Sp Springs I Initiative Gra rant Application on b by Cryst ystal R River Pelican B Bay P Pack ckage P Plant R t Removal Project Description: The existing package plant will be taken out of service. Upgrade the existing lift


  1. Sp Springs I Initiative Gra rant Application on b by Cryst ystal R River

  2. Pelican B Bay P Pack ckage P Plant R t Removal Project Description: • The existing package plant will be taken out of service. • Upgrade the existing lift station and connect to the existing forcemain stub-out. • Approximately 91 residential sewer connections. • Residents are low income. • Funding request includes connection fees. • Project to benefit Kings Bay • Located within PFA for Kings Bay • 0.6 miles from Kings Bay • Project Start: 2021 • Project Completion: 2022 2 2

  3. Project P Proximity t y to BM BMAP a P and PF nd PFA 3 3

  4. Pelican B Bay P Pack ckage P Plant R t Removal 4 4

  5. Pelican Ba Bay P y Package Pl Plant R Removal al O OPC PC Seeking funding for 100% of total project cost = $440,000 COST ESTIMATE FOR GRANT APPLICATION CITY OF CRYSTAL RIVER PELICAN BAY PACKAGE PLANT REMOVAL PROJECT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT PELICAN BAY PACKAGE PLANT DECOMMISSIONING, LIFT STATION UPGRADE, 1 1 LS $ 50,000 $ 50,000 FORCEMAIN CONNECTION, CONNECTION FEES 2 LIFT STATION UPGRADE 1 LS $ 40,000 $ 40,000 3 FORCEMAIN CONSTRUCTION 50 LF $ 5,000 $ 5,000 4 CONNECTION FEES 91 EA $ 3,425 $ 311,675 DESIGN, PERMITTING, BID ADMINISTRATION, AND CONSTRUCTION 5 1 LS $ 33,325 $ 33,325 ADMINISTRATION TOTAL $ 440,000 5 5

  6. Pelican B Bay P Pack ckage P Plant R t Removal • Package Plant Load to Ground Water • Annual Average TN = 5.9 mg/l • Actual Annual Average Flow = 0.007 mgd • 0.75 Attenuation Multiplier • 0.5 Recharge Factor • 47.0 lbs. of TN/Year to Ground Water • City’s WWTP Plant Efficiency • 3.9 mg/l of Nitrogen-Discharge Concentration • 7,000 GPD Flow from Package Plant • 0.75 Attenuation Multiplier • 0.0 Recharge Factor – All of the City’s reclaimed water is received by Duke Power • 0.0 lbs. of TN/Year to Ground Water • Cost Effectiveness for 30 year period • 47 lbs. of TN/Year removed Spring Shed • Project cost = $440,000 • $310.91 per lb. TN removed over 30 years. 6 6

  7. Sp Springs I Initiative Gra rant Application on b by Cryst ystal R River

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend