State Route 11 and 487 Reconstruction Town of Bloomsburg Public Meeting and Presentation June 5, 2019 Project Limits East Street (Main Street to 7 th Street) Poplar Avenue/Ferry Road (7 th Street to Susquehanna River Bridge) Full Depth


slide-1
SLIDE 1

State Route 11 and 487 Reconstruction Town of Bloomsburg

Public Meeting and Presentation June 5, 2019

slide-2
SLIDE 2

Project Limits

East Street (Main Street to 7th Street) Poplar Avenue/Ferry Road (7th Street to Susquehanna River Bridge) Full Depth Replacement Columbia Blvd. (East Street to Park Street) Milling and Overlay

slide-3
SLIDE 3

Project Schedule

  • Preliminary Design (Current Phase)
  • Preliminary Engineering Plans
  • Environmental Studies
  • Right-of-Way Clearance – Spring 2019 to Summer 2020
  • Final Design – Summer 2019 to Summer 2020
  • Utility Relocation Work – 2019 and 2020
  • Contract Award Date – Late 2020
  • Construction – Spring 2021 – Fall 2023
slide-4
SLIDE 4

Project Scope

East Street (Main Street to Columbia Boulevard)

slide-5
SLIDE 5

Project Scope

East Street (Columbia Boulevard to 7th Street)

slide-6
SLIDE 6

Project Scope

Poplar Street (7th Street to 9th Street)

slide-7
SLIDE 7

Project Scope

Poplar Street/Ferry Road (9th Street to Susquehanna River)

slide-8
SLIDE 8

Project Typical Section

slide-9
SLIDE 9

Project Scope

Columbia Boulevard (East Street to Park Street)

slide-10
SLIDE 10

Project Scope

Local Streetscape Project

slide-11
SLIDE 11

Proposed Traffic Control Plan

Poplar Street-Ferry Road-East Street (6th St. to Susq. River Bridge)

  • Full roadway closure of S.R. 0487
  • Posted detour in both directions
  • Work to be done in phases to maximize access to property
  • wners and businesses
slide-12
SLIDE 12

Traffic Control Plan Phase 1

slide-13
SLIDE 13

Traffic Control Plan Phase 1

slide-14
SLIDE 14

Traffic Control Plan Phase 2

slide-15
SLIDE 15

Traffic Control Plan Phase 3

slide-16
SLIDE 16

Traffic Control Plan Phase 4

slide-17
SLIDE 17

Traffic Control Plan Phase 5

slide-18
SLIDE 18

Proposed Traffic Control Plan

East Street (Main Street to 6th Street)

  • East Street has wide 46-foot cross-section
  • Roadway closure in NB direction with posted detours
  • Roadway to remain open in SB direction
  • Work to be done in phases to maximize access to

property owners and businesses

slide-19
SLIDE 19

Traffic Control Plan Phases 6-8

slide-20
SLIDE 20

Traffic Control Plan Phase 6

slide-21
SLIDE 21

Traffic Control Plan Phase 7

slide-22
SLIDE 22

Traffic Control Plan Phase 8

slide-23
SLIDE 23

Proposed Traffic Control Plan

  • Contractor will determine order of phasing
  • Contractor will not be permitted to close travel lanes on

the East Street section and Poplar Street/Ferry Road section at the same time

  • Contractor will hold a public meeting prior to construction

to explain schedule

slide-24
SLIDE 24

Proposed Traffic Control Plan

  • Signing for business access
  • Emergency responder coordination
  • Pedestrian Access and Detours Details
  • Tree Trimming and Removal
slide-25
SLIDE 25

Contact Information

Justin Gochenauer PennDOT Project Manager PennDOT Engineering District 3-0 715 Jordan Avenue P .O. Box 218 Montoursville, PA 17754 (717) 221-2010 c-jgochena@pa.gov

slide-26
SLIDE 26

Thank you for Attending Tonight’s Meeting Please help us by completing a project survey form and submitting in the designated Comment Box or mailing it to the PennDOT Project Manager

slide-27
SLIDE 27

Thank you for Attending Tonight’s Meeting You are invited to proceed to the Cafeteria, review the Project Displays and meet with the PennDOT Project Design Team