**The Master Book can be viewed at City Hall in the Clerks Office** What a CIP IS Tool for the scheduling, planning, and financing of large construction projects and major pieces of equipment Written document that links with the


  1. **The Master Book can be viewed at City Hall in the Clerk’s Office**

  2.  What a CIP IS “Tool” for the scheduling, planning, and financing of large construction projects and major pieces of equipment  Written document that links with the comprehensive plan and annual budget  Provides mayor, council, staff and citizens with a listing of capital projects for the next 5+ years

  3.  Not “Cast in stone”, it can be revised at any time  NOT a legal commitment to complete any particular project within a specified time  Does not obligate future Council’s to any course of action

  4.  Total Proposed Projects  $14,554,722 ($2,910,944 / year)  Equipment = 5%  Construction = 65%  Improvement = 10%  Building = 19%  Land = 0%  Other = 1% *There is another $16.5 million listed in future years

  5. Departmental Summary Percent Streets 2019-2023 2% of Total Water DEPARTMENT 2019-2023 Sewer 4% 16.08% Airport $ 2,340,000 2% Facility Maint 0% 0.38% Facility Maint $ 56,000 Police 1% 1.37% Fire $ 200,000 Airport Fire Airport 16% 9.48% Liquor $ 1,380,000 Parks 1% Facility Maint 1% 0.14% Library $ 20,000 Fire Liquor 62.25% Multiple $ 9,060,000 9% Liquor Multiple 1.17% Parks $ 170,000 Parks Planning $ 50,000 0.34% Multiple Police 62% Police $ 150,000 1.03% Sewer 2.39% Sewer $ 347,500 Streets 1.52% Streets $ 221,222 Water 0.07% Urban Forestry $ 10,000 3.78% Water $ 550,000 $14,554,722

  6. PROJECT DEPARTMENT COST 2019 Airport A/D Building Concept / Remodel Airport $ 750,000 Police Facility Maint Sewer Water Helicopter Operations Area Airport $ 250,000 1% Multiple 13% 4% Squad Car (to be purchased in 2021) Police $ 30,000 Parks Parks * TH71 S & 11th St Multiple $ 1,650,000 1% Police Deane Park Improve Phase 2 - 2018 & 2019 Parks $ 25,000 Sewer Heated Storage Building (moved from 2018) Water $ 75,000 Airport Water 30% Heated Storage Building (moved from 2018) Sewer $ 75,000 Install access controls-doors (from 2017) Facility Maint $ 40,000 Multiple 50% Cover on Lift #2 (replace) Sewer $ 20,000 Huntsinger Tower Recoat Water $ 350,000 Facility Rehab lift #5 Sewer $ 22,500 Maint 1% Total $3,287,500 * Bonded projects

  7. 2020 PROJECT DEPARTMENT COST Sewer Water Front End Loader/Blower Airport $ 240,000 5% 3% East Apron Rehabilitation (FFY 2019) Airport $ 500,000 Airport 24% East 16 unit T Hangar Rehabilitation (FFY 2019) Airport $ 250,000 Police 1% FBO Industrial Lot Expansion Airport $ 100,000 Airport Facility Maint Squad Car Police $ 30,000 Liquor * Fair,Stevens,Front,5th Str Multiple $ 2,980,000 Multiple Multiple 67% Police Wheel Loader Grapple Urban Forestry $ 10,000 Sewer Drive on Hoist for 1 ton truck Facility Maint $ 16,000 Urban Forestry Water Tractor/Mower (moved from 2019) Sewer $ 175,000 New Well Water $ 125,000 Rehab Lift #9 Sewer $ 35,000 $4,461,000 * Bonded project

  8. 2021 Police Planning 1% Airport PROJECT DEPARTMENT COST 1% Airport Liquor 6% Parks Private Hangar Taxilane Ext/Site Prep Lot 5-8 Airport $ 250,000 Multiple 2% Squad Car (to be purchased in 2021) Police $ 30,000 Parks Liquor * Franklin,Grove,King Street Utility & Street Impr Multiple $ 1,855,000 Planning 35% Multiple * Overlay Industrial Rd-Commerce-Ind. Ave Police Multiple $ 325,000 55% Comprehensive Plan Update-(from 2018) Planning $ 50,000 Deane Park Improve Phase 2 - 2018 & 2019 Parks $ 72,500 Liquor Store Building (Moved from 2019) Liquor $ 1,380,000 TOTAL $ 3,962,500 * Bonded project

  9. PROJECT DEPARTMENT COST 2022 Fire Streets 8% Sewer Salt/Sand Shed w/ Pavement Streets $ 221,222 Fir Multiple 1% e … Police * 2nd Street, 4th Street & Adjacent Alleys Multiple $ 2,250,000 Police Sewer 1% Squad Car Police $ 30,000 Streets Breathing Gear (Trying for a grant) Fire $ 200,000 Rehab lift #6 Sewer $ 20,000 Multiple * Bonded Projects $2,721,222 83%

  10. PROJECT DEPARTMENT COST 2023 Library Library HVAC system plans Library $ 20,000 Parks Library Police Police Squad Car (to be purchased in 2021) Police $ 30,000 16% 24% Deane Park Improve Phase 2 - 2018 & 2019 Parks $ 72,500 Parks 59% $122,500

  11. PROJECT DEPARTMENT COST Squad Car (to be purchased in 2021) Police $ 30,000 Wood Chipper 2014 (move to other yrs) Streets $ 20,000 Gravel Conveyor Streets $ 10,000 Crack Fill Machine Streets $ 45,320 Library Building Admin $ 1,900,000 Garage Bay Additions-PW/Safety Bldg Police $ 273,000 Red Bridge Park Impr Bldg Parks $ 65,000 * Western Avenue Overlay (South) Multiple $ 100,000 * Western Avenue Overlay (North) Multiple $ 80,000 Rice Park Parks $ 384,000 Tennis Court Replacement (4) Parks $ 450,000 * Riverside Area Phase II Multiple $ 2,300,000 Fire Engine Fire $ 500,000 * Central Ave & Baywood Extension Multiple $ 3,800,000 Video & Access Control Facility Maint $ 60,000 Police Body Worn Camera Systems Police $ 19,645 Construct South Connector Twy to Rwy 36 Airport $ 400,000 Install Taxiwa MITLS-Rwy 36 S Conn. Twy Airport $ 150,000 Runway 13-31 Pavement Reconstruction Airport $ 1,200,000 * Bonded Projects

  12. PROJECT DEPARTMENT COST Construct South Connector Twy to Rwy 36 Airport 400,000 Install Taxiwa MITLS-Rwy 36 S Conn. Twy Airport 150,000 Runway 13-31 Pavement Reconstruction Airport 1,200,000 Pavement crack and joint repair Airport 60,000 16 Unit T-Hangar 2017 West Apron Airport $ 700,000 16 Unit T-Hangar 2017 (Prep) West Apron Airport $ 300,000 T-Hangar Taxilane Extension Airport $ 350,000 East Apron Expansion (FFY 2019) Airport $ 500,000 East 16 unit T Hangar demolition (FFY 2019) Airport $ 100,000 Runway 18-36 Pavement Rehabilitation Airport $ 500,000 Pavement crack and joint repair Airport $ 60,000 Fuel System Upgrade Airport $ 100,000 Master Plan / ALP update Airport $ 500,000 Pavement crack and joint repair Airport $ 60,000 Runway 13-31 Pavement Rehabilitation Airport $ 500,000 Runway 18-36 Pavement Reconstruction Airport $ 1,000,000 * Bonded Projects $16,516,965

  13. Liquor Store Audit Comparisons 2012 2013 2014 2015 2016 2017 SALES AND COST OF SALES Sales $3,196,977 $3,283,862 $3,356,957 $3,200,752 $3,168,028 $2,989,179 Cost of Sales $2,396,366 $2,464,476 $2,536,797 $2,380,582 $2,405,513 $2,231,452 Gross Profit $800,611 $819,386 $820,160 $820,170 $762,515 $757,727 25% 25% 24% 26% 24% 25% OPERATING EXPENSES Wages and Salaries $319,189 $327,336 $334,215 $353,521 $370,564 $383,216 Materials and Supplies $9,230 $10,016 $10,177 $9,552 $9,899 $8,447 Repairs and Maintenance $7,054 $5,606 $17,057 $18,320 $1,883 $31,178 Professional Services $51,230 $56,494 $58,830 $58,819 $62,460 $66,903 Insurance $14,363 $16,969 $16,525 $13,836 $16,428 $15,170 Utilities $20,702 $21,409 $21,916 $20,165 $19,207 $20,091 Depreciation $34,186 $34,971 $35,668 $37,348 $39,965 $39,965 Other Expense $5,425 $3,259 $2,978 $6,046 $3,618 $2,760 Rent $570 $666 $588 $712 $738 $614 Total Operating Expenses $461,949 $476,726 $497,954 $518,319 $524,762 $568,344 Operating Income (Loss) $338,662 $342,660 $322,206 $301,851 $237,753 $189,383 Rent Investment Income $1,026 $1,247 $1,473 $1,919 $1,226 $1,780 Operating grants & contributions $1,183 $93 Other Income $338 $361 $197 $433 $215 Total Nonoperating Revenues (Expenses) $1,364 $1,608 $1,670 $2,352 $2,624 $1,873 Income (Loss) before Capital Contributions, Insurance Refunds and Transfers $340,026 $344,268 $323,876 $304,203 $240,377 $191,256 Capital Contributions Insurance Refunds $2,775 $5,845 $1,149 Transfers Out ($134,002) ($85,232) ($161,380) ($105,735) ($296,603) ($305,131) Change in Net Position $206,024 $261,811 $162,496 $204,313 ($56,226) ($112,726)

  14. 2019-2023 Effect on Liquor Reserves DEPT TOTAL 2019 2020 2021 2022 2023 Admin $ - $ - $ - $ - $ - $ - Airport $ 93,750 $ 172,500 $ - $ - $ - $ 266,250 Facility Maint $ 10,000 $ - $ - $ - $ - $ 10,000 Fire $ - $ - $ - $ - $ - $ - Liquor $ - $ - $ 1,380,000 $ - $ - $ 1,380,000 Library $ - $ - $ - $ - $ 20,000 $ 20,000 Multiple $ - $ - $ - $ - $ - $ - Parks $ - $ - $ 36,250 $ - $ 36,250 $ 72,500 Planning $ - $ - $ 25,000 $ - $ - $ 25,000 Police $ - $ - $ - $ - $ - $ - Sewer $ - $ - $ - $ - $ - $ - Storm Sewer $ - $ - $ - $ - $ - $ - Streets $ - $ - $ - $ 221,222 $ - $ 221,222 Urban Forestry $ - $ - $ - $ - $ - $ - W/S $ - $ - $ - $ - $ - $ - Water $ - $ - $ - $ - $ - Grand Total $ 103,750 $ 172,500 $ 1,441,250 $ 221,222 $ 56,250 $ 1,994,972

  15. Liquor Transfers from 2003 - 2017 BREAKDOWN OF DEPARTMENTS DEPT TOTAL AMT % Airport $ 689,319 21% Econ. Dev. $ 5,000 0% Fire $ 291,699 9% General $ 447,872 14% Parks $ 636,794 19% Planning $ 63,640 2% Police $ 150,755 5% Public Works $ 680,793 21% PW/W/S $ 84,854 3% Water/Sewer $ 40,830 1% Library $ 90,900 3% Admin $ 110,022 3% $ 3,292,477 100%

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.