State Highway 5 (SH 5) From: South of FM 1378 To: South of CR 275 - PowerPoint PPT Presentation

State Highway 5 (SH 5) From: South of FM 1378 To: South of CR 275 Collin County, Texas VIRTUAL PUBLIC HEARING June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 June 11, 2020 PUBLIC HEARING PURPOSE 1. Inform the public of


  1. State Highway 5 (SH 5) From: South of FM 1378 To: South of CR 275 Collin County, Texas VIRTUAL PUBLIC HEARING June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 June 11, 2020

  2. PUBLIC HEARING PURPOSE 1. Inform the public of project status and project recommendations 2. Describe the project so the public can determine how they may be affected 3. Provide the public the opportunity to provide input 4. Develop a record of public participation June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 2

  3. HOW TO SUBMIT PUBLIC COMMENTS June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 3

  4. VIEWING DESIGN SCHEMATIC AND ENVIRONMENTAL DOCUMENTATION ▪ Websites: – www.keepitmovingdallas.com/SH5 Direct site link to the posted materials – www.txdot.gov Search “Public Meetings and Hearings” The information presented on these websites is the same information being presented in this video. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 4

  5. PROJECT LOCATION, NEED AND PURPOSE PR PROJE OJECT LIM CT LIMIT ITS: S: ▪ SH 5 from south of FM 1378 to south of CR 275 ▪ Project Length: 7.2 miles ▪ Cities of McKinney and Fairview ▪ Collin County PROJE PR OJECT NEED: CT NEED: ▪ Anticipated future traffic demand increase ▪ Highway does not meet current design and safety standards ▪ Increase in crashes within the project limits PR PROJEC OJECT T PUR PURPOSE: POSE: ▪ Improve safety and mobility ▪ Update roadway to current design and safety standards June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 5

  6. EXISTING HIGHWAY So South uth of of FM 1 FM 1378 8 to Sp o Spur ur 399 9 an and d Power erhouse house St St t to sou o south th of of CR CR 2 275: R 5: Rural ural Sec Secti tion, on, 2-lane lane Sp Spur ur 399 to o Mc McMakin Makin St St and and US US 38 380 to P o Power erhouse house St St: R : Rural ural to U o Urba rban n Tran ransition sition Sec Secti tion, on, 4-lane lane Mc McMak Makin in St St t to US 3 o US 380: 0: Urba rban n Sec Secti tion, on, 4-lane lane June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 6

  7. PROPOSED HIGHWAY So South uth of of FM 1 FM 1378 8 to Sp o Spur ur 399 9 an and d N T N Tenn ennessee essee St St t to sou o south th of of CR CR 2 275: U 5: Urba rban n Sec Secti tion, on, 4-lane lane Sp Spur ur 399 to El D o El Dora orado do Blv Blvd: U d: Urba rban n Sec Secti tion, on, 6-lane lane El D El Dorad orado o Blv Blvd t d to N T o N Tenn ennessee essee St St: U : Urba rban n Sec Secti tion, on, 4-lane lane June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 7

  8. UTILITY ADJUSTMENTS ▪ Underground and overhead utilities – Adjustments and relocations may be required prior to and during construction of the proposed project – No substantial service interruptions are anticipated June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 8

  9. PROJECTED COST & SCHEDULE Current Let Date Summer 2023 Construction Duration Approximately 3 years Estimated Total Project Cost $138 million June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 9

  10. REVIEW AND APPROVAL OF ENVIRONMENTAL DOCUMENT The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 10

  11. ENVIRONMENTAL REVIEW/IMPACTS ADDRESSED ▪ Air Quality ▪ Right of Way/Displacements ▪ Archeological Resources ▪ Traffic Noise ▪ Biological Resources ▪ Vegetation and Wildlife ▪ Community/Socioeconomic ▪ Water Resources ▪ Historic Resources ▪ Wetlands/Waters of the U.S. ▪ Hazardous Materials ▪ Section 4(f) Resources June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 11

  12. ENVIRONMENTAL REVIEW – RIGHT OF WAY Proposed Right of Way (ROW)/Displacements • Approximately 28 acres of new right of way would be required • Four commercial establishments would potentially be displaced • No residences would be displaced • All ROW acquisition would be completed in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 12

  13. ENVIRONMENTAL REVIEW – WATERS OF THE U.S. Waters of the U.S., including Wetlands • The project would impact eight jurisdictional stream crossings, totaling approximately 1.0 acres and one potential wetland at Wilson Creek, totaling 0.2 acres. • USACE Section 404 Nationwide Permit (NWP) 14 is required. A pre-construction notification (PCN) and compensatory mitigation would be required for the Section 404 impacts at 3 of the identified stream crossings and the potential wetland area. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 13

  14. ENVIRONMENTAL REVIEW – FLOODPLAINS Floodplains • Portions of the project are within the 100-year floodplains associated with Wilson Creek and East Fork Trinity River. • The hydraulic design for this project would be in accordance with current FHWA, TxDOT, and local design policies, laws, regulations, and standards. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 14

  15. ENVIRONMENTAL REVIEW – HISTORIC RESOURCES Historic Resources • Right of way would be needed from three properties containing historic structures: • 0.0014 acres of ROW from a property containing two listed historic structures (Joseph Field Dulaney House and the Faires-Bell House) • 0.0003 acres of ROW from a commercial building property listed as contributing to the McKinney Commercial Historic District (southwest corner of Anthony St. and SH 5) • 0.0026 acres of ROW from a commercial building property listed as contributing to the McKinney Commercial Historic District (northwest corner of E. Louisiana St. and SH 5) • The proposed project would have no adverse effects on the historic properties under Section 106 (identifies historic sites and project impacts). • A Section 4(f) De Minimis determination is anticipated – little to no impact to historic sites. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 15

  16. ENVIRONMENTAL REVIEW – HAZARDOUS MATERIALS Hazardous Materials • One hazardous materials site poses high environmental risk to the project, and four pose moderate environmental risk. • ROW acquisitions are anticipated for four of the high or moderate risk sites. • Special provisions will be included in the construction plans to handle hazardous materials and/or petroleum contamination according to applicable federal, state and local regulations. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 16

  17. ENVIRONMENTAL REVIEW – TRAFFIC NOISE Traffic Noise • Traffic Noise Analysis showed traffic noise impacts to multiple receivers. • Mitigation was analyzed for all impacted receivers. • Two noise barriers are proposed to mitigate for traffic noise. • A noise workshop will be conducted to allow property owners and residents adjacent to the proposed barriers to vote on their construction. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 17

  18. ENVIRONMENTAL REVIEW CONTINUED Conclusion: • Studies, analyses and evaluation of the proposed project indicate no significant impacts. June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 18

  19. NEXT STEPS AND TIMELINE • Public Comment Period (ends June 26, 2020) • Anticipated Environmental Clearance – July 2020 • ROW Acquisition Begins – Summer 2020 • Utility Relocation Begins – Fall 2021 • Construction Letting – Summer 2023 PROJECT TIMELINE “Dates subject to Change” Public ROW Construction Environmental Utility Public Schematic Meeting Acquisition Letting Clearance Relocations Hearing Approved held Anticipated Summer Summer November Fall 2021 June 2020 April 2020 July 2020 2023 2020 2018 June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 19

  20. HOW TO SUBMIT PUBLIC COMMENTS www.keepitmovingdallas.com/SH5 June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 20

  21. Thank you for your interest in the STATE HIGHWAY 5 (SH 5) IMPROVEMENTS PROJECT June 11, 2020 CSJs: 0047-05-054, 0364-04-049 & 0047-09-034 21

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.