TRUJILLO LA LIBERTAD PER Johnny E. Nina Ari Arato Per - - PowerPoint PPT Presentation
TRUJILLO LA LIBERTAD PER Johnny E. Nina Ari Arato Per - - PowerPoint PPT Presentation
TRUJILLO LA LIBERTAD PER Johnny E. Nina Ari Arato Per jnina@aratoperu.com.pe El Fundo Montegrande estate 66 km FROM Trujillo, Project Started in August 2013. and finished planting in August 2015 1ra Phase 2nd Phase 3ra FUNDO
El Fundo Montegrande estate 66 km FROM Trujillo, Project Started in August 2013. and finished planting in August 2015
2nd Phase 1ra Phase 3ra
FUNDO MONTEGRANDE - ARATO
MÓDULO ÁREA Densidad (Plantas/ha) PATRON Inicio Fin Inicio Fin
Años de Cultivo Años de Injerto
% Polinizante
Zutano/Fuerte
Tipo Poda % Abejas Riego 1 123.49 463 ZUTANO 11/10/2012 02/08/2013 13/02/2013 07/02/2014
2.1 1.6
4% MANUAL 3 colm/ha Goteo 2 63.22 463 ZUTANO 10/10/2012 01/12/2012 25/03/2012 27/04/2013
2.8 2.4
4% MANUAL 3 colm/ha Goteo 3 78.26 463 LULA 22/03/2012 19/04/2012 09/03/2012 27/06/2012
3.5 3.3
4% MANUAL 3 colm/ha Goteo 4 54.20 463 LULA 29/02/2012 22/03/2012 09/04/2012 23/05/2012
3.5 3.4
4% MANUAL 3 colm/ha Goteo 5 65.62 463 ZUTANO 09/01/2012 29/02/2012 23/02/2012 04/04/2012
3.6 3.5
4% MANUAL 3 colm/ha Goteo 6 49.51 463 ZUTANO 14/02/2012 28/02/2012 20/03/2012 04/04/2012
3.6 3.5
4% MANUAL 3 colm/ha Goteo 7 50.35 463 ZUTANO 23/07/2012 11/09/2012 27/05/2012 16/01/2013
3.0 2.7
5% MANUAL 3 colm/ha Goteo 8 51.97 463 ZUTANO 14/08/2012 05/09/2012 02/01/2013 22/02/2013
3.1 2.6
5% MANUAL 3 colm/ha Goteo 8A 68.85 408 LULA 06/05/2013 07/08/2013 01/11/2013 15/03/2014
2.1 1.5
5% MANUAL 3 colm/ha Goteo TOTAL 605.47 40917 41493 40962 41713
SIEMBRA INJERTO
Roads built with near by stones.
Reception and composting
wet sprinklers Turn compost
topographic survey
Bull dozer and tractor level the sand
Marking lots and streets
Subsoiling
Electrification
Installation of irrigation infrastructure
Installation of irrigation infrastructure
Installation of irrigation infrastructure
Installation of irrigation infrastructure
Installation of irrigation infrastructure
16
Pipeline installation
17
stretching hoses and soaker
- pening furrows
Compost application
mixing compost
forming bed
build nursery
fill bags
fill bags
seed preparation
/ seed disinfection
pregermination
planting pepas
plant growth
plant growth
classification of plants
Achieve better plant : 90 - 120 days
windbreaks
planting with fertilizers DAP(N=18%, P205=46%) MagSulphate(22%=K20,20%Mg0 y 20%=S)
plantation
36
curtain of vegetation
- ther individual curtain
- ther individual curtain
FUNDO MONTEGRANDE
- ther individual curtain