US 101/Broadway US 101/Broadway Interchange Project Interchange Project General Information General Information October 2014 October 2014 Construction Capital Programming $32M from San Mateo County Transportation Authority (SMCTA)


  1. US 101/Broadway US 101/Broadway Interchange Project Interchange Project General Information General Information October 2014 October 2014

  2. Construction Capital Programming • $32M from San Mateo County Transportation Authority (SMCTA) ½ cent sales tax • $11M State Transportation Improvement Program (STIP) as sponsored by C/CAG • $3.6M of Federal Funds from One Bay Area Grant (OBAG) Federal program • $5M from the City of Burlingame Total Programmed Construction Capital $51.6M

  3. Recently Completed Milestones  Bid Opening occurred May 13 th , 2014  Executed Contract with Ghilotti Construction on July 17, 2014  First Working Day of Contract is Sept. 10, 2014  Ground Breaking Ceremony on September 16, 2014 - Held at Bay Trail adjacent to intersection at Bayshore & Airport Blvd. Construction to be completed by mid-2017

  4. Building the New US101/Broadway Interchange Bay Trail Bayside Park Stage Construction PGE Towers Stage 1 – Build New Overcrossing, Industrial Area soil strengthening, pile driving Stage 2 – Build southbound US-101 offramp & Broadway/Rollins Intersection; Temporary Re-Configured intersection Residential Stage 3 – Open new Overcrossing, Demolish old Area Overcrossing US101/Broadw ay Interchange Reconstruction Project, Burlingame, CA Stage 4 – Build Bayshore Blvd – install utilities Stage 5 – Build Crown Plaza Driveway, place Burlingame Asphalt Overlay and Landscape Entry & Commercial

  5. Stage 1 & 2 – Broadway/Rollins Intersection Construction STAGE 1 New Overcrossing STAGE 2 Southbound US-101 Offramp temporary detour to Broadway/Rollins intersection

  6. Stage 3 - Open New Overcrossing Staging Concepts Demolish Old Overcrossing

  7. Stage 4 – Construct Bayshore Blvd

  8. Stage 5 – Construct Driveway, Place Asphalt and Landscape

  9. Public Outreach Strategies Good Public Information equates to Awareness, Safety and Decreased Traffic Demand  Weekly construction meetings with stakeholders to provide information and develop strategies  Construction Updates and Advanced Notices to Media and News Release  Website and Email Notification through eNews  Changeable Message Signs (CMS) at key locations  YouTube, Twitter and Facebook  Mailers  Door to Door Contact with Businesses

  10. Landscape Plan

  11. Overcrossing Aesthetics

  12. Overcrossing Aesthetics

  13. Retaining Wall Aesthetics

  14. Bayshore/Airport Intersection

  15. Broadway/Rollins Intersection

  16. Gateway Structures

  17. Gateway Structures

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.