SLIDE 1 Team Members: Bradley Pasbjerg Chengeng Qu Matthew Marcantonio Ali Behbehani Facilitator:
Company contact: Jeffri Narendra
SLIDE 2
Design Specification Solution Risk Analysis Progress Schedule Budget
SLIDE 3 Temperature accuracy:
Temperature range:
Fast heating 24/7 operation Temperature deviation alert
SLIDE 4 Control System:
Cooling System:
Temperature Sensor:
Digital User Interference
SLIDE 5
User Interface (12 button keypad) Microcontroller Temperature Sensor Chamber PID Control Algorithm Phase Fired Controller Alert system
SLIDE 6
Phase fired controller
SLIDE 7
PID Control Unit PID Type C equation
SLIDE 8
PID algorithm determines phase control
position
Zero Cross detector triggers interrupt
which begins a timer on the MCU
Phase controller triggered after timer
reaches set point
Should work for both heating and cooling
SLIDE 9 Working with wall voltage at high current.
Existing insulation is good enough Thermodynamics of the chamber
SLIDE 10
Heater Batteries
SLIDE 11
Components Ordered User Interface Functional Interrupt functional, but sporadic. Zero
cross detector might not be getting a high enough voltage from our 10V test source. Testing with AC line voltage needs to be done.
SLIDE 12
Implement Design March / 20th - 30th Testing Design April / 5th – 18th Prepare for Design Day April / 23th – April / 27th
SLIDE 13
Microcontroller Provided Temperature Sensors $7 Liquid Nitrogen $50 Keypad $8 Alternistor $.73 LCD Provided Zero Cross Detector $.67 Total $66.40
SLIDE 14