Welcome Highway No.2 Replacement 8thStreet Structure HIGHWAY No. 2: - - PDF document

welcome
SMART_READER_LITE
LIVE PREVIEW

Welcome Highway No.2 Replacement 8thStreet Structure HIGHWAY No. 2: - - PDF document

HIGHWAV N0. 2: 8th STREET STRUCTURE REPLACEMENT Welcome Highway No.2 Replacement 8thStreet Structure HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT Scope Provide improvements to Highway No.2 (Sm Street) in order to provide a reliable across


slide-1
SLIDE 1

HIGHWAV N0. 2: 8th STREET STRUCTURE REPLACEMENT

Welcome

Highway No.2

8thStreet Structure

Replacement

HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT

Scope

» Provide improvements

to Highway No.2 (SmStreet) in order to provide a reliable

highway connection across the Dawson Creek

» Remove the existing creek culverts and

replace them with a bridge

» Improve the hydraulic capacity of the

Dawson Creek channel at 8”‘Street

» Relocate existing underground utilities

across the creek to make way for the new bridge crossing

» Improve pedestrian connectivity with the

construction

  • fa multi-use pathway

beneath the bridge

» Improve pedestrian

safety with the construction

  • f a wider sidewalk and

pathway across the bridge

Mimwlwol Inm>pm(.\lFurr and liilm.<uuuui«

_BltIH\H

(\rIi,\mr\

slide-2
SLIDE 2

HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT

Improvements for Pedestrians &Cyclists

HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT

Schedule

I

DESIGN

I

CONSTRUCTION 2019 2010 2021

June

100% Demailed Design

U

Summev

Tender

I

ran

=°"sm'°" Mmisrryoz 1 mvsponation Hm nsu

_

.....1 lulmstmumc (1)Iu\ImA

slide-3
SLIDE 3

HIGHWAV Na. 2: 8th STREET STRUCTURE REPLACEMENT

Kin Park

Dawsn ek M

Mmmrvu?

;.;.mN‘ Inn,

....:.m

(,«>wum\

mu

.\~||mnm

HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT

TrafficManagement

Phase 1

During the cmphase of construction, the ncnhr bound lanes will be closed and a slngle Vanein each direction willbe rerouted to the existing roadway to the west.

Phase 2

When the concrete has cured on the newly con— structed

east portion onhe

bridge, mmc wm be moved to the new bridge while the west ponion

45

constructed.

mun

Mnmrrv of In1n>po1|a\iun Hm I ma .....1 ]ulm.<umImr

('0:

mm:

\

HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT

Pedestrian Management

Dzwqm

max

mu

Muumrvu} H," ,

R |.‘.m,m.u;....

(«M

m

M

m...«.....m..