Project US 101/Broadway Interchange Project
General Information
October 2014
General Information
October 2014
US 101/Broadway US 101/Broadway Interchange Project Interchange - - PowerPoint PPT Presentation
US 101/Broadway US 101/Broadway Interchange Project Interchange Project General Information General Information October 2014 October 2014 Construction Capital Programming $32M from San Mateo County Transportation Authority (SMCTA)
October 2014
October 2014
Airport Blvd.
US101/Broadw ay Interchange Reconstruction Project, Burlingame, CA Bayside Park Bay Trail Residential Area Industrial Area Burlingame Entry & Commercial
PGE Towers Building the New US101/Broadway Interchange Stage Construction Stage 1 – Build New Overcrossing, soil strengthening, pile driving Stage 2 – Build southbound US-101 offramp & Broadway/Rollins Intersection; Temporary Re-Configured intersection Stage 3 – Open new Overcrossing, Demolish old Overcrossing Stage 4 – Build Bayshore Blvd – install utilities Stage 5 – Build Crown Plaza Driveway, place Asphalt Overlay and Landscape
STAGE 1 New Overcrossing STAGE 2 Southbound US-101 Offramp temporary detour to Broadway/Rollins intersection
Demolish Old Overcrossing
information and develop strategies