HIGHWAV N0. 2: 8th STREET STRUCTURE REPLACEMENT
Welcome
Highway No.2
8thStreet Structure
Replacement
HIGHWAY No. 2: 8th STREET STRUCTURE REPLACEMENT
Scope
» Provide improvements
to Highway No.2 (SmStreet) in order to provide a reliable
highway connection across the Dawson Creek
» Remove the existing creek culverts and
replace them with a bridge
» Improve the hydraulic capacity of the
Dawson Creek channel at 8”‘Street
» Relocate existing underground utilities
across the creek to make way for the new bridge crossing
» Improve pedestrian connectivity with the
construction
- fa multi-use pathway
beneath the bridge
» Improve pedestrian
safety with the construction
- f a wider sidewalk and
pathway across the bridge
Mimwlwol Inm>pm(.\lFurr and liilm.<uuuui«
_BltIH\H
(\rIi,\mr\