Recycling and Conservation May 22, 2014 Kieran Barrows Facilities Engineer Chip MacLaughlin Water Resource Engineer Stratigraphic Display of 4 Stack Development Not to scale Represents ~5,000 ft 1 NYSE : LPI | www.laredopetro.com
NYSE: LPI | www.laredopetro.com
1
Not to scale Represents ~5,000 ft
Stratigraphic Display of 4 Stack Development
NYSE: LPI | www.laredopetro.com
2
Integrated Water Resources/Facility
NYSE: LPI | www.laredopetro.com
3
4 Stack Pad and Facility Layout
Water LP Gas Oil
3 Phase FWKO 3 Phase Heater Treater
LP Gas Oil Water LP Gas HP Gas for GL ~1100 psig LP Fuel Gas ~150 psig Well Well Future Well Future Well Future Well Well Well Future Well Metered GL gas
Well Pad
LP Fuel Gas to Rig ~150 psig Metered GL gas LP Fuel Gas to Rig ~150 psig
Well Pad
Oil
Intermediate Pad To Central Tank Battery
NYSE: LPI | www.laredopetro.com
4
Typical Production Corridor
NYSE: LPI | www.laredopetro.com
5
Water Resource Requirements for 4 Stack, 4 Rig Development Corridor
- Average Frac Rate (per well): 100 bbl/min
- Total Water Used (per well): 300,000 bbl
- Average Drill Time (per well): 25-30 days
- 7500’ Laterals
- 1 Rig for 4 Stack Lateral Water Usage:
1.2 MM bbl/month/pad
NYSE: LPI | www.laredopetro.com
6
Water Sources:
- Brackish Waters
- Flowback water
- Produced Water
- Fresh Water
GOAL: A 50% reduction of fresh water usage by 4Q 2016.
Recycle Water Availability
200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 4 8 12 16 20 24 28 32 36 40 44 48 BBL of Frac Water Month
4 Drilling Rigs - 4 Fracs per Month
Flowback Water Recovery Other Water Sources
NYSE: LPI | www.laredopetro.com
7 75,000 BPD at Capacity
- 34 Acres
- 75,000 BPD via 12” pipeline
and truck unloading
- 825 HP pumping capability
- Qty. 3 – 300,000 bbl double
lined pits with leak detection
- SCADA connected
- Water treating to slick water
frac standards
Recycle Plant Treatment Facility
NYSE: LPI | www.laredopetro.com
8
Closing Thoughts
Laredo is striving towards the goal of 100% use of flowback and produced water for drilling and completing operations. To achieve a sustainable water supply system to support exploration and production efforts, water resources must be viewed in an integrated fashion, including
- Development of water pipelines in production corridors
- Connection of multiple high volume frac pits across large
production areas
- Recycle facility connectivity to production corridors
- Development of non-potable water resources