SR-11 / OME POE Corridor Update

October 12, 2017

slide-2
SLIDE 2

2

State Route 11/Otay Mesa East POE

slide-3
SLIDE 3

3

Presidential Permit

  • Current Permit

Issued in November 2008

Permit expires in 10 years from date of issuance (November 2018)

– Before issuing the notice to proceed for construction, the permittee shall

  • btain the concurrence of the United States Section of the International

Boundary and Water Commission

  • Goal is to have a current permit at time of Construction
  • New Permit Schedule

Draft Environmental Re-Evaluation Mid August 2017 

Final Environmental Re-Evaluation September 2017 

Draft Permit Application to State Department October 2017 

Final Permit Application to State Department Late October 2017

Issuance of New Permit May - August 2018

  • Discussion Items

Letters of Support During Comment Period

GSA to be the Permittee

slide-4
SLIDE 4

4

Financial Strategy

slide-5
SLIDE 5

5

Corridor Update

slide-6
SLIDE 6

6

Traffic Monitoring Zones

6

slide-7
SLIDE 7

7

San Ysidro Border Wait Time Pilot

7

slide-8
SLIDE 8

8

Upcoming Construction 2018/2019

  • Leveraging Resources

Local SBX Funds $18.95M State Prop IB SHOPP $49.75M Total Project Cost $68.7M

Southbound Connectors Segment 2 of SR11

Fast Lane Grant $49.3M CBI for R/W $45.0 M Total Project Cost $118 M

slide-9
SLIDE 9

9

Southbound Connectors

slide-10
SLIDE 10

10

State Route 11- Segment 2A

slide-11
SLIDE 11

11

Right of Way State Route 11/Otay Mesa East POE

slide-12
SLIDE 12

12

Kearny Parcel

slide-13
SLIDE 13

13

Diverging Diamond Interchange at Enrico Fermi

slide-14
SLIDE 14

14

Binational Innovation Study Process

  • 1. Updated Baseline

POE Concept

  • 2. Innovative Concepts

(Physical & Technology)

  • 4. Traffic & Revenue Model
  • 3. Analysis

Preferred Concept:

  • Size of POE’s
  • Innovations to be

Included

  • Cost and Revenue

Information

slide-15
SLIDE 15

15

Preferred Alternative: Interchangeable Innovation

slide-16
SLIDE 16

16

Preferred Alternative: Interchangeable Innovation

  • Conceptual for Planning Studies Only

16

slide-17
SLIDE 17

17

Traffic and Revenue Model Roadmap

  • Time Penalties at Otay Mesa Cargo
  • Remove Double Stack Booths at OME
  • Code Consistency
  • Growth Rates
  • Processing Rates
  • Sensitivity Testing
  • Network
  • Data Collection
  • Queuing Model (Discrete Event Simulation)
  • Value of Time Segmentation & Processing Times
  • Trip Tables in Mexico
  • Existing Otay Expansion
  • Expert Review Panel on Strategy and Assumptions
  • Model Code Review / Quality Control
  • Model Updates
  • Model Runs

Calibration Validation (QA) Version 1.1 (Complete) Version 1.2 (Complete) Version 2.0 Version 2.1 QA/QC

slide-18
SLIDE 18

18

Binational Innovation Study Process

Agreements with US Federal Agencies Agreements with Mexican Agencies Preferred Concept:

  • Size of POE’s
  • Innovations to be

Included

  • Cost and Revenue

Information

ITS Concept

  • f Operations

Project Scope

  • n both sides
  • f the Border

Tolling/ Debt Sharing Agreements

O&M and Staffing Agreements

slide-19
SLIDE 19

19

Putting All the Pieces Together

slide-20
SLIDE 20

20

2016 2017 2018 2019 2020 2021 2022 Phase

Segment 1 SR-11 Segment 2A SR-11 Main Lanes Segment 2B CVEF/ Siempre Viva Segment 2C ITS Segment 3 POE Segment 4 SB Connectors EB SB Connector WB Previous NB Connectors

Construction Construction Construction Construction Design Design Design Design Innovation Analysis

Mar 2016 Oct 2013 Feb 2021 June 2022

Construction Design

June 2022

Negotiations Bridging Doc Design-Build

June 2022 Jan 2020 Jan 2022 Dec 2016 Jul 2015 OPEN TO TRAFFIC

Legend:

Site Prep and Utilities

Design Construction

SR-11 / OME POE Schedule -- DRAFT --

slide-21
SLIDE 21

21

Corridor Update