Sp Springs I Initiative Gra rant Application on b by Cryst - - PowerPoint PPT Presentation

sp springs i initiative gra rant application on b by
SMART_READER_LITE
LIVE PREVIEW

Sp Springs I Initiative Gra rant Application on b by Cryst - - PowerPoint PPT Presentation

Sp Springs I Initiative Gra rant Application on b by Cryst ystal R River Pelican B Bay P Pack ckage P Plant R t Removal Project Description: The existing package plant will be taken out of service. Upgrade the existing lift


slide-1
SLIDE 1

Sp Springs I Initiative Gra rant Application

  • n b

by Cryst ystal R River

slide-2
SLIDE 2

2

2

Pelican B Bay P Pack ckage P Plant R t Removal

Project Description:

  • The existing package plant will be taken out of service.
  • Upgrade the existing lift station and connect to the existing forcemain stub-out.
  • Approximately 91 residential sewer connections.
  • Residents are low income.
  • Funding request includes connection fees.
  • Project to benefit Kings Bay
  • Located within PFA for Kings Bay
  • 0.6 miles from Kings Bay
  • Project Start: 2021
  • Project Completion: 2022
slide-3
SLIDE 3

3

3

Project P Proximity t y to BM BMAP a P and PF nd PFA

slide-4
SLIDE 4

4

4

Pelican B Bay P Pack ckage P Plant R t Removal

slide-5
SLIDE 5

5

5

Pelican Ba Bay P y Package Pl Plant R Removal al O OPC PC

COST ESTIMATE FOR GRANT APPLICATION CITY OF CRYSTAL RIVER PELICAN BAY PACKAGE PLANT REMOVAL PROJECT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT 1 PELICAN BAY PACKAGE PLANT DECOMMISSIONING, LIFT STATION UPGRADE, FORCEMAIN CONNECTION, CONNECTION FEES 1 LS $ 50,000 $ 50,000 2 LIFT STATION UPGRADE 1 LS $ 40,000 $ 40,000 3 FORCEMAIN CONSTRUCTION 50 LF $ 5,000 $ 5,000 4 CONNECTION FEES 91 EA $ 3,425 $ 311,675 5 DESIGN, PERMITTING, BID ADMINISTRATION, AND CONSTRUCTION ADMINISTRATION 1 LS $ 33,325 $ 33,325 TOTAL $ 440,000

Seeking funding for 100% of total project cost = $440,000

slide-6
SLIDE 6

6

6

Pelican B Bay P Pack ckage P Plant R t Removal

  • Package Plant Load to Ground Water
  • Annual Average TN = 5.9 mg/l
  • Actual Annual Average Flow = 0.007 mgd
  • 0.75 Attenuation Multiplier
  • 0.5 Recharge Factor
  • 47.0 lbs. of TN/Year to Ground Water
  • City’s WWTP Plant Efficiency
  • 3.9 mg/l of Nitrogen-Discharge Concentration
  • 7,000 GPD Flow from Package Plant
  • 0.75 Attenuation Multiplier
  • 0.0 Recharge Factor – All of the City’s reclaimed water is received by Duke Power
  • 0.0 lbs. of TN/Year to Ground Water
  • Cost Effectiveness for 30 year period
  • 47 lbs. of TN/Year removed Spring Shed
  • Project cost = $440,000
  • $310.91 per lb. TN removed over 30 years.
slide-7
SLIDE 7

Sp Springs I Initiative Gra rant Application

  • n b

by Cryst ystal R River