TECH4EFFECT KNOWLEDGE AND TECHNOLOGIES FOR EFFECTIVE WOOD - - PowerPoint PPT Presentation

tech4effect
SMART_READER_LITE
LIVE PREVIEW

TECH4EFFECT KNOWLEDGE AND TECHNOLOGIES FOR EFFECTIVE WOOD - - PowerPoint PPT Presentation

TECH4EFFECT KNOWLEDGE AND TECHNOLOGIES FOR EFFECTIVE WOOD PROCUREMENT Raffaele Spinelli CNR IBE, Italy Angelo C. de Arruda Moura Suzano, Brazil This project has received funding from the Bio Based Industries Joint Undertaking under the


slide-1
SLIDE 1

This project has received funding from the Bio Based Industries Joint Undertaking under the European Union’s Horizon 2020 research and innovation programme under grant agreement No 720757.

Raffaele Spinelli – CNR IBE, Italy Angelo C. de Arruda Moura – Suzano, Brazil

TECH4EFFECT

KNOWLEDGE AND TECHNOLOGIES FOR EFFECTIVE WOOD PROCUREMENT

slide-2
SLIDE 2

Raffaele Spinelli & Angelo Conrado de Arruda Moura CNR – IBE, Suzano

Forwarder productivity and fuel consumption: benchmarks from fleet-level long-term records

slide-3
SLIDE 3
  • Largest agro-industry business in the World
  • 11 Mi. t capacity for cellulose, 1.7 Mi. t paper
  • 37000 employes and contractors
  • Operates in >80 countries
slide-4
SLIDE 4
  • 1.3 Mi. ha production
  • 0.9 Mi ha conservation
  • > 40 m3 ha-1 year-1
  • Mostly pulp
  • Mostly mechanized
  • E. Urograndis, 4-6 y.o.

Eucalypt plantations

slide-5
SLIDE 5
  • Constantly connected
  • Real-time monitoring
  • Certified

Centralized management

slide-6
SLIDE 6

A factory in the forest

slide-7
SLIDE 7

Ideal for data collection

slide-8
SLIDE 8

Previous studies

slide-9
SLIDE 9

Heavy forwarder: Komatsu 890

  • 177 kW
  • 18 t payload
  • 17-19 t tare
  • 7.5 m loader
  • 2.95 m wide
slide-10
SLIDE 10

3 configurations

slide-11
SLIDE 11

Monthly records

  • > 2000 records
  • 1.16 Mi. loads
  • 19 Mi. m3
  • 420,000 hours
  • > 5 Mi. L diesel

UNIDADE DCR_AGRU MES DCR_EQUIPAMENTO ID_EQUIPA HORAS CARGAS VOLUME DIESEL OLEO_HIDOLEO_TRAOLEO_MOT ARA BA 04 Clambunk Valmet 890.3 8X8 7239001 430.7 1002 16032 5960.5 20 9 24 ARA BA 04 Clambunk Valmet 890.3 8X8 7239002 410.7 910 14560 5328.9 25 247 24 ARA BA 04 Clambunk Valmet 890.3 8X8 7239003 429.8 1039 16624 5270.5 10 24 ARA BA 05 Clambunk Valmet 890.3 8X8 7239001 444.7 1089 17424 6594.8 79 48 ARA BA 05 Clambunk Valmet 890.3 8X8 7239002 386.8 904 14464 4892.5 61 48 ARA BA 05 Clambunk Valmet 890.3 8X8 7239003 480.9 1195 19120 6323.5 20 48 ARA BA 06 Clambunk Valmet 890.3 8X8 7239001 474.8 1151 18416 7609.9 161 48 ARA BA 06 Clambunk Valmet 890.3 8X8 7239002 475.7 1103 17648 6269.2 201 24 ARA BA 06 Clambunk Valmet 890.3 8X8 7239003 524.6 1345 21520 7070.8 70 24 ARA BA 07 Clambunk Valmet 890.3 8X8 7239001 525.2 1290 20640 8476.7 32 24

slide-12
SLIDE 12

Productivity

.25 .3 .35 .4 .45 .5 .55 Units h/trip Forw arder Valmet 890.3 8 x 8 Forw arder Valmet 890.3 Forw arder Valmet 890.2 Clambunk Valmet 890.3 8X8 Box Plot Split By: DCR_EQUIPAMENTO 25 30 35 40 45 50 55 60 65 Units m3/h Forw arder Valmet 890.3 8 x 8 Forw arder Valmet 890.3 Forw arder Valmet 890.2 Clambunk Valmet 890.3 8X8 Box Plot Split By: DCR_EQUIPAMENTO

slide-13
SLIDE 13

P < 0.001

890.2 890.3 8x8 Clambunk h/trip 0.41 0.37 0.36 0.33 m3/trip 13.4 15.9 15.8 15.9 m3/h 36.9 44.2 44.7 49.4 l/h 14.3 12.2 14.3 14.8 l/m3 0.43 0.28 0.32 0.30

slide-14
SLIDE 14

Considerations

  • 890.2 Least efficient (older model and specimen)
  • Clambunk most efficient (+ biomass)…..

…..but more complex organization

  • Limitations: no distance recorded….

….(but large #obs and generally even conditions)

  • Only small part of the data!
slide-15
SLIDE 15

Conclusions

  • Lots of reliable information
  • Production monitoring data has specific use
  • Combine several streams for modelling
slide-16
SLIDE 16

Acknowledgements

The project and research presented here has received funding from the Bio Based Industries Joint Undertaking under the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 720757.

www.tech4effect.eu

16