Study Purpose Update the Arterial Grid Analysis Phase I study results (2006) Evaluate the operation of arterial grid roadway system in Miami-Dade County Develop a consolidated database of traffic counts and estimate level of
Study Purpose
- Update the Arterial Grid Analysis – Phase I study results
(2006)
- Evaluate the operation of arterial grid roadway system in
Miami-Dade County
– Develop a consolidated database of traffic counts and estimate level of service – Develop roadway characteristics maps – Identify ways to improve capacity and efficiency of roadway network
2
Grid Road System - Benefits
- Choice
- Redundancy
- Safety
- Economic activity
- Smart growth
- Healthy communities
3
Key Findings
- A decreasing trend of traffic
volume between 2004/05 and 2011/12
- Traffic volume decreased in 68%
- f roadway segments evaluated
- Net change of Average Daily
Traffic at 1040 roadway segments is (-)1.94 million vehicles
- Consistent with national
trends
Gr e e n – volume de c r e ase d Re d – volume inc r e ase d
4
Key Findings
- Level of service deficiencies
- 35% of arterial segments and 7% of collector segments operate at
LOS F
- Fewer deficient corridors compared to 2004/05
- Connectivity improvements to collector roadways may help
relieve adjacent failing arterials
LOS F Roadway Segments b s by F Functional C Classi ssification
F unc tional Class % L OS F Se gme nts (2004/ 05 data) % L OS F Se gme nts (2011/ 12 data)
Co lle c to rs 17% 7% Arte ria ls 42% 35%
5
Key Findings
- Level of service deficiencies
- A higher proportion of deficient corridors are located
south of Flagler Street
North/ South County Distribution
C or be tte r D E F T
- tal
No rth o f F la g le r St 52% 24% 6% 18% 100% So uth o f F la g le r St 44% 26% 6% 24% 100% T
- ta l
48% 25% 6% 21% 100%
LOS Summary b by % % C Centerline e Miles es
6
- Improvements within
Priority Corridors (Type 1 projects)
– Roadway widening – Arterial grade separation – Interchanges at expressways – Intersection improvements
- Grid Network Connectivity
(Type 2 projects)
– At expressways – At canals – Other locations
Improve
- vement St
Strategie ies
Se e Handout
7
Priority Corridor (Type 1) Projects
Road F r
- m
T
- Impr
- ve me nt
Cate gor y
SW 42 Stre e t HE F T SW 137 Ave nue Wide n to 6 la ne s Wide ning SW 152 Stre e t SW 117 Ave nue US 1 Wide n to 6 la ne s Wide ning SW 8 Stre e t SW 107 Ave nue Gra de se pa ra te E
- W
thro ug h la ne s Arte ria l g ra de se pa ra tio n SW 8 Stre e t SW 137 Ave nue Gra de se pa ra te E
- W
thro ug h la ne s Arte ria l g ra de se pa ra tio n NW 36 Stre e t NW 72 Ave nue Gra de se pa ra te E
- W
thro ug h la ne s Arte ria l g ra de se pa ra tio n SW 56 Stre e t
- r SW 72
Stre e t Ho me ste a d E xte nsio n o f F lo rida ’ s T urnpike Pa rtia l inte rc ha ng e I nte rc ha ng e s SW 72 Stre e t SR 874 (Do n Shula E xpre sswa y) Pa rtia l inte rc ha ng e I nte rc ha ng e s SW 72 Stre e t SW 107 Ave nue I ndire c t le ft turns I nte rse c tio n impro ve me nts SW 117 Ave nue SW 128 Stre e t, SW 134 Stre e t, a nd SW 136 Stre e t Co ntinuo us flo w (turb o ) la ne s – so uthb o und SW 117 Ave nue I nte rse c tio n impro ve me nts
8
Priority Corridor (Type 1) Projects Benefits of Recommendations
Wide deni ning ng
- Would add 4.5 centerline miles (9 lane miles).
- Capacity of each widened segment would increase by 20,000 vehicles per day (at
LOS D). Arter erial G Grade S de Sepa paration
- Would benefit approximately 315,000 vehicles per day through reduced conflicts
and delay. (315,000 is the total ADT at the above three intersections). Int ntercha hang nges
- Potential redistribution of traffic from SW 40 Street and SW 88 Street between SR
826 and HEFT.
- Relieve interchanges at HEFT and SW 40 Street, HEFT and SW 88 Street, SR 874 and
SW 88 Street, and SW 72 Street and SR 826. Inter ersec section I n Impr provem emen ents
- Reduction of overall peak period delay
9
Example – Type 1 Project Partial Interchange - SW 72 Street and SR 874
10
Arterial Grid Network (Type 2) Projects
Road F r
- m
T
- Impr
- ve me nt
Cate gor y
SW 77 Ave nue SW 159 T e rra c e SW 160 T e rra c e Bridg e o ve r C-100A fe e de r c a na l Missing link a t c a na l SW 77 Ave nue SW 173 Stre e t SW 174 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 87 Ave nue SW 163 T e rra c e SW 164 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 102 Ave nue SW 145 Stre e t SW 146 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 122 Ave nue SW 210 Stre e t SW 212 Stre e t Bridg e o ve r Bla c k Cre e k c a na l Missing link a t c a na l SW 120 Stre e t SW 99 Co urt SW 99 Ave nue Bridg e o ve r C-100C c a na l Missing link a t c a na l SW 136 Stre e t Ha rriso n Stre e t SW 112 Ave nue Bridg e o ve r C-100 c a na l Missing link a t c a na l NE 215 Stre e t NE 14 Ave nue I
- 95
Co nstruc t 2 la ne fa c ility Othe r missing links SW 120 Stre e t SW 82 Ro a d US 1 Co nstruc t 2 la ne fa c ility Othe r missing links SW 127 Ave nue So uth o f SW 224 Stre e t W Dixie Hig hwa y Co nstruc t 2 la ne fa c ility Othe r missing links SW 16 Stre e t SR 826 (Pa lme tto E xpre sswa y) Co nne c t SW 16 Stre e t Missing link a t e xpre sswa y SW 120 Stre e t SR 874 (Do n Shula E xpre sswa y) Co nne c t SW 120 Stre e t Missing link a t e xpre sswa y
11
Arterial Grid Network (Type 2) Projects Benefits of Recommendations
Missi sing L Link nks s at Cana nals
- Improve continuity of the section-line and half section-line street network in
South Miami-Dade County Missi sing L Link nks s at E Expr press essways
- SW 16 Street to serve as a secondary E-W street and relieve SW 8 Street
- Establish SW 120 Street as a continuous section-line road in south Miami-Dade
County by completing missing segments Other er M Missi sing L Link nks
- Improve continuity of County Line Road
- Improve continuity of section-line street network in South Miami-Dade County
Al All P Proje jects
- Provide opportunities for multimodal connections
12
Example – Type 2 Project Missing Link - SW 120 Street at US 1
SW 120 Street 13
Next Steps
- Finalize the report
- Consider incorporating the recommended
improvements into the planning and prioritization processes
14