  1. St. Anthony of Padua Parish September 9, 2017

  2. 1 Peter 2:4-7a Come to him, a living stone , rejected by human beings but chosen and precious in the sight of God, and like living stones , let yourselves be built into a spiritual house to be a holy priesthood to offer spiritual sacrifices acceptable to God through Jesus Christ. For it says in scripture: “Behold, I am laying a stone in Zion, a cornerstone, chosen and precious, and whoever believes in it shall not be put to shame.” Therefore, its value is for you who have faith, but for those without faith: “The stone which the builders rejected has become the cornerstone”

  3. Rectory Tours

  4. St. Anthony of Padua Parish September 9, 2017

  5. How We Got Here • Rectory CommiQee formed May 2016 • Goal: Study the physical structure of the rectory to determine needs • Going into this project, the commiQee had the plan to renovate because we felt we were starVng with a good, solid structure

  6. History of the Rectory • Built in 1951 • 3 rd rectory built for our parish • Previous rectory (2 nd rectory) was 66 years old when the current rectory was built • Modest repairs and renovaVons done over the years

  7. CondiVon of the Rectory Ader a thorough examinaVon of the rectory, the following issues were idenVfied: • Roof – aged, worn-out • HVAC shingles & flat roof • Previous flooding in the basement • Single-pane windows • Ceiling, subfloor, & dry • Asbestos wall rot • Accessibility needs • Original wiring • 30+ year old furniture & • Original plumbing decor • Tuck-poinVng and other exterior updates

  8. RenovaVon Costs vs New ConstrucVon Costs REMODEL EXISTING RECTORY NEW CONSTRUCTION 2916 SF 1 st FL, 2419 SF 2 nd FL, 2916 SF Basement, 2,875 SF Residence, 661 SF Church Support 275 SF Breezeway & Breezeway, 3,793 Basement Demo of interior finishes & DemoliVon of exisVng MEP’s to studs rectory, asbestos Re-frame for ADA compliance abatement, breezeway Install new MEP’s then finish removal plus out $697,860 New construcVon $508,350 Remove flat roof & reframe Basement, concrete with new trusses $ 87,500 ramp, etc. $ 91,650 Replace exisVng windows $ 37,200 Furnishings $ 50,000 Asbestos abatement $ 20,000 Install 3-stop elevator $110,000 TOTAL $952,560 TOTAL $650,000

  9. Decision to Build vs Renovate • Cost • MulV-story living space vs single story • 70 year old building • Size / Square Footage of new construcVon • What happened to the money raised from Rise To The Challenge?

  10. Buildings & Maintenance and Technology • Long range plan for buildings, grounds, maintenance, and technology • IdenVfied projects over the next 5-8 years • CreaVng a campaign around the rectory and these projects • Projects listed only maintain the $30 million in assets on campus, not add new

  11. Buildings & Maintenance Projects • HVAC High School 2018-2022 $159,000 • HVAC Church 2018-2022 $ 60,000 • HS Windows 2018-2019 $ 10,000 • Asphalt Parking Lots 2019 $ 26,760 • HS Bathrooms(4) 2020-2022 $140,000 • HS Flat Roof 2021-2022 $ 25,000 • Parish Center Roof 2027 $110,000 TOTAL $530,760

  12. Technology Projects • Phone System Upgrade 2018 $ 57,000 • HS Teacher MacBooks 2018 $ 27,500 • HS Teacher iPads 2018 $ 9,328 • HS Staff Computers 2018 $ 3,500 • HS Projectors & App TVs 2018-2019 $ 13,200 • GS Projectors & App TVs 2019 $ 25,500 • Newtowk Servers 2019 $ 10,000 • GS Computer Lab 2019 $ 15,000 • PC Staff Computers 2019 $ 9,500 • GS Teacher Computers 2020 $ 13,500 • GS Staff Computers 2020 $ 5,500 TOTAL $189,228

  13. Timeline • Sept 28,2017 BIG DATE with the Diocese Commission for Buildings & ProperVes • Fall 2017 Finalize plans; Prepare bid package • January 2018 Project out for bid • February 2018 Bid awarded • Spring 2018 Determine construcVon Vmeline • 6-9 month construcVon process

  14. Timeline (cont) In the meanVme • Campaign starts to raise funds – 65% of rectory construcVon cost must be “in hand” before construcVon can begin • We will be moving OUT of the rectory – RelocaVng Fr. Ron – Moving furniture / items to parish center – Tossing items of no value

  15. We Ask For Your Help Please Pray For • Guidance • The safety of our workers • The success of our campaign • The construcVon process

  16. We Ask For Your Help We Need Volunteers • To be part of our campaign commiQee • To be willing to open your homes for Home Gatherings • To help us move out of the rectory • To help with the Treasure Sale in the spring

  17. We Ask For Your Help Pledge A Gid To The Campaign • One-Vme gid • 3 year pledge • Encourage family and friends to become Living Stones

  18. QUESTIONS?

  19. 1 Peter 2:4-7a Come to him, a living stone , rejected by human beings but chosen and precious in the sight of God, and like living stones , let yourselves be built into a spiritual house to be a holy priesthood to offer spiritual sacrifices acceptable to God through Jesus Christ. For it says in scripture: “Behold, I am laying a stone in Zion, a cornerstone, chosen and precious, and whoever believes in it shall not be put to shame.” Therefore, its value is for you who have faith, but for those without faith: “The stone which the builders rejected has become the cornerstone”

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.