STATUS AND CHALLENGES FOR ITS DEVELOPMENT IN LAO PDR 2 4 April 201 - - PowerPoint PPT Presentation

status and challenges for its development in lao pdr
SMART_READER_LITE
LIVE PREVIEW

STATUS AND CHALLENGES FOR ITS DEVELOPMENT IN LAO PDR 2 4 April 201 - - PowerPoint PPT Presentation

Expert Group Meeting and Regional Meeting on the Innovative and Integrated Intelligent Transport Systems (ITS) for the Development and Operation of Sustainable Transport Systems in Asia Pacific STATUS AND CHALLENGES FOR ITS DEVELOPMENT IN LAO


slide-1
SLIDE 1

Phanthaphap Phounsavath

Director Department of Transport Ministry of Public Works and Transport, Lao PDR

2 – 4 April 201 9, Incheon, Korea Expert Group Meeting and Regional Meeting on the Innovative and Integrated Intelligent Transport Systems (ITS) for the Development and Operation of Sustainable Transport Systems in Asia – Pacific

STATUS AND CHALLENGES FOR ITS DEVELOPMENT IN LAO PDR

slide-2
SLIDE 2

Presentation Outline

  • I. Country Profile
  • II. Transport Policy

III.Development Progress IV.Challenges

  • V. Recommendation
slide-3
SLIDE 3
  • I. Country Prof
  • I. Country Profile

ile

 Land Area : 236,800 km2  Population: 7.2 MIL (2018)  Population density: 35 persons/km2 (growing at 1.7%pa )  Border length of 5,083 km ‐ Myanmar 235 km ‐ Cambodia 541 km ‐ China 423 km ‐ Thailand 1754 km ‐ Viet Nam 2130 km  The economy base: agriculture, mining, hydro power and services  GDP growth 7% pa

slide-4
SLIDE 4

4

Relevant domestic laws: ‐ Road Transport Law ‐ Road Traffic Law

  • II. T
  • II. Transport

ansport Policy licy

“Lao Transport sector shall be highly effective and efficient with integrated sustainable Transport”.

Lao PDR Transport Vision by 2030 :

slide-5
SLIDE 5

Current implementing projects with ITS application :

1) Vientiane Sustainable Urban Transport Project

5

  • III. Development Progress
  • III. Development Progress

Financing Source: US$99.7 mil. from 6 sources Project component: 1. Bus Rapid Transit “BRT” 2. Parking management and enforcement 3. Traffic management system 4. Public space and non‐ motorized transport 5. Institutional capacity

slide-6
SLIDE 6

6

Vientiane Sustainable Urban entiane Sustainable Urban Transport Project ansport Project

improve urban transport operations and capacity in Vientiane by establishing a transport management entity, high‐quality bus services and bus rapid transit; by improving traffic management, parking system and vehicle registration; and improving accessibility for pedestrians and non‐motorized transport. The project started in June 2015 and expected completion by 2022.

Intl’ Airport

CBD

National University

slide-7
SLIDE 7

EW15 -Wat Mixay

(Before)

slide-8
SLIDE 8

EW15 -Wat Mixay (After)

slide-9
SLIDE 9

NS1-Talat Sao

(Before)

slide-10
SLIDE 10

NS1-Talat Sao

(After-option2)

slide-11
SLIDE 11

NS1-Talat Sao

(After-option2)

slide-12
SLIDE 12

NS3-VTE High School

(Before)

slide-13
SLIDE 13

NS3-VTE High School (After)

slide-14
SLIDE 14

NS15-Talat Sao Mall

(Before)

slide-15
SLIDE 15

NS15-Talat Sao Mall (After)

slide-16
SLIDE 16

Rue Hengboun (before)

slide-17
SLIDE 17

Rue Heng Boun (after)

slide-18
SLIDE 18

Chao Anou Road (before)

slide-19
SLIDE 19

Chao Anou Road (after)

slide-20
SLIDE 20

Rue Francois Ngin (before)

slide-21
SLIDE 21

Rue Francois Ngin (before)

slide-22
SLIDE 22

2) Modernised weighing station projects

22

  • III. Development Progress
  • III. Development Progress

2 modernised weighing station development project along AH No. 16 supported by JICA and AH No. 11 supported Thailand System linkage

slide-23
SLIDE 23

23

  • III. Development Progress
  • III. Development Progress

Weighing Station Ministry of Public Works and Transport Provincial Transport Bureau Number Plate Reading Camera

slide-24
SLIDE 24

Past experience on road and bridge damages:

24

  • III. Development Progress
slide-25
SLIDE 25

New Projects under discussion New Projects under discussion :

1) Traffic Management Center 2) Vehicle Control Center (GPS

Tracking system for both domestic and foreign commercial vehicles )

3) Vehicle Registration and Driving

Licensing System

25

slide-26
SLIDE 26

IV

  • IV. Challenges

. Challenges

26

  • Lack of political will (No specific Master Plan / Strategy on ITS).
  • Unclear knowledge and understanding among stakeholders on ITS

application.

  • Current road infrastructure are below standard and do not support

the application of ITS.

  • Lack of in – house capacity to identify, proceed ITS application.
  • Lack of budget for the development, still rely on foreign assistance.
  • Long

terms sustainability to continue the

  • peration

and maintenance of the project due to the lack of funds and capacity e.g. system

  • r

equipment break down, funds for repairs/maintenance and purchasing new equipment.

slide-27
SLIDE 27
  • V. Recommendation

Recommendation

 Develop National Master Plan/Strategy or Guideline on ITS.  Establish

a Committee/Council (all relevant agencies) to responsible and consensus on development and application of ITS.

 Require funds for ITS facilities development and equipment

installation (either grant, loan or PPP investment).

 Require capacity program for relevant institution and organization

e.g. training for high level policy makers, trainer level, implementation and enforcement level, and specific IT technical level.

 Require development of stronger cooperation and coolabolation

among member states and international

  • rganization

to experience and updates ITS activities.

27

slide-28
SLIDE 28

Thank you for Thank you for your kind attention! your kind attention!

  • Mr. Phanthaphap Phounsavath

Director, Department of Transport Tel: 021 417 293; 020 5634 4434 Fax: 021 415 563 Email: phanthaphap_ph@hotmail.com

28