The Talisman an Race New Talisman n Gold Mines Limited Where we - PowerPoint PPT Presentation

The Talisman an Race New Talisman n Gold Mines Limited Where we come from Where we are Where were going to 1903 2013 2017 Going For Gold ! History ry 90 Years in 90 Second nds Claim Long Tons Yield of Average Au


  1. The Talisman an Race

  2. New Talisman n Gold Mines Limited  Where we come from  Where we are  Where we’re going to 1903 2013 2017 Going For Gold !

  3. History ry – 90 Years in 90 Second nds Claim Long Tons Yield of Average Au Average Ag Bullion Grade * Grade Oz g/tonne g/tonne Crown 386,411 351,736 15.6 12.2 Talisman 687,043 3,510,691 27.8 128.6 Woodstock 49,165 139,767 15.3 71.6

  4. Modern n Times 1980 1986 1991 Crown Mines Mystery Vein Talisman Mine Dubbo Zone

  5. Where We Are We are here Going For Gold ! Clean-up of hardstand Stope Layout Gold Concentrate

  6. The Race Installation of 2 1 Services Procurement and Site Establishment Underground 3 Repairs 4 Bulk Sampling This is 6 Met Testing Not the 7 End 5 Full Consents Phase 1 Mine

  7. Procurem remen ent t and Site Establish ishme ment nt • Hardstand area adequate for requirements • Road Sufficient for 6 wheel truck • 3 Phase Power to site • Internal water Supply We will be the next underground mine operational in NZ Procur urem ement nt and Site te Establishment ent Other similar sized projects could take years and tens of millions of Dollars, we will take months and $1.5m

  8. Underg rgroun ound Repairs rs • Minor repairs to tunnel network to allow safe access to Multiple Ore Blocks

  9. Bulk Sampling ing and Met Testing ng Develop drives on • Mystery Develop Access • drive in Dubbo Drive on Mystery Increase and • upgrade Resources Increase Reserve • position Create • infrastructure for Drive on Maria Phase 1 mine

  10. Grade e is King (planned) Median Grade of Worlds Top 10 HG Ops months

  11. Questions ???? Competent Person Statement The information in this announcement that relates to the Talisman Project Prefeasibility Study and the Ore Reserve estimates was prepared by Wayne J Chowles, a Mining Engineer and member of the AusIMM. Mr Chowles is a full time employee of New Talisman Gold Mines Limited and the author of the Talisman Prefeasibiltiy Study referred to in this release. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves” . Mr Chowles consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. DISCLAIMER: Although New Talisman Gold Mines Ltd (NTL) commissioned the geological information and mining data referred to in this presentation, NTL does not guarantee or otherwise warrant the accuracy or currency of such information or data. Further, no representation is given or warranty is made in respect of any future performance of the share price of shares in NTL or any company associated with it. This document is not intended to, and does not, represent an offer of any securities. The terms target, potential and geological potential should not be interpreted as mineral resources as defined in the JORC Code 2004. The terms refer to the potential Quantity of metal that may be discovered with further exploration, and are conceptual in nature. There has been insufficient exploration to date to define Mineral Resources in these targets (except where reported as JORC-compliant), and it is uncertain if further exploration will result in such determination.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.