Springfield Utility Board February 10, 2016 There are two public hearings for a proposed electric rate increase. February 10 th and March 16 th . During the discussions with the SUB Budget Committee, the Board provided direction to spread
There are two public hearings for a proposed electric
rate increase. February 10th and March 16th.
During the discussions with the SUB Budget Committee,
the Board provided direction to spread a recommended rate increase out in smaller phases. The 2016 Budget rate increase out in smaller phases. The 2016 Budget assumed a 3.0% increase in electric rates effective April 1, 2016.
BPA’s Transmission and Power rates will be increasing
and represent ~66% of total Electric Utility Costs.
SUB’s 10-Year Plan contains increased Capital costs due
to investment in infrastructure.
BPA provided additional information on proposed
power and transmission rate increases effective October 1, 2015 and October 1, 2017
The 2016 budget process assumes the return of
the Swanson load. the Swanson load.
The 10-Year Plan presented to the budget
committee assumed larger electric rate increases every other year.
Based on input from the committee and the
Board, the recommendation is to plan for smaller increases every year. (e.g. 3% for 2016, 2017, 2018, and 2019).
Total Rate Revenue
2015 Rates April 2016 Proposed Rates % Change R1 $22,452,515 $23,126,161 3.00% R1 $22,452,515 $23,126,161 3.00% GS1 $3,937,268 $4,055,887 3.01% GS2 $14,534,712 $14,970,510 3.00% GS3 $3,016,257 $3,107,185 3.01% L1 $275,713 $283,984 3.00% L2 $24,878 $25,624 3.00% L3 $131,039 $134,971 3.00% $45,080,165 $46,434,439 3.00%
Effective Year R-1 GS-1 GS-2 GS-3 Lighting Total 2006 2.82% 2.82% 2.78% 2.40% 1.40% 2.75% 2007 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2008 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2009 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2010 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2010 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2011 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2012* 8.50% 8.49% 8.50% 8.50% 8.50% 8.50% 2013 4.00% 4.00% 4.00% 3.90% 4.00% 4.00% 2014 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2015 3.02% 3.07% 2.98% 2.98% 3.00% 3.00% 2016** 3.00% 3.01% 3.00% 3.01% 3.00% 3.00% 21.34% 21.39% 21.26% 20.79% 19.90% 21.25%
* Note: 2012 had two increases to total 8.50% ** Proposed April 1, 2016 change
Current Rates
- Base Charge:
$11.10
- Energy Charge
▪ October - April
▪ First 1,500 kWh: $0.0522/kWh ▪ 1,501+ kWh: $0.0582/kWh
▪ May - September
▪ First 900 kWh: $0.0522/kWh ▪ First 900 kWh: $0.0522/kWh ▪ 901+ kWh: $0.0552/kWh
Proposed Rates
- Base Charge:
$12.30
- Energy Charge
▪ October - April
▪ First 1,500 kWh: $0.0527/kWh ▪ 1,501+ kWh: $0.0607/kWh
▪ May - September
▪ First 900 kWh: $0.0527/kWh ▪ 901+ kWh: $0.0567/kWh
- Average Monthly Bill Increase
$1.91
The 3% overall increase in revenues for the
proposed residential rates reflects:
An increase of $1.20 to the base charge (this is
expected to reflect half of the increase in revenue from the residential class)
Increases in usage charges (this is expected to reflect Increases in usage charges (this is expected to reflect
half of the increase in revenue from the Residential class)
Under 2015 (current) rates, the residential base
charge collects ~16.4% of total residential electric revenue.
Under the proposed rates, the residential base
charge collects ~17.6% of total residential electric revenue.
Current Rates Base Charge
▪ Single Phase: $18.60 ▪ Three Phase: $35.10
Energy Charge
▪ October – April (all kWh): $0.0564/kWh ▪ October – April (all kWh): $0.0564/kWh ▪ May – Sept (all kWh): $0.0501/kWh
Proposed Rates Base Charge
▪ Single Phase: $20.40 ▪ Three Phase: $38.70
Energy Charge
▪ October – April (all kWh): $0.0571/kWh ▪ May – Sept (all kWh): $0.0508/kWh
- Current Rates
- Base Charge
▪ Single Phase $33.00 ▪ Three Phase $66.00
- Energy Charge
▪ October – April ▪ First 10,000 kWh $0.0608/kWh ▪ 10,001+ kWh $0.0448/kWh ▪ May – September ▪ First 10,000 kWh $0.0542/kWh ▪ First 10,000 kWh $0.0542/kWh ▪ 10,001+ kWh $0.0350/kWh
- Demand Charge (over 35 kW)
$6.40/kW
- Proposed Rates
- Base Charge
▪ Single Phase $38.70 ▪ Three Phase $78.30
- Energy Charge
▪ October – April ▪ First 10,000 kWh $0.0628/kWh ▪ 10,001+ kWh $0.0463/kWh ▪ May – September ▪ First 10,000 kWh $0.0560/kWh ▪ 10,001+ kWh $0.0361/kWh
- Demand Charge (over 35 kW)
$6.40/kW
Current Rates
Base Charge
▪ Single Phase $33.00 ▪ Three Phase $66.00
Energy Charge
▪ October – April $0.0431/kWh ▪ May – September $0.0386/kWh ▪ May – September $0.0386/kWh
Demand Charge (all kW)
$6.40/kW
Proposed Rates
Base Charge
▪ Single Phase $38.70 ▪ Three Phase $78.30
Energy Charge
▪ October – April $0.0448/kWh ▪ May – September $0.0403/kWh
Demand Charge (all kW)
$6.40/kW
Addition of $0.10 Infrastructure Charge to
Street Lighting Schedule (L-1)
Energy Charge for all Lighting customers
increased by 3.0%
Combined, the infrastructure charge and the
increase in energy charge results in an overall increase of 3%.
No action requested after this public hearing.
There will be another public hearing March 16, 2016.
New rates to be effective on customer bills
rendered on or after April 1, 2016.
Staff is available to answer questions after this
presentation, as well as during consideration
- f public comments.