Study Purpose Update the Arterial Grid Analysis Phase I study results (2006) Evaluate the operation of arterial grid roadway system in Miami-Dade County Develop a consolidated database of traffic counts and estimate level of


slide-1
SLIDE 1
slide-2
SLIDE 2

Study Purpose

  • Update the Arterial Grid Analysis – Phase I study results

(2006)

  • Evaluate the operation of arterial grid roadway system in

Miami-Dade County

– Develop a consolidated database of traffic counts and estimate level of service – Develop roadway characteristics maps – Identify ways to improve capacity and efficiency of roadway network

2

slide-3
SLIDE 3

Grid Road System - Benefits

  • Choice
  • Redundancy
  • Safety
  • Economic activity
  • Smart growth
  • Healthy communities

3

slide-4
SLIDE 4

Key Findings

  • A decreasing trend of traffic

volume between 2004/05 and 2011/12

  • Traffic volume decreased in 68%
  • f roadway segments evaluated
  • Net change of Average Daily

Traffic at 1040 roadway segments is (-)1.94 million vehicles

  • Consistent with national

trends

Gr e e n – volume de c r e ase d Re d – volume inc r e ase d

4

slide-5
SLIDE 5

Key Findings

  • Level of service deficiencies
  • 35% of arterial segments and 7% of collector segments operate at

LOS F

  • Fewer deficient corridors compared to 2004/05
  • Connectivity improvements to collector roadways may help

relieve adjacent failing arterials

LOS F Roadway Segments b s by F Functional C Classi ssification

F unc tional Class % L OS F Se gme nts (2004/ 05 data) % L OS F Se gme nts (2011/ 12 data)

Co lle c to rs 17% 7% Arte ria ls 42% 35%

5

slide-6
SLIDE 6

Key Findings

  • Level of service deficiencies
  • A higher proportion of deficient corridors are located

south of Flagler Street

North/ South County Distribution

C or be tte r D E F T

  • tal

No rth o f F la g le r St 52% 24% 6% 18% 100% So uth o f F la g le r St 44% 26% 6% 24% 100% T

  • ta l

48% 25% 6% 21% 100%

LOS Summary b by % % C Centerline e Miles es

6

slide-7
SLIDE 7
  • Improvements within

Priority Corridors (Type 1 projects)

– Roadway widening – Arterial grade separation – Interchanges at expressways – Intersection improvements

  • Grid Network Connectivity

(Type 2 projects)

– At expressways – At canals – Other locations

Improve

  • vement St

Strategie ies

Se e Handout

7

slide-8
SLIDE 8

Priority Corridor (Type 1) Projects

Road F r

  • m

T

  • Impr
  • ve me nt

Cate gor y

SW 42 Stre e t HE F T SW 137 Ave nue Wide n to 6 la ne s Wide ning SW 152 Stre e t SW 117 Ave nue US 1 Wide n to 6 la ne s Wide ning SW 8 Stre e t SW 107 Ave nue Gra de se pa ra te E

  • W

thro ug h la ne s Arte ria l g ra de se pa ra tio n SW 8 Stre e t SW 137 Ave nue Gra de se pa ra te E

  • W

thro ug h la ne s Arte ria l g ra de se pa ra tio n NW 36 Stre e t NW 72 Ave nue Gra de se pa ra te E

  • W

thro ug h la ne s Arte ria l g ra de se pa ra tio n SW 56 Stre e t

  • r SW 72

Stre e t Ho me ste a d E xte nsio n o f F lo rida ’ s T urnpike Pa rtia l inte rc ha ng e I nte rc ha ng e s SW 72 Stre e t SR 874 (Do n Shula E xpre sswa y) Pa rtia l inte rc ha ng e I nte rc ha ng e s SW 72 Stre e t SW 107 Ave nue I ndire c t le ft turns I nte rse c tio n impro ve me nts SW 117 Ave nue SW 128 Stre e t, SW 134 Stre e t, a nd SW 136 Stre e t Co ntinuo us flo w (turb o ) la ne s – so uthb o und SW 117 Ave nue I nte rse c tio n impro ve me nts

8

slide-9
SLIDE 9

Priority Corridor (Type 1) Projects Benefits of Recommendations

Wide deni ning ng

  • Would add 4.5 centerline miles (9 lane miles).
  • Capacity of each widened segment would increase by 20,000 vehicles per day (at

LOS D). Arter erial G Grade S de Sepa paration

  • Would benefit approximately 315,000 vehicles per day through reduced conflicts

and delay. (315,000 is the total ADT at the above three intersections). Int ntercha hang nges

  • Potential redistribution of traffic from SW 40 Street and SW 88 Street between SR

826 and HEFT.

  • Relieve interchanges at HEFT and SW 40 Street, HEFT and SW 88 Street, SR 874 and

SW 88 Street, and SW 72 Street and SR 826. Inter ersec section I n Impr provem emen ents

  • Reduction of overall peak period delay

9

slide-10
SLIDE 10

Example – Type 1 Project Partial Interchange - SW 72 Street and SR 874

10

slide-11
SLIDE 11

Arterial Grid Network (Type 2) Projects

Road F r

  • m

T

  • Impr
  • ve me nt

Cate gor y

SW 77 Ave nue SW 159 T e rra c e SW 160 T e rra c e Bridg e o ve r C-100A fe e de r c a na l Missing link a t c a na l SW 77 Ave nue SW 173 Stre e t SW 174 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 87 Ave nue SW 163 T e rra c e SW 164 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 102 Ave nue SW 145 Stre e t SW 146 Stre e t Bridg e o ve r C-100 c a na l Missing link a t c a na l SW 122 Ave nue SW 210 Stre e t SW 212 Stre e t Bridg e o ve r Bla c k Cre e k c a na l Missing link a t c a na l SW 120 Stre e t SW 99 Co urt SW 99 Ave nue Bridg e o ve r C-100C c a na l Missing link a t c a na l SW 136 Stre e t Ha rriso n Stre e t SW 112 Ave nue Bridg e o ve r C-100 c a na l Missing link a t c a na l NE 215 Stre e t NE 14 Ave nue I

  • 95

Co nstruc t 2 la ne fa c ility Othe r missing links SW 120 Stre e t SW 82 Ro a d US 1 Co nstruc t 2 la ne fa c ility Othe r missing links SW 127 Ave nue So uth o f SW 224 Stre e t W Dixie Hig hwa y Co nstruc t 2 la ne fa c ility Othe r missing links SW 16 Stre e t SR 826 (Pa lme tto E xpre sswa y) Co nne c t SW 16 Stre e t Missing link a t e xpre sswa y SW 120 Stre e t SR 874 (Do n Shula E xpre sswa y) Co nne c t SW 120 Stre e t Missing link a t e xpre sswa y

11

slide-12
SLIDE 12

Arterial Grid Network (Type 2) Projects Benefits of Recommendations

Missi sing L Link nks s at Cana nals

  • Improve continuity of the section-line and half section-line street network in

South Miami-Dade County Missi sing L Link nks s at E Expr press essways

  • SW 16 Street to serve as a secondary E-W street and relieve SW 8 Street
  • Establish SW 120 Street as a continuous section-line road in south Miami-Dade

County by completing missing segments Other er M Missi sing L Link nks

  • Improve continuity of County Line Road
  • Improve continuity of section-line street network in South Miami-Dade County

Al All P Proje jects

  • Provide opportunities for multimodal connections

12

slide-13
SLIDE 13

Example – Type 2 Project Missing Link - SW 120 Street at US 1

SW 120 Street 13

slide-14
SLIDE 14

Next Steps

  • Finalize the report
  • Consider incorporating the recommended

improvements into the planning and prioritization processes

14