System for Collecting and Analysing Sport Player Physical Data - - PowerPoint PPT Presentation

system for collecting and analysing sport player physical
SMART_READER_LITE
LIVE PREVIEW

System for Collecting and Analysing Sport Player Physical Data - - PowerPoint PPT Presentation

System for Collecting and Analysing Sport Player Physical Data Small or medium scale focused research project (STREP) Date of preparation : 23.11.2015. Work programme topic addressed ICT 16 2015: Big data research Name of the


slide-1
SLIDE 1

System for Collecting and Analysing Sport Player Physical Data

Small or medium scale focused research project (STREP) Date of preparation: 23.11.2015. Work programme topic addressed ICT 16 – 2015: Big data – research

Name of the coordinating person: Darko Stošić, Bojan Nestorović

1/21

Darko Stošić, Bojan Nestorović

slide-2
SLIDE 2

T able of contents

  • Project partners
  • Project abstract
  • Concept and objectives
  • The overall strategy of the work plan
  • Gantt chart
  • Work package list
  • Deliverable list
  • List of milestones
  • Summary efgort table
  • Pert chart
  • Management structure
  • Ethical issues

Darko Stošić, Bojan Nestorović

2/21

slide-3
SLIDE 3

Project Partners

Participant no.* Participant

  • rganisation name
  • Part. short name

Country 1 University of Belgrade, Mathematical Faculty, MATF Serbia 2 Samsung, www.samsung.com SAM South Korea 3 Nike, www.nike.com NIKE USA

Darko Stošić, Bojan Nestorović

3/21

slide-4
SLIDE 4

Project Abstract

  • Real time player analysis
  • Goal:
  • Afgordable
  • Easily accesible
  • Potential to transform and adapt to various sports
  • Final product:
  • Commercial system

Darko Stošić, Bojan Nestorović

4/21

slide-5
SLIDE 5

Concept and objectives

  • Developing a system that will ensure a positive future for sport teams
  • Watch-like device on a players wrist developed by Nike
  • Samsung Data Centre for Big Data analysis
  • Integrating all the data in a single solution

Darko Stošić, Bojan Nestorović

5/21

slide-6
SLIDE 6

Concept and objectives

Darko Stošić, Bojan Nestorović

6/21

slide-7
SLIDE 7

Concept and objectives

Darko Stošić, Bojan Nestorović

7/21

slide-8
SLIDE 8

Concept and objectives

Darko Stošić, Bojan Nestorović

8/21

slide-9
SLIDE 9

The overall strategy of the work plan

The project is organized in seven work packages as follows:

  • WP0 Project Management
  • WP1 Development of Use Cases
  • WP2 Development of System Architecture
  • WP3 Hardware Details
  • WP4 Software Details
  • WP5 T

esting

  • WP6 Releasing The Product

Darko Stošić, Bojan Nestorović

9/21

slide-10
SLIDE 10

Gant chart

Darko Stošić, Bojan Nestorović

10/21

slide-11
SLIDE 11

Work package list

Work packa ge No Work package title Type

  • f

activit y Lead partic no. Lead partic. Short name Perso n- month s Start mont h End mont h WP0 Project Management MGT 3 MATF, SAM,NIKE 74 M1 M12 WP1 Development of Use Cases RTD 1 MATF 16 M1 M2 WP2 Development of System Architecture RTD 2 MATF,NIK E 15 M1 M4 WP3 Hardware Details RTD 1 NIKE 12 M3 M7 WP4 Software Details RTD 2 SAM,MATF 17 M3 M7 WP5 T esting RTD/DE M 3 MATF, SAM,NIKE 150 M7 M11 WP6 Releasing the Product DEM 3 MATF, SAM,NIKE 60 M8 M12 TOTAL 344

Darko Stošić, Bojan Nestorović

11/21

slide-12
SLIDE 12

Deliverable list

Del. No. Deliverable name WP no. Natur e Disseminatio n level Delivery date (proj. Month) D0.1 Minutes from each Steering Committee meeting WP0 R PU M1,M6,M12 D0.2 Project handbook including quality management plan WP0 R PU M1 D0.3 Periodic reports at periods specifjed in the Grant Agreement WP0 R PU M1,M3,M6,M9, M12 D0.4 Signed Consortium Agreement WP0 R PU M1 D0.5 Audit certifjcates for each participant at times stated in the contract WP0 R PU M12 D0.6 Final reports at the conslusion of the project (fjnal activity report, supplementary fjnal reports and a report on distribution between participants of the fjnal payment) WP0 R PU M12

Darko Stošić, Bojan Nestorović

12/21

slide-13
SLIDE 13

Deliverable list

Del. No. Deliverable name WP no. Natur e Disseminati

  • n level

Delivery date (proj. Month) D1.1 T

  • p level Use Case Diagrams

WP1 O PU M2 D1.2 Detailed Use Case Diagrams WP1 O PU M2 D2 Architecture Specifjcation WP2 R PU M4 D3.1 Report on HW built into the system WP3 R PU M7 D3.2 Report on Communication system built into the system WP3 R PU M7 D4.1 Procedure details WP4 R PU M5 D4.2 Algorithmic details WP4 R PU M6 D4.3 Report on SW built into the system WP4 R PU M7 D4.4 Documented code WP4 R PU M7

Darko Stošić, Bojan Nestorović

13/21

slide-14
SLIDE 14

Deliverable list

Del. No. Deliverable name WP no. Natur e Disseminati

  • n level

Delivery date (proj. Month) D5.1 Report on testing results (MATF) R PU M10,M11 D5.2 Report on testing results (SAM) R PU M10,M11 D5.3 Report on testing results (NIKE) R PU M10,M11 D6.1 Project promotional materials R PU M11,M12 D6.2 E-bulletin/ newsletter released R PU M11,M12 D6.3 TV and internet marketing campaigns R PU M11,M12

Darko Stošić, Bojan Nestorović

14/21

slide-15
SLIDE 15

List of milestones

Milesto ne number Milestone name Work packag es involve d Expect ed date Means of verifjcation M0.1 Kick-ofg meeting WP0 M1 Minutes from kick-ofg meeting M0.2 Consortium agreement signed WP0 M1 Consortium Agreement with partner signatures M0.3 Project shut-down, all deliverables achieved WP0 M12 Final deliverables report M1 Finished Use Cases WP1 M2 Use Case Documentation M2 System architecture defjned WP2 M4 Architecture specifjcation M3 HW details defjned and clarifjed WP3 M7 HW report M4 SW details defjned and clarifjed WP4 M7 SW report M5 System tested in real life scenarios WP5 M10- M11 Reports on the testing results M6 Project marketed WP6 M11- M12 Project marketing campaign

Darko Stošić, Bojan Nestorović

15/21

slide-16
SLIDE 16

Summary of efgort

Partic. No.

  • Partic. short

name WP0 WP1 WP2 WP3 WP4 WP5 WP6 Total perso n month s 1 MATF 44 16 7 7 50 20 144 2 SAM 15 8 10 50 20 103 3 NIKE 15 12 50 20 97 T

  • tal

74 16 15 15 17 150 60 344

Darko Stošić, Bojan Nestorović

16/21

slide-17
SLIDE 17

Pert chart

Darko Stošić, Bojan Nestorović

17/21

slide-18
SLIDE 18

Management structure

Darko Stošić, Bojan Nestorović

18/21

slide-19
SLIDE 19

Ethical issues

  • No direct ethical, legal, social and safety issues
  • May arise with the training data
  • Consent asked beforehand
  • “I CONFIRM THAT NONE OF THE ABOVE ISSUES APPL

Y TO MY PROPOSAL”

Darko Stošić, Bojan Nestorović

19/21

slide-20
SLIDE 20

Questions?

Darko Stošić, Bojan Nestorović

20/21

slide-21
SLIDE 21

Thank You!

Darko Stošić, Bojan Nestorović

21/21