SLIDE 2 HI GHLI GHTS:
ASX listing on 6 April 2006, codes AYR and AYRO Recent MOU on JV agreement with Nilandon Mining Group (Laos)
- n Nam Thong Copper-Gold Project area
Nam Thong has similarities to Sepon Cu-Au deposit to the SE Gold projects in WA with current total resource base of 308,000 ozs Pre-feasibility study completed on Comet Gold Mine area: treatment
- f ore on site has been on hold until higher gold price, or toll
treatment may occur sooner Exploration update at Horse Well gold project Exploration update at Kurrajong nickel project
SLIDE 3 Shares on issue: 69,300,000 (quoted 56,625,000) Current price: $0.15 Market Capitalisation: $10.4 million Listed options on issue: 35,000,000 Current price: $0.05 Exercise date: 6 April 2009 Top 5 shareholders:
Shareholder Name Number of shares Percentage Big Bell Gold Operations Pty Ltd 5,000,000 7.22% Jayson and Janet Meyers 4,000,000 5.77% Nakura Resources Pty Ltd 4,000,000 5.77% Frazerview Investment Pty Ltd 3,500,000 5.50% Auriferous Mining Ltd 2,499,925 3.61%
Cash on hand: approximately $2.2 million SHARE STRUCTURE AND CASH POSI TI ON
SLIDE 4 Peter Harold - Non-Executive Chairman Managing Director Sally Malay Mining Chairman –Territory Uranium
- Dr. Jayson Meyers – Managing Director
Assoc Prof Curtin University Ex Great Central Mines Group Peter Hepburn-Brown – Executive Director Also Kasbah Resources Ex Harmony Gold, Great Central Mines, WMC Kevin Hart – Non-Executive Director and Company Secretary Partner Endeavour Corporate
BOARD AND MANAGEMENT
SLIDE 5 LAOS PROJECT
- Project area highly prospective for Cu-Au mineralisation
- HOA signed with Nilandon Mining Group to earn up to 80%
interest
- Adjacent to Pan Australian’s Phu Bia Mine (2.0 Moz Au and 1.2
Mt Cu), and along strike from Oxiana’s Sepon Mine (4.5 Moz Au and 1.8 Mt Cu)
- Project area consists of mining concession area and application
for exploration and mining concession anticipated to be granted before the end of the year
- Entry into project to earn 60% is US$1.2M in 3 staged payments:
US$250K paid, US$300K on granting of application, and after 18
month exploration period US$650K (or exit with no interest)
- On completion of BFS earn 80%, then both parties contribute or
dilute.
SLIDE 6
SLIDE 7
SLIDE 8
Copper Occurrences Gold Occurrences
SLIDE 9
SLIDE 10
SLIDE 11
SLIDE 12
SLIDE 13
SLIDE 14
GENETIC MODELS FOR LAOS Cu-Au DEPOSITS
SLIDE 15 LAOS PROJECT
- Geology similar to Sepon: siltstones and limestones with high
level intrusions, silica and sulphide alteration, same foldbelt
- Potential for copper and gold
- Granted mining lease
- JV partners have good relations with local and national
government
- Number of untested areas of outcropping mineralisation and
geochemical anomalies
- No restrictions on foreign ownership
- Low cost labour force
- Relatively easy access
- Excellent time to be establishing projects in Laos
SLIDE 16
New Frontier
SLIDE 17
SLIDE 18
Project located near Cue Near operating mills at Mt. Magnet and Sandstone Evaluation completed on construction of a MMP at site
COMET-W EBB’S PATCH
SLIDE 19 COMET-W EBB’S PATCH
Principal strategy is to recommence mining at higher gold price Comet underground resource 165,000 ozs Pinnacles, Comet North, Eclipse, Comet South and Venus have over 65,000 ozs in
Ultramafic horizon identified having favourable rock chemistry for nickel-sulphide
Exploration using geophysics, structural studies and intensive drilling programs
Nickel Exploration area
SLIDE 20
COMET DRI LLI NG
Drilled approximately 6,500 metres to test fault zones hosting sulphide alteration and gold Discovered new high-grade zone 500 m to south of Comet Confirmed continuation of Comet structure at depth
SLIDE 21 COMET DRI LLI NG TARGETS Long section
shallow TEMPEST conductors
SLIDE 22
COMET DEEP DRI LLI NG FOR DEPTH CONTI NUATI ONS
SLIDE 23
COMET SAM SURVEYI NG Gold bearing structures detected and new targets generated Venus target drilled and showed low grade gold mineralisation
SLIDE 24 COMET PROJECT, MI NI NG
Pre-feasibility study completed May 2007:
- Metallurgical test results, so far high gravity recovery following
75 microns grind (>50%) with a total recovery of 94% with leaching
- This shows that gold with sulphide is non-refractory
- Optimal flow sheet for processing plant design
- Costing of plant components and construction
- Calculation of operating and site costs using updated quotes
- Mine design, ore-to-waste ratios, and development costs
- Mining costs and transport costs
- Treatment at site is an expensive option, and production
scenarios are more robust at higher gold price or using toll milling
SLIDE 25
SLIDE 26
Rock Chips: Nickel MgO
SLIDE 27 HORSE W ELL
gold resource of 75,000 oz above 100m depth
depth
potential
within tenement
- Within trucking distance to
Jundee and Wiluna mines
- Geophysics and drilling to
increase resources and explore for new deposits
SLIDE 28 HORSE W ELL
Well greenstone domain
resource of 600,000 t at 2.7 g/t
well-defined geological structures
drilling at other prospects
belt not effectively explored by drilling
SLIDE 29 HORSE W ELL Open cut resources and targets
Palomino Filly Bronco
SLIDE 30
HORSE W ELL Palomino Long section looking east
SLIDE 31 Horse Well prospects with N-S and NE trends digitised. The intersection lines coincide with the lineations observed at each of the deposits.
HORSE W ELL Leapfrog study
Target
SLIDE 32 HORSE W ELL SAM survey Results
cleared through Native Title
for Bronco and Filly
targeting and drilling in 2007
SLIDE 33
- 88 Creek project
- Entirely new gold province
in Australia
- Gold can be explained as an
epithermal deposit forming within the continental plate
- Several prospects with gold
in soils
NORTH KI MBERLEY
SLIDE 34 A c r
a t D
u m e n t
88 CREEK
- First pass drilling proved a
bedrock source for the gold
- Requires targeting and drilling
below low-grade gold intersections in order to test for high-grade mineralisation
8 8 CREEK
SLIDE 35
NORTH KI MBERLEY difficult field area
SLIDE 36 Kimberlite Kimberlite Intrusive Intrusive Porphyry Stock
High grade High grade gold target gold target at depth at depth Low sulphidation Low sulphidation system system
Epithermal gold model
8 8 CREEK
SLIDE 37
8 8 CREEK
Drill testing using a specialised rig that get into field area Drilling to occur when tenement extension granted and at end of cyclone season
SLIDE 38
- Progress exploration in Laos: company set up, preliminary
exploration, granting of concession, drilling in mining lease area, aggressive exploration
- Comet and Horse Well projects: commence mining on
favourable profit scenarios
- Targeting gold exploration at Horse Well
- Nickel exploration at Kurrajong project
- Drilling at 88 Creek on tenement extension
- Evaluate projects for acquisition
FUTURE ACTI VI TI ES