Toward More Permitted Development Image of Caravan- The Tiny House - - PowerPoint PPT Presentation

toward more permitted development image of caravan the
SMART_READER_LITE
LIVE PREVIEW

Toward More Permitted Development Image of Caravan- The Tiny House - - PowerPoint PPT Presentation

11) A Pathway for Planners and Advocates Toward More Permitted Development Image of Caravan- The Tiny House Hotel: tinyhousehotel.com Household sizes Home sizes Household sizes Home sizes 11) A Pathway for Planners and Advocates Toward More


slide-1
SLIDE 1

11) A Pathway for Planners and Advocates Toward More Permitted Development

slide-2
SLIDE 2
slide-3
SLIDE 3

Image of Caravan- The Tiny House Hotel: tinyhousehotel.com

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6

Household sizes Home sizes

slide-7
SLIDE 7

Household sizes Home sizes

slide-8
SLIDE 8

11) A Pathway for Planners and Advocates Toward More Permitted Development

slide-9
SLIDE 9

11) A Pathway for Planners and Advocates Toward More Permitted Development

slide-10
SLIDE 10

11) A Pathway for Planners and Advocates Toward More Permitted Development

slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15

Cons of permitting

  • Use restrictions
  • Additional parking requirements
  • Must go through lengthy, bureaucratic

and expensive process

  • More expensive to comply with code

than not to

  • Tax increases
slide-16
SLIDE 16

Pros of permitting

  • Appraisal value (…and loans)
  • Legally rent it--less stress
  • Insurance
  • Quality assurance
slide-17
SLIDE 17

Good news

  • ADU neighborhood impacts already exist
  • Permitted ADUs would provide safer ADUs
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

40 ft 5 ft 5 ft Height

  • Midpoint of the primary gable must

be <20ft high Exterior finish materials can match the primary house or…..

  • Roof pitch= 6/12 pitch or greater
  • Trim= 3 ½” or greater
  • Siding reveal= 6” or less
  • Eaves= 1ft eaves on all side
  • Windows must be at least at tall as they are

wide on street facades ADU HOUSE

STREET

SIDEWALK

20 ft Maximum Size of ADU

  • 800 sq ft or
  • 75% of the living area of the primary dwelling

PARKING Retain existing space (9’x18’) Building Lot Coverage

  • Footprint of accessory structures

can not exceed 15% of the total lot

Example ADU Development Regulations

slide-21
SLIDE 21
slide-22
SLIDE 22

Example A: For an 800 sq ft ADU, Joe spends $160K. Joes lives in the house and rents out the ADU for $1,500/month for $18K/year $18K/year x 8.9 years = $160K Example B: For an 800 sq ft ADU, Joe spends $160K. Joe lives in the ADU and rents out the house for $2,500/month for $30K/year. $30K/year x 5.3 years = $160K Example C: For an 800 sq ft ADU, Joe spends $160K. Joe rents out the ADU and the house for $4,000/month for $48K/year. $48K/year x 3.3 years = $160K

  • Ex. A) Lives in the house

and rents out the ADU

  • Ex. B) Lives in the ADU

and rents out the house

  • Ex. C) Rents out the ADU and

the house

ADU construction cost $160K $160K $160K Rental income $1,500/month $2,500/month $4,000/month Breakeven period 8.9 years 5.3 years 3.3 years Breakeven w/ADU value 2.2 years 1.3 years 10 months

Breakeven for ADU Development

How long will it take to pay for the cost of the ADU construction via the property’s rental income?

slide-23
SLIDE 23
slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26

Most common ways to fund ADU development:

  • Home Equity Line of Credit Loans- refinancing existing house if there’s

significant equity in the main house. With a “HELOC” you wouldn’t need to refinance the existing property but need enough equity.

  • Cash Out Refinance: refinancing existing house and taking out cash at a

new, fixed, amortized rate.

  • Liquid assets (savings, stocks, 401K loans)
  • Sweat Equity- rule of thumb: half for material, half for labor.
  • Family Loans and other non-secured lines of credit

Jumping the Capital Hurdle: ADU Financing Options

slide-27
SLIDE 27
slide-28
SLIDE 28

1. Funding 2. Brainstorm project scope 3. Talk to a City planner determine feasibility 4. Rough sketch some ideas 5. Talk to neighbors 6. Interview architects or designers 7. Find builders and subs 8. Initiate financing as needed 9. Designer draws up schematic drawings for consideration

  • 10. Integrated Design Process
  • 11. Designer refines

schematics

  • 12. Have designer build a 3D

model of the design

  • 13. Designer finalizes design

with input from owner and builder

  • 14. Develop drawings and

structural engineering calculations for City

  • 15. Submit drawings to the City

for permit

  • 16. Hire land surveyor
  • 17. Obtain permits

Design/Permitting Process

slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33

The Austin Alley Flat Initiative

slide-34
SLIDE 34

ADUs in Los Angeles

slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39

Portland’s ADU History

ADUs permitted per year & Applicable Regulations

0" 100" 200" 300" 400" 500" 600" 700"

1991"1992"1993"1994"1995"1996"1997"1998"1999"2000"2001"2002"2003"2004"2005"2006"2007"2008"2009"2010"2011"2012"2013"2014"2015"2016"2017"2018"

Pre-1996

ALL LLOWED WED BY RIG IGHT HT

NO OFF FF STRE REET PARK ARKING

NO NO MIN INIM IMUM UM LOT SIZE T SIZE

SIZE CAP: PRIMARY HOUSE

“A” OVERLAY ZONE ONLY INTERNAL CONVERSION ONLY

OWNER WNER OCCUP OCCUPANCY ANCY

DESIGN COMPATIBILITY

IMPACT FEES ???

50 Permitted ADUs from 1981 to 1996

slide-40
SLIDE 40

Portland’s ADU History

ADUs permitted per year & Applicable Regulations

0" 100" 200" 300" 400" 500" 600" 700"

1991"1992"1993"1994"1995"1996"1997"1998"1999"2000"2001"2002"2003"2004"2005"2006"2007"2008"2009"2010"2011"2012"2013"2014"2015"2016"2017"2018"

1996 - 2009

ALL LLOWED WED BY RIG IGHT HT

NO OFF FF STRE REET PARK ARKING

NO NO MIN INIM IMUM UM LOT SIZE T SIZE

SIZE CAP: PRIMARY HOUSE

“A” OVERLAY ZONE ONLY INTERNAL CONVERSION ONLY

OWNER WNER OCCUP OCCUPANCY ANCY

DESIGN COMPATIBILITY

IMPACT FEES ??? ALL ALLOWE WED D CI CITY-WI WIDE DE

TYPE TYPES: S: INT INTERN ERNAL AL AD ADDITION DITIONS S DET DETACHE CHED

CA CAN RE RENT BO BOTH UNITS IMPACT FEES 50%

SIZE CAP 33% / 800SF

ADU Blast Off ??

slide-41
SLIDE 41

Portland’s ADU History

ADUs permitted per year & Applicable Regulations

0" 100" 200" 300" 400" 500" 600" 700"

1991"1992"1993"1994"1995"1996"1997"1998"1999"2000"2001"2002"2003"2004"2005"2006"2007"2008"2009"2010"2011"2012"2013"2014"2015"2016"2017"2018"

1996 - 2009

ALL LLOWED WED BY RIG IGHT HT

NO OFF FF STRE REET PARK ARKING

NO NO MIN INIM IMUM UM LOT SIZE T SIZE

SIZE CAP: PRIMARY HOUSE

“A” OVERLAY ZONE ONLY INTERNAL CONVERSION ONLY

OWNER WNER OCCUP OCCUPANCY ANCY

DESIGN COMPATIBILITY

ALL ALLOWE WED D CI CITY-WI WIDE DE

TYPE TYPES: S: INT INTERN ERNAL AL AD ADDITION DITIONS S DET DETACHE CHED

CA CAN RE RENT BO BOTH UNITS IMPACT FEES 50%

SIZE CAP 33% / 800SF

ADU Blast Off ??

slide-42
SLIDE 42

Portland’s ADU History

ADUs permitted per year & Applicable Regulations

0" 100" 200" 300" 400" 500" 600" 700"

1991"1992"1993"1994"1995"1996"1997"1998"1999"2000"2001"2002"2003"2004"2005"2006"2007"2008"2009"2010"2011"2012"2013"2014"2015"2016"2017"2018"

2010 - 2015

ALL LLOWED WED BY RIG IGHT HT

NO OFF FF STRE REET PARK ARKING

NO NO MIN INIM IMUM UM LOT SIZE T SIZE

DESIGN COMPATIBILITY

ALL ALLOWE WED D CI CITY-WI WIDE DE

TYPE TYPES: S: INT INTERN ERNAL AL AD ADDITION DITIONS S DET DETACHE CHED

CA CAN RE RENT BO BOTH UNITS IMPACT FEES 50%

SIZE CAP 33% / 800SF

IMPACT FEES WAIVED

slide-43
SLIDE 43

Portland’s ADU History

ADUs permitted per year & Applicable Regulations

0" 100" 200" 300" 400" 500" 600" 700"

1991"1992"1993"1994"1995"1996"1997"1998"1999"2000"2001"2002"2003"2004"2005"2006"2007"2008"2009"2010"2011"2012"2013"2014"2015"2016"2017"2018"

2010 - 2015

ALL LLOWED WED BY RIG IGHT HT

NO OFF FF STRE REET PARK ARKING

NO NO MIN INIM IMUM UM LOT SIZE T SIZE

DESIGN COMPATIBILITY

ALL ALLOWE WED D CI CITY-WI WIDE DE

TYPE TYPES: S: INT INTERN ERNAL AL AD ADDITION DITIONS S DET DETACHE CHED

CA CAN RE RENT BO BOTH UNITS IMPACT FEES 50%

SIZE CAP 75% / 800SF

IMPACT FEES WAIVED

slide-44
SLIDE 44

Portland’s ADU History

ADUs permitted per year & Applicable Regulations

0" 100" 200" 300" 400" 500" 600" 700"

1991"1992"1993"1994"1995"1996"1997"1998"1999"2000"2001"2002"2003"2004"2005"2006"2007"2008"2009"2010"2011"2012"2013"2014"2015"2016"2017"2018"

2015 - 2016

ALL LLOWED WED BY RIG IGHT HT

NO OFF FF STRE REET PARK ARKING

NO NO MIN INIM IMUM UM LOT SIZE T SIZE

DESIGN COMPATIBILITY

ALL ALLOWE WED D CI CITY-WI WIDE DE

TYPE TYPES: S: INT INTERN ERNAL AL AD ADDITION DITIONS S DET DETACHE CHED

CA CAN RE RENT BO BOTH UNITS IMPACT FEES 50%

SIZE CAP 75% / 800SF

IMPACT FEES WAIVED

DESIG IGN COMPATIB MPATIBILITY ITY

slide-45
SLIDE 45
slide-46
SLIDE 46
slide-47
SLIDE 47
slide-48
SLIDE 48

Preconditions of an ADU Movement

  • Affordable Rental Housing Crisis & High Land Values
  • Predominance of ‘Single Family’ Residential Zoning
  • Political Leadership
slide-49
SLIDE 49
  • Reasonable Zoning and Flexible Development Regulations
  • No poison pill regulations, reasonable design standards
  • Faith in Government
  • Permitting Office Transparency
  • Access to Capital (typically from Increased Home Equity

due to Land Value Inflation)

…More Requisite Features of an ADU Movement

slide-50
SLIDE 50
slide-51
SLIDE 51
slide-52
SLIDE 52