Tier 2 in 2 A summary in 2 minutes or less Robin Long June 19, 2018 Status I Site capacity: 5000 cores, 2.5PB disk Shared cluster Oppertunistic use of local resources. Plenty of expansion room. Most services virtualised


slide-1
SLIDE 1

Tier 2 in 2

A summary in 2 minutes or less

Robin Long June 19, 2018

slide-2
SLIDE 2

Status I

  • Site capacity: 5000 cores, 2.5PB disk
  • Shared cluster
  • Oppertunistic use of local resources.
  • Plenty of expansion room.
  • Most services virtualised (VMWare), more on the way.
  • C7 Status: All compute, New Storage. Old storage still SL6.
  • DPM needs upgrade to non-legacy and C7.
  • IPv6:
  • Storage, dual stacked.
  • SQUIDs are next
  • Storage:
  • New storage is jbods + zfs.
  • No plans to retrofit old storage.
slide-3
SLIDE 3

Status II

  • Ansible:
  • Completed: BDII, SQUID, ARGUS (Partial)
  • To Do: CE(ARC), SGE Host
  • Monitoring:
  • Stable, but desire to move on.
  • Singularity:
  • Working locally.
  • Issues getting working with Grid.