Status of Reconstruction in 3.5 and 3.6 D. Lange, J-R Vlimant 7/05/09 PVT Meeting Vlimant 1 Outline Report on 3.5 cycle Report on 3.6 cycle Suggested plan for next reprocessing 7/05/09 PVT Meeting Vlimant 2 Feature list for


  1. Status of Reconstruction in 3.5 and 3.6 D. Lange, J-R Vlimant 7/05/09 PVT Meeting Vlimant 1

  2. Outline ● Report on 3.5 cycle ● Report on 3.6 cycle ● Suggested plan for next reprocessing 7/05/09 PVT Meeting Vlimant 2

  3. Feature list for 3.5 (1) https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest35X#Executive_Summary ● Cleaning of Hcal noise in particle flow (also in 3.4) ● Track Jets are added to the standard reconstruction. (also in 3.4) ● Better DT segment cleaning. ● CSC ME1/1a segments have less ghost. ● Muon identification with calorimeter compatibility is improved. ● Particle flow muons now contain pure tracker muon. ● Better identification of muon from segment compatibility. ● Hcal noisy rechit flaging. ● Better Zero Degree Calorimeter noise reduction. ● ZDC in rechits and digis in reco event content. ● Improved Ecal rechit noise flagging. ● Improved electron and photon identification. ● Castor reconstruction in default reconstruction. ● Castor rechit, tower, clusters, and jet in event content. 7/05/09 PVT Meeting Vlimant 3

  4. Feature list for 3.5 (2) https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest35X#Executive_Summary ● dEdX is calculated without the pixel hits (also in 3.4) ● Better HO energy association to muon (also in 3.4). ● Better Hcal noise handling in MET (also in 3.4). ● Better beam halo identification (also in 3.4). ● Better Hcal rechit timing at low energy ● Calotower bad hit removal mechanism ● Ecal spike flagging and flagging infrastructure 3.5.6 * ● Particle flow nuclear interaction reconstruction ● Improved particle flow muon identification ● HF rechit cleaning 3.5.7 * ● Tuning of HF cleaning ● Updated software to use scaler beam-spot 3.5.8.patch3 * ● Protect all tracking seeding step to 10K seeds (*) not including the many big-fixes in the listing 7/05/09 PVT Meeting Vlimant 4

  5. Processing with 3.5.8.patch3 ● Full reprocessing available https://twiki.cern.ch/twiki/bin/view/CMS/ReproRequest358patch3  2010 and 2009 data ● Running on Tier0  Using the scaler beam-spot (scaler ~ BeamSpot::type()=LHC)  Pixel vertex not using the beam-spot constraint (inconsistent ?)  Conservative tracking seeding regions (~40 cm in z)  Loose PV reconstruction cuts (1 cm z-separation)  Loose photon reconstruction (5 GeV instead of 10 GeV, ...) ➢ Still need completion of validation for high level reconstruction ➢ The two datasets are not as consistent as we would like them to be due to the beam-spot, but the effect is minor. 7/05/09 PVT Meeting Vlimant 5

  6. Feature list for 3.6 (1) https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest36X#Executive_Summary ● CSC local reconstruction tuning ● Iterative tracking tuning ● Pixel vertexing clustering reduced to 1mm ● PV reconstruction improved ● Siscone 5 and 7 removed ● Jet-plus-track added ● Jet identification in HF ● HPS tau algorithm added ● Fixed cone tau algorithm removed ● Updated electron identification ● Improved information on soft lepton tagging ● Beam information ● Magnetic field value 7/05/09 PVT Meeting Vlimant 6

  7. Feature list for 3.6 (2) https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest36X#Executive_Summary ● Added product for bTagging ● Tuning of the HF PMT cleaning ● Updated software to use scaler beam-spot 3.6.1 * ● Protect all tracking seeding step to 10K seeds ● Pixel error unpacking ● Possible next things for 3.6 cycle ➔ Bug-fixes ... ➔ Particle flow back port ➔ Pre-shower back port ➔ Tracking seeding adaptive thresholds ➔ Tracker cluster adaptive thresholds ➔ Use channel status in Ecal unpacking ➔ Updated track-jet algo ➔ ... (*) not including the many big-fixes in the listing 7/05/09 PVT Meeting Vlimant 7

  8. Reprocessing with 3.6 (1) ● April 24 : https://twiki.cern.ch/twiki/bin/view/CMS/ReproRequest360 ➢ Configuration include  Adapted PV loose configuration ✗ Did not succeed: 20% failures. ➢ Memory issues with tracking due to an evolution of the third step ● April 28 : https://twiki.cern.ch/twiki/bin/view/CMS/ReproRequest360Bis ➢ Configuration include  tighter photon reconstruction  electron reconstruction out-of-the-box  Tuning of HF PMT cleaning ✔ Samples exist : 5% failures. ➢ Still memory issue with tracking 7/05/09 PVT Meeting Vlimant 8

  9. Reprocessing with 3.6 (2) ● May 5 : https://twiki.cern.ch/twiki/bin/view/CMS/ReproRequest360patch2 ➢ Include  Back-plane correction for strip local reconstruction  Update SiStrip Lorentz-Angle conditions  Updated strip gain conditions (not actually used) ✔ Sample exist ➢ Validated for tracking and Hcal ➢ Known issues with Ecal cleaning 7/05/09 PVT Meeting Vlimant 9

  10. Reprocessing with 3.6 ● Next pre- reprocessing : 3.6.1 ➢ Include ✔ All addition to 3.6.1(see previous slides) ✔ Validated with previous pre-reprocessing  Back-plane correction for strip local reconstruction  Update SiStrip Lorentz-Angle conditions ✔ Pre-validated  Updated strip gain calibration  Updated tracker alignment  Updated Ecal calibration ✗ To be pre-validated  Updated muon alignment (alignment and APE) ➔ Not enough stat ➔ Would the reprocessing of the muon skim be useful ? ➔ Next valSkim (358patch3) will be enriched in muon  Increase threshold on strip cluster ➔ Not easy to check for memory related crash 7/05/09 PVT Meeting Vlimant 10

  11. Next Reprocessings ● Plan A: pre-reprocessing with 3.6.1 and new conditions towards production next week (see previous slide) ➢ Takes ~2 days ✔ Pros: validated by Monday, switching to production next week ✔ Cons: beam-spot payload next week to be validated ● Plan B : full reprocessing with 3.6.1 and no new conditions with respect to 3.6.0.patch2 reprocessing (?) ➢ Takes ~5 days for 99% of data ➢ Takes a bit more for skims to be made ✔ Pros: get a full dataset with 3.6.1 ✔ Cons: beam-spot payload and conditions to be integrated 7/05/09 PVT Meeting Vlimant 11

  12. Summary ● 3.5.8.patch3 in production and good datasets available ● 3.6.1 in shape for reprocessing and production 7/05/09 PVT Meeting Vlimant 12

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.