The Culzean Development Martin Urquhart, Project Director, Maersk - PowerPoint PPT Presentation

The Culzean Development Martin Urquhart, Project Director, Maersk Oil UK What makes Culzean different to a conventional development? >5x pressure of normal reservoir and >2x temperature Equipment at technical limits of supply chain


  1. The Culzean Development Martin Urquhart, Project Director, Maersk Oil UK

  2. What makes Culzean different to a conventional development? >5x pressure of normal reservoir and >2x • temperature Equipment at technical limits of supply chain • capability Well costs c $250MM each. Normal well costs c • Common classification of HP/HT vs. uHP/uHT $40-50MM Fully rated API 15K WHP Topsides • Design challenges due to scale and weight of • API15k equipment. Example: Typical flowline cost of $250k. Culzean flowline • cost is $15MM Complex, high integrity safety systems to mitigate • risks ‘8” API 15K Ball Valve from FCT

  3. What’s the Impact on Time & Cost vs. NPNT? • Time Wells take nearly 1 year to drill • Specialist HDJU rig required: 2 year • construction Need three wells drilled before first gas • Minimize Depletion Drilling • • Cost Pre-FID investment on Culzean is $100s of • MM vs. pre-FID investment of $0-50MM HDJU commitment – 5yr Contract • WHP Jacket & WAD – 10,000Te • Long Leads for Initial Wells & Relief Wells • Image: HPHT wellhead being installed

  4. Case For Sanction? • Gas Bias Production Profile Lean Gas, Economics not reliant on oil price • Sheltered UK Gas market • • Fiscal Incentive Worked with Treasury at Select Gate • 1 st Cluster Allowance awarded • • Front End Loading Well Defined Requirements • 21 Long Leads worth $200MM procured & • novated • Market Deflation Contracts • Commodities •

  5. ~$2bn of Contracts Awarded 3 Topsides – SMOE Singapore • Power Generation Module Bridges • & Flare – SLP Lowestoft 3 Jackets – Hereema Vlissingen • 6 Pile Cluster & WAD – Heerema • Hartlepool Pipelines & Structures – Subsea 7 • Aberdeen FSO – Modec and Sembcorp • Marine TBD – Hook up & Commissioning • TBD – HUC Accommodation vessel •

  6. 21 st century installation Integrated operations using real time data • monitoring and analysis enabling faster decision making Fibre optic cable between base and field • Minimised offshore manning • Onshore integrated operations centre • providing 24/7 support 100m bridges link ULQ, WHP and CPF topsides • Human involvement on processing facilities • kept to a minimum 140 beds: no need for ‘walk to work’ vessels • Image: Siemens Walk Inside software allows users to interact with topside designs

  7. Long term outlook Production profile • £2.1bn OPEX • 150+ Contracts YTBA • CoP 2034 • UK energy security • Supporting thousands of jobs • Continued need for industry • efficiency

  8. Hub Potential Culzean is Cluster 001 • Exploration and Development • Expense can be offset against hub production Maersk and CoVs have • prospects in the area

  9. Maersk Oil: navigating complexity, unlocking potential

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.