Tahoe-Truckee Cloud Seeding Project Preliminary Results Water Year 2018 April 4, 2018 1 DRI Cloud seeding generator: on (Sierra Crest Tahoe Winter 2017-2018 Target area Mt Rose SWE (in) Echo Pk SWE (in) 8,800 MSL 7,653 MSL Control


slide-1
SLIDE 1

Tahoe-Truckee Cloud Seeding Project

1

DRI Cloud seeding generator:

  • n (Sierra Crest

Preliminary Results Water Year 2018 April 4, 2018

slide-2
SLIDE 2

Tahoe Winter 2017-2018

Mt Rose SWE (in) 8,800’ MSL

Echo Pk SWE (in) 7,653’ MSL CSS SWE (in) 6,894’ MSL Truckee2 SWE (in) 6,509’ MSL March 16.5” March 12.8” March 14.3” March 8.3” Target area Target area Control area Control area

slide-3
SLIDE 3

Winter Summary WY2018

November – A few big storms but snow levels often above 8,000’ (14” SWE at Mt Rose, 8” rain at Truckee 0.3” SWE) December – pretty dry, no SWE increase at Echo or Mt Rose January – Few storms (5” SWE/20” snow Mt Rose), (2” SWE at 10” snow at Truckee) February – Dry (1” SWE at Truckee, 1.7” SWE at Mt Rose) half in last 2 days of month March – Several big storms at fairly cold temperatures (16” SWE at Mt Rose, 8” SWE at Truckee) April - ? Very warm AR storm Friday/Saturday (high snow level)

slide-4
SLIDE 4

Cloud Seeding WY2018 Project

Smaller-scale project was planned for WY 2018 (Jan- Feb 2018) using the unused cloud seeding solution remaining from WY2017. Primary Sponsor – Western Regional Water Commission ($100,000) Additional Sponsor – Mt Rose Ski Resort ($2,500)

slide-5
SLIDE 5

WY 2018 Tahoe-Truckee network

5

CSG

slide-6
SLIDE 6

Tahoe-Truckee Project Preliminary Summary WY2018

6

  • 22 cloud seeding events
  • 487 total generator hours
  • seeding efficiency (N/A)
  • Estimated additional water

added to watershed (8,944 acre-feet (AF))*

  • Costs $11.46 acre-ft**
  • *2.9 billion gallons (if all added to river enough for ~21,000 Truckee Meadows Households)
  • ** Seeding solution cost not included in WY2018 project costs
slide-7
SLIDE 7

Tahoe-Truckee Project WY2018

7

October and November 2017

  • All cloud seeding generators were visited. The cloud seeding equipment was tested

and made fully operational, Barker Pass generators reinstalled per USFS permit.

  • All installed WRWC gauges were visited and serviced for the Water Year

measurements. December 2017 – Began informally watching the weather for seedable storms, Mt Rose joined the program. January – February 2018 – Official 24/7 forecasting and equipment maintenance

  • ccurred.
  • Daily Forecast Discussions
  • Weekly equipment testing
  • Field maintenance when required
  • 24/7 cloud seeding operations when required

March 2018 – Official program extended for one month April – June 2018 – End of season generator maintenance and equipment removal from

  • field. Data analysis of weather data and seeding operations, equipment reliability, and

calculations of cloud seeding SWE increases.

slide-8
SLIDE 8

Tahoe-Truckee Project Preliminary Summary WY2018

8

  • 22 cloud seeding events
  • 487 total generator hours
  • seeding efficiency (N/A)
  • Estimated additional water

added to watershed (8,944 acre-feet (AF))*

  • Costs $11.46 acre-ft**
  • *2.9 billion gallons (if all added to river enough for ~21,000 Truckee Meadows Households)
  • ** Seeding solution cost not included in WY2018 project costs (~$15.93 Acre-ft)
slide-9
SLIDE 9

WRWC Gauge Network

slide-10
SLIDE 10

Sierra Nevada

Ruby Mtns Toiyabe Tahoe/Truckee Carson Walker Mt Charleston Tuscarora Mtns. Humboldt Santa Rosa Mtns.

WY2019 Nevada State Program

slide-11
SLIDE 11

State Funded Portion - Tahoe-Truckee Project WY2018 – Full Program using 3 generators

11

  • Purchase all consumables (silver iodide, etc.)
  • Preseason site visits to fill generators and to

make equipment operational

  • Install Barker dual generators
  • Nov 1 – May 15 – 24/7l weather

forecasting/cloud seeding operations

  • Full time generator maintenance and servicing
  • Maintenance of all 8 precipitation gauges
  • Project data analysis, SWE increase estimates,

final report preparation

  • End of season site takedown
  • Pull Barker dual generators off site for summer

storage *Potential for about 11,000 acre-ft SWE on average winter

slide-12
SLIDE 12

WRWC Partner with the State Program?

12

  • Adopt 2 Tahoe generators
  • Site preparation
  • All consumables
  • Servicing trips
  • Communications
  • End of season take down.
  • $25K per generator
  • Potential to increase SWE by

more than 7,000+ acre-ft at cost of $7 acre-ft with State Program in place

slide-13
SLIDE 13

Thank You !

13

Any questions/comments?