Timeline… to date

July 2008

  • Kempsey By

Bypa pass a s appr pproved f for c const struction by NSW Minister for Planning 2009

  • Stakeholder fo

focus g gro roup c conve vened by KSC to prepare Background Issues Paper on bypass June 2010

  • Fin

inal R Report on Bypass Issues delivered to KSC July 2010

  • KSC intern

rnal c l consult ltative g group c convened to develop a comprehensive Bypass Strategy March 2011

  • KSC Bypass Strategy placed on Public

ic E Exhibit itio ion May 2011

  • KSC Bypass Strategy ado

adopted July 2011

  • Bypas

ass C Coordin dinat ator a appoin inted d and Strategy Implementation Program prepared

slide-4
SLIDE 4

Bypass Strategy

Entry G y Gateways ys and nd S Sign gnage Political al Enga ngage gement nt Asse ssets Fu Future Kempsey Inno nnovation Strate tegy Marke keting Strate tegy Plac ace B Based Promo motions s Ur Urban ban D Design -

Masterplann nning ng

Commu mmunity Eve vents Infrastruct cture Plans Consu sultation Pro rogram Develo lopment Cont ntrol Pl Plans Economic ic Strate tegy

slide-5
SLIDE 5
slide-6
SLIDE 6

THE ROLE OF THE BYPASS COORDINATOR

Successfully coordinate Coun uncil’s s strategic response nse to the implications associated with the Pacific Highway Bypass Assist in developing positive r relatio ionship ips a and partnerships with the Kempsey community through sound communication and consultation on the implementation of the Bypass Strategy Provide a responsive and achievable urban des design mo model for Kempsey town centre and the villages of South Kempsey and Frederickton

slide-7
SLIDE 7

KEY FACTORS

  • 1. Public Consul

ultat ation

  • n and Participation
  • 2. Development of the Co

Corri rridor Ma Master P r Plan

  • 3. Preparation of de

detailed d pr precinct ct de designs

slide-8
SLIDE 8

Public Consul ulta tation n and d Feed eedback

New ewslet etters Fact S t Sheets ts Worksho hops Bypass Infor

  • rmat

ation Gro roup Market et S Stalls ls Intervi views ws Media a Rele leas ases Questionnai aire and S Surveys

slide-9
SLIDE 9

THE CORRIDOR MASTER PLAN

Looking at g at the b e bigger gger picture e : go good urban an des esign gn

  • Creating an intersection of lands

dsca cape architecture, infrastructure engin ineerin ing, urban business economics cs and planni ning ng

  • Preparation of draft master p

plan n covering South Kempsey, Kempsey and Frederickton and adjoining corridor linkages

  • Ensures a comprehensive approach to infrastructure planning and

execution of works within the Corridor into the future

  • Blueprint to further direct the precinct design program
  • Foundation document to assist in attracti

ting C Commo mmonwealth th a and Sta tate f fund unding to support future construction programs

slide-10
SLIDE 10

PRECINCT DESIGN

Mak aking i g it w work: ge getting t g the e detai ail r righ ght

  • Informed by the master plan, detail desig

igns prepared for South Kempsey, Kempsey and Frederickton

  • Selection of materia

ials, finishes, and plan lanting plans determined

  • Preparation of constructio

ion documentation.

slide-11
SLIDE 11
slide-12
SLIDE 12

PUBLIC CONSULTATION AND PARTICIPATION

Stage ge Activity Timefr fram ame

  • 1. U

Understand nding ing the p project, c community v values, s, aspirations a s and interest sts

  • Project website
  • Community surveys
  • Bypass Information Group [BIG1]
  • Stakeholder interviews
  • Community conversations [Oct/Nov]
  • Newsletter/fact Sheet #1

August – November 2011

  • 2. M

Master plan d develop

  • pment - options a

and concepts

  • BIG2 [early Feb 2012]
  • Newsletter / Fact Sheet #2
  • Website update
  • Community conversations [present options]

March 2012 December 2011 – March 2012

  • 3. F

Finalisation of f mas aster p plan an

  • BIG3 [May]
  • Additional meeting with key stakeholders
  • Public exhibition of draft master plan
  • Website updated

April – June 2012

Draft Consultation Program August 2011 – June 2012

slide-13
SLIDE 13

PUBLIC CONSULTATION AND PARTICIPATION

Stage ge Activity Timefr fram ame 1.

  • 1. P

Preci cinct design d develop

  • pment – options a

and concepts

  • BIG4 [July 2012]
  • Newsletter #3
  • Update website

July – Sept 2012 2.

  • 2. P

Preci cinct design d develop

  • pment - detaile

led

  • BIG5 [Dec 2012]
  • Display final precinct designs
  • Update website

October – December 2012

  • 3. F

Finalisation of precinct d designs

  • BIG6 [April 2013]
  • Newsletter #4
  • Update website
  • BIG7 [June 2013]
  • Community signoff [June 2013]

January – June 2013

Draft Consultation Program July 2012 – June 2013

slide-14
SLIDE 14

THE CORRIDOR MASTER PLAN

Stage ge Activity Timefr fram ame

  • 1. U

Understand nding ing the p project; c community v values, s, aspirations a s and interest sts

  • Define scope and working budget
  • Review existing documentation and identify

gaps

  • Develop community survey and fact sheet

August – November 2011

  • 2. M

Master plan d develop

  • pment – options a

and concepts

  • Prepare outline plan and analysis
  • Prepare concept options
  • Prepare preliminary estimates of total project

cost

  • Prepare preferred options to present to public

December – March 2012

  • 3. F

Finalisation of f mas aster p plan an

  • Prepare firmer estimates of TPC
  • Prepare final draft master plan based on

preferred option

  • Place master plan on public exhibition
  • Adopt master plan

April - June 2012

Draft Master Plan Program August 2011 – June 2012

slide-15
SLIDE 15

PRECINCT DESIGN

Stage ge Activity Timefr fram ame 1.

  • 1. P

Preci cinct design d develop

  • pment – options a

and concepts

  • Establish scope of design, resources TPC and

budget

  • Prepare concept design for each precinct
  • Select preferred option for each precinct

July – September 2012 2.

  • 2. P

Preci cinct Design d develop

  • pment - details

ls

  • Develop schedule of materials and finishes
  • Prepare detail documentation
  • Prepare final construction estimates
  • Prepare final precinct design drawings and

place on display October – December 2012

  • 3. F

Finalisation of Precinct d designs

  • Prepare construction documentation of each

final precinct design

  • Undertake planning for the preparation of

plans of management for key public open space within the corridor January – June 2013

Draft Precinct Design Program July 2012 – June 2013