Saratoga Springs – Lakeshore Trail

  • Saratoga Springs has an ongoing project to build a

new section of the Utah Lakeshore trail.

  • Saratoga Springs was awarded $996,000 in 2014
  • Need additional $300,000
  • 10% contingency = $99,600
  • Need and additional $200,400
slide-3
SLIDE 3

Proposed Motion: I move that we modify the Transportation Improvement Program to add $300k to the Utah Lakeshore Trail Project.

Saratoga Springs – Lakeshore Trail

slide-4
SLIDE 4

Utah County Disadvantaged Transit Pass Pilot Program

  • UTA was awarded $135,000 CMAQ funds for Van Pool

Expansion

  • UTA and Utah County would like to modify the scope of the

project to a pilot program that would provide transit passes to disadvantaged groups. (Graduates of the Utah County Jail’s RISE program and unsheltered victims of domestic violence)

  • Pilot program would last five years
  • Match would be provided by The Church of Jesus Christ of

Latter Day Saints and other faith based organizations

  • A major change to the scope of a project within the TIP requires

RPC approval

slide-5
SLIDE 5

Utah County Disadvantaged Transit Pass Pilot Program

Proposed Motion: I move that the TIP be modified to reflect the scope modification of the UTA van pool program to the Disadvantaged Transit Pass Pilot Program.