  1. Study Purpose • Update the Arterial Grid Analysis – Phase I study results (2006) • Evaluate the operation of arterial grid roadway system in Miami-Dade County – Develop a consolidated database of traffic counts and estimate level of service – Develop roadway characteristics maps – Identify ways to improve capacity and efficiency of roadway network 2

  2. Grid Road System - Benefits • Choice • Economic activity • Redundancy • Smart growth • Safety • Healthy communities 3

  3. Key Findings • A decreasing trend of traffic volume between 2004/05 and 2011/12 • Traffic volume decreased in 68% of roadway segments evaluated • Net change of Average Daily Traffic at 1040 roadway segments is (-)1.94 million vehicles • Consistent with national Gr e e n – volume de c r e ase d trends Re d – volume inc r e ase d 4

  4. Key Findings • Level of service deficiencies • 35% of arterial segments and 7% of collector segments operate at LOS F • Fewer deficient corridors compared to 2004/05 • Connectivity improvements to collector roadways may help relieve adjacent failing arterials LOS F Roadway Segments b s by F Functional C Classi ssification F unc tional Class % L OS F Se gme nts % L OS F Se gme nts (2004/ 05 data) (2011/ 12 data) Co lle c to rs 17% 7% Arte ria ls 42% 35% 5

  5. Key Findings • Level of service deficiencies • A higher proportion of deficient corridors are located south of Flagler Street LOS Summary b by % % C Centerline e Miles es North/ South County C or D E F T otal Distribution be tte r No rth o f F la g le r St 52% 24% 6% 18% 100% So uth o f F la g le r St 44% 26% 6% 24% 100% T o ta l 48% 25% 6% 21% 100% 6

  6. Improve ovement St Strategie ies Se e Handout • Improvements within Priority Corridors (Type 1 projects) – Roadway widening – Arterial grade separation – Interchanges at expressways – Intersection improvements • Grid Network Connectivity (Type 2 projects) – At expressways – At canals – Other locations 7

  7. Priority Corridor (Type 1) Projects Road F r om T o Impr ove me nt Cate gor y SW 42 Stre e t HE F T SW 137 Ave nue Wide n to 6 la ne s Wide ning SW 152 Stre e t SW 117 Ave nue US 1 Wide n to 6 la ne s Wide ning Gra de se pa ra te E -W Arte ria l g ra de SW 8 Stre e t SW 107 Ave nue thro ug h la ne s se pa ra tio n Gra de se pa ra te E -W Arte ria l g ra de SW 8 Stre e t SW 137 Ave nue thro ug h la ne s se pa ra tio n Gra de se pa ra te E -W Arte ria l g ra de NW 36 Stre e t NW 72 Ave nue thro ug h la ne s se pa ra tio n SW 56 Stre e t Ho me ste a d E xte nsio n o f F lo rida ’ s o r SW 72 Pa rtia l inte rc ha ng e I nte rc ha ng e s T urnpike Stre e t SW 72 Stre e t SR 874 (Do n Shula E xpre sswa y) Pa rtia l inte rc ha ng e I nte rc ha ng e s I nte rse c tio n SW 72 Stre e t SW 107 Ave nue I ndire c t le ft turns impro ve me nts Co ntinuo us flo w (turb o ) SW 117 SW 128 Stre e t, SW 134 Stre e t, a nd I nte rse c tio n la ne s – so uthb o und SW Ave nue SW 136 Stre e t impro ve me nts 117 Ave nue 8

  8. Priority Corridor (Type 1) Projects Benefits of Recommendations Wide deni ning ng Would add 4.5 centerline miles (9 lane miles). • Capacity of each widened segment would increase by 20,000 vehicles per day (at • LOS D). Arter erial G Grade S de Sepa paration Would benefit approximately 315,000 vehicles per day through reduced conflicts • and delay. (315,000 is the total ADT at the above three intersections). Int ntercha hang nges Potential redistribution of traffic from SW 40 Street and SW 88 Street between SR • 826 and HEFT. Relieve interchanges at HEFT and SW 40 Street, HEFT and SW 88 Street, SR 874 and • SW 88 Street, and SW 72 Street and SR 826. Inter ersec section I n Impr provem emen ents Reduction of overall peak period delay • 9

  9. Example – Type 1 Project Partial Interchange - SW 72 Street and SR 874 10

  10. Arterial Grid Network (Type 2) Projects Road F r om T o Impr ove me nt Cate gor y Bridg e o ve r C-100A SW 77 Ave nue SW 159 T e rra c e SW 160 T e rra c e Missing link a t c a na l fe e de r c a na l SW 77 Ave nue SW 173 Stre e t SW 174 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 87 Ave nue SW 163 T e rra c e SW 164 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 102 SW 145 Stre e t SW 146 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l Ave nue SW 122 Bridg e o ve r Bla c k Cre e k SW 210 Stre e t SW 212 Stre e t Missing link a t c a na l Ave nue c a na l Bridg e o ve r C-100C SW 120 Stre e t SW 99 Co urt SW 99 Ave nue Missing link a t c a na l c a na l SW 136 Stre e t Ha rriso n Stre e t SW 112 Ave nue Bridg e o ve r C-100 c a na l Missing link a t c a na l NE 215 Stre e t NE 14 Ave nue I -95 Co nstruc t 2 la ne fa c ility Othe r missing links SW 120 Stre e t SW 82 Ro a d US 1 Co nstruc t 2 la ne fa c ility Othe r missing links SW 127 So uth o f SW 224 W Dixie Co nstruc t 2 la ne fa c ility Othe r missing links Ave nue Stre e t Hig hwa y Missing link a t SW 16 Stre e t SR 826 (Pa lme tto E xpre sswa y) Co nne c t SW 16 Stre e t e xpre sswa y Missing link a t SW 120 Stre e t SR 874 (Do n Shula E xpre sswa y) Co nne c t SW 120 Stre e t e xpre sswa y 11

  11. Arterial Grid Network (Type 2) Projects Benefits of Recommendations Missi sing L Link nks s at Cana nals Improve continuity of the section-line and half section-line street network in • South Miami-Dade County Missi sing L Link nks s at E Expr press essways SW 16 Street to serve as a secondary E-W street and relieve SW 8 Street • Establish SW 120 Street as a continuous section-line road in south Miami-Dade • County by completing missing segments Other er M Missi sing L Link nks Improve continuity of County Line Road • Improve continuity of section-line street network in South Miami-Dade County • Al All P Proje jects Provide opportunities for multimodal connections • 12

  12. Example – Type 2 Project Missing Link - SW 120 Street at US 1 SW 120 Street 13

  13. Next Steps • Finalize the report • Consider incorporating the recommended improvements into the planning and prioritization processes 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.