Recycling and Conservation May 22, 2014 Kieran Barrows Facilities Engineer Chip MacLaughlin Water Resource Engineer Stratigraphic Display of 4 Stack Development Not to scale Represents ~5,000 ft 1 NYSE : LPI | www.laredopetro.com


slide-1
SLIDE 1

Recycling and Conservation May 22, 2014

Kieran Barrows – Facilities Engineer Chip MacLaughlin – Water Resource Engineer

slide-2
SLIDE 2

NYSE: LPI | www.laredopetro.com

1

Not to scale Represents ~5,000 ft

Stratigraphic Display of 4 Stack Development

slide-3
SLIDE 3

NYSE: LPI | www.laredopetro.com

2

Integrated Water Resources/Facility

slide-4
SLIDE 4

NYSE: LPI | www.laredopetro.com

3

4 Stack Pad and Facility Layout

Water LP Gas Oil

3 Phase FWKO 3 Phase Heater Treater

LP Gas Oil Water LP Gas HP Gas for GL ~1100 psig LP Fuel Gas ~150 psig Well Well Future Well Future Well Future Well Well Well Future Well Metered GL gas

Well Pad

LP Fuel Gas to Rig ~150 psig Metered GL gas LP Fuel Gas to Rig ~150 psig

Well Pad

Oil

Intermediate Pad To Central Tank Battery

slide-5
SLIDE 5

NYSE: LPI | www.laredopetro.com

4

Typical Production Corridor

slide-6
SLIDE 6

NYSE: LPI | www.laredopetro.com

5

Water Resource Requirements for 4 Stack, 4 Rig Development Corridor

  • Average Frac Rate (per well): 100 bbl/min
  • Total Water Used (per well): 300,000 bbl
  • Average Drill Time (per well): 25-30 days
  • 7500’ Laterals
  • 1 Rig for 4 Stack Lateral Water Usage:

1.2 MM bbl/month/pad

slide-7
SLIDE 7

NYSE: LPI | www.laredopetro.com

6

Water Sources:

  • Brackish Waters
  • Flowback water
  • Produced Water
  • Fresh Water

GOAL: A 50% reduction of fresh water usage by 4Q 2016.

Recycle Water Availability

200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 4 8 12 16 20 24 28 32 36 40 44 48 BBL of Frac Water Month

4 Drilling Rigs - 4 Fracs per Month

Flowback Water Recovery Other Water Sources

slide-8
SLIDE 8

NYSE: LPI | www.laredopetro.com

7 75,000 BPD at Capacity

  • 34 Acres
  • 75,000 BPD via 12” pipeline

and truck unloading

  • 825 HP pumping capability
  • Qty. 3 – 300,000 bbl double

lined pits with leak detection

  • SCADA connected
  • Water treating to slick water

frac standards

Recycle Plant Treatment Facility

slide-9
SLIDE 9

NYSE: LPI | www.laredopetro.com

8

Closing Thoughts

Laredo is striving towards the goal of 100% use of flowback and produced water for drilling and completing operations. To achieve a sustainable water supply system to support exploration and production efforts, water resources must be viewed in an integrated fashion, including

  • Development of water pipelines in production corridors
  • Connection of multiple high volume frac pits across large

production areas

  • Recycle facility connectivity to production corridors
  • Development of non-potable water resources