Cornell NYC Tech Central Utility Plant Community Board 8 February - - PowerPoint PPT Presentation

cornell nyc tech central utility plant community board 8
SMART_READER_LITE
LIVE PREVIEW

Cornell NYC Tech Central Utility Plant Community Board 8 February - - PowerPoint PPT Presentation

Cornell NYC Tech Central Utility Plant Community Board 8 February 12, 2014 Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 N Community Board 8 Cornell NYC Tech Central Utility Plant Site Plan: CUP at North of


slide-1
SLIDE 1

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Cornell NYC Tech Central Utility Plant Community Board 8

February 12, 2014

slide-2
SLIDE 2

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Site Plan: CUP at North of Site

N

slide-3
SLIDE 3

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Concept: CUP as a ribbon to connect the adjacent buildings

Exec Ed Center Exec Ed Center Residential Residential Central Utility Plant (CUP)

slide-4
SLIDE 4

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

North Elevation: CUP in context of N Loop Road

First Academic Bldg + Entry Plaza 95’ DOT R.O.W. 50’ DOT R.O.W. 50’ Residential 40’ 20’

Landscape

Exec Ed Center Entry 87’ Central Utility Plant 210’ Esplanade Varies Esplanade Varies 552’

  • El. +14’
  • El. +14’
  • El. +12.5’
  • El. +40’-8”
  • El. +96’-7”
  • El. +200’ approx.
  • El. +275’ approx.
  • El. +21’
  • El. +23’-6’

CUP FAB Exec Ed Resi

slide-5
SLIDE 5

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

  • 11,000 GSF
  • Un-Occupied Equipment Building
  • Not a Public Building / No Public Access

Only Accessible by Con Ed and Authorized Cornell Personnel

  • Con Edison and Other Electrical Equipment to Serve Campus Buildings
  • Renewable Energy Equipment Rooms (Photovoltaic Cells, Future Fuel Cell)
  • Ancillary Equipment to Support the Building
  • Non-Occupiable Green Roof and Rooftop Equipment with Screen

Building Program

slide-6
SLIDE 6

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

ConEd utility louvers in NYC: Required per Con Ed Guidelines

Photos

slide-7
SLIDE 7

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 1 1 Distribution Substation 2 Transformer Rooms 3 Network Compartment Rooms 4 Switchgear Lineups 5 Life Safety/ATS Room 6 Transformer Room 7 DC Distribution Room 8 Battery Room 9 Battery Room 10 Transfer Trip Room 11 MDF Room 12 Fuel Oil Room 13 Gas Meter Room 14 Water and Sewer Room 15 Janitor’s Closet 16 Resi Service Access

RESIDENTIAL BUILDING EXECUTIVE EDUCATION CENTER NORTH LOOP ROAD

2 13 12 14 15 16 3 4 5 6 7 8 9 10 11 N 181’ 210’

Floor Plan

slide-8
SLIDE 8

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 SCALE 1 - SAWTOOTH OF BUILDING SCALE 2 - SAWTOOTH OF EACH BAY, 3’ WIDE PANEL SCALE 3 - SAWTOOTH OF FINS AT METAL PANEL

The building saw-soothes at three scales

Sawtooth at Multiple Scales

slide-9
SLIDE 9

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014 2 1 1 Green Roof System 2 Rooftop Enclosure - Wood Screen 3 Bulkhead 4 Fuel Cell 5 AHU 6 Generator

Green Roof System

3 4 5 5 6

RESIDENTIAL BUILDING EXECUTIVE EDUCATION CENTER

Roof Plan: Majority of the roof is a green roof system

N

slide-10
SLIDE 10

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Campus and Context Material Palette

GRAVELS - PATHWAYS OF CAMPUS LANDSCAPE METALS - BLACKENED STAINLESS STEEL ADJACENT QUEENSBORO BRIDGE BOULDERS AND GREENERY BENCHES - BLACK LOCUST

The CUP emerges as a complement to the mineral material palette of the campus landscape and Queensboro Bridge

slide-11
SLIDE 11

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

FAB Material Palette: CUP material is complementary

FIRST ACADEMIC BUILDING METAL PANEL SAMPLE

slide-12
SLIDE 12

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Metal Material Precedent: Create visual interest with tone

slide-13
SLIDE 13

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Sun Path Diagram

The CUP receives direct sunlight only in warmer months. It receives ambient light the rest of the year.

N

Summer Solstice Winter Solstice

slide-14
SLIDE 14

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

The metal panels will have a varied fjnish, in both color and refmectivity to provide visual interest along the North facade.

CUP Material Palette

FIRST ACADEMIC BUILDING METAL PANEL SAMPLE CUP MATERIAL SAMPLE - VARIED PATINA AND REFLECTIVITY

slide-15
SLIDE 15

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Photos of metal panel sample in varied natural light conditions

PHOTO 1 - VIEW LOOKING UP AT METAL PANEL SAMPLE PHOTO 2 - INDIRECT NATURAL LIGHT

slide-16
SLIDE 16

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Rendering of proposed metal panel fjnish

slide-17
SLIDE 17

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

North Elevation Rendering

Exec Ed Center Residential

slide-18
SLIDE 18

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

ConEd required louvers outlined; to be behind metal panel system

CON ED REQUIRED STORM LOUVERS, CONCEALED BY METAL PANEL SYSTEM Exec Ed Center Residential

slide-19
SLIDE 19

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

Lighting Analysis and Night Rendering

VERTICAL LED STRIP LIGHT

slide-20
SLIDE 20

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

View West on North Loop Road: CUP left, existing building right

Summer, Early Morning

slide-21
SLIDE 21

Community Board 8 Cornell NYC Tech Central Utility Plant February 12, 2014

North Facade: View looking at

  • ne bay of metal panel system