Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Cornell NYC Tech Central Utility Plant Community Board 8 February - - PowerPoint PPT Presentation
Cornell NYC Tech Central Utility Plant Community Board 8 February - - PowerPoint PPT Presentation
Cornell NYC Tech Central Utility Plant Community Board 8 February 12, 2014 Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 N Community Board 8 Cornell NYC Tech Central Utility Plant Site Plan: CUP at North of
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Site Plan: CUP at North of Site
N
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Concept: CUP as a ribbon to connect the adjacent buildings
Exec Ed Center Exec Ed Center Residential Residential Central Utility Plant (CUP)
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
North Elevation: CUP in context of N Loop Road
First Academic Bldg + Entry Plaza 95’ DOT R.O.W. 50’ DOT R.O.W. 50’ Residential 40’ 20’
Landscape
Exec Ed Center Entry 87’ Central Utility Plant 210’ Esplanade Varies Esplanade Varies 552’
- El. +14’
- El. +14’
- El. +12.5’
- El. +40’-8”
- El. +96’-7”
- El. +200’ approx.
- El. +275’ approx.
- El. +21’
- El. +23’-6’
CUP FAB Exec Ed Resi
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
- 11,000 GSF
- Un-Occupied Equipment Building
- Not a Public Building / No Public Access
Only Accessible by Con Ed and Authorized Cornell Personnel
- Con Edison and Other Electrical Equipment to Serve Campus Buildings
- Renewable Energy Equipment Rooms (Photovoltaic Cells, Future Fuel Cell)
- Ancillary Equipment to Support the Building
- Non-Occupiable Green Roof and Rooftop Equipment with Screen
Building Program
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
ConEd utility louvers in NYC: Required per Con Ed Guidelines
Photos
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 1 1 Distribution Substation 2 Transformer Rooms 3 Network Compartment Rooms 4 Switchgear Lineups 5 Life Safety/ATS Room 6 Transformer Room 7 DC Distribution Room 8 Battery Room 9 Battery Room 10 Transfer Trip Room 11 MDF Room 12 Fuel Oil Room 13 Gas Meter Room 14 Water and Sewer Room 15 Janitor’s Closet 16 Resi Service Access
RESIDENTIAL BUILDING EXECUTIVE EDUCATION CENTER NORTH LOOP ROAD
2 13 12 14 15 16 3 4 5 6 7 8 9 10 11 N 181’ 210’
Floor Plan
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 SCALE 1 - SAWTOOTH OF BUILDING SCALE 2 - SAWTOOTH OF EACH BAY, 3’ WIDE PANEL SCALE 3 - SAWTOOTH OF FINS AT METAL PANEL
The building saw-soothes at three scales
Sawtooth at Multiple Scales
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 2 1 1 Green Roof System 2 Rooftop Enclosure - Wood Screen 3 Bulkhead 4 Fuel Cell 5 AHU 6 Generator
Green Roof System
3 4 5 5 6
RESIDENTIAL BUILDING EXECUTIVE EDUCATION CENTER
Roof Plan: Majority of the roof is a green roof system
N
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Campus and Context Material Palette
GRAVELS - PATHWAYS OF CAMPUS LANDSCAPE METALS - BLACKENED STAINLESS STEEL ADJACENT QUEENSBORO BRIDGE BOULDERS AND GREENERY BENCHES - BLACK LOCUST
The CUP emerges as a complement to the mineral material palette of the campus landscape and Queensboro Bridge
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
FAB Material Palette: CUP material is complementary
FIRST ACADEMIC BUILDING METAL PANEL SAMPLE
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Metal Material Precedent: Create visual interest with tone
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Sun Path Diagram
The CUP receives direct sunlight only in warmer months. It receives ambient light the rest of the year.
N
Summer Solstice Winter Solstice
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
The metal panels will have a varied fjnish, in both color and refmectivity to provide visual interest along the North facade.
CUP Material Palette
FIRST ACADEMIC BUILDING METAL PANEL SAMPLE CUP MATERIAL SAMPLE - VARIED PATINA AND REFLECTIVITY
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Photos of metal panel sample in varied natural light conditions
PHOTO 1 - VIEW LOOKING UP AT METAL PANEL SAMPLE PHOTO 2 - INDIRECT NATURAL LIGHT
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Rendering of proposed metal panel fjnish
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
North Elevation Rendering
Exec Ed Center Residential
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
ConEd required louvers outlined; to be behind metal panel system
CON ED REQUIRED STORM LOUVERS, CONCEALED BY METAL PANEL SYSTEM Exec Ed Center Residential
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
Lighting Analysis and Night Rendering
VERTICAL LED STRIP LIGHT
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
View West on North Loop Road: CUP left, existing building right
Summer, Early Morning
Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014
North Facade: View looking at
- ne bay of metal panel system