SPRC Meeting #2 December 16, 2019
SP #53, Key Bridge Marriott 1401 Lee Highway SPRC Meeting #2 - - PowerPoint PPT Presentation
SP #53, Key Bridge Marriott 1401 Lee Highway SPRC Meeting #2 December 16, 2019 1 Plans, Policies, and Projects 2 Master Transportation Plan Goal 2: Move More People Without More Traffic. Provide more travel choices and reduce the relative
1
SPRC Meeting #2 December 16, 2019
2
3
Goal 2:
Move More People Without More Traffic. Provide more travel choices and reduce
the relative proportion of single occupant-vehicle (SOV) travel through Transportation Demand Management (TDM), telecommuting, and travel shifts to other modes including transit, carpooling, walking, and bicycling. Strategies:
vehicle delay.
carpooling, and telecommuting
4
General Policy B: Support the Design and Operation of Complete Streets
Design and operate a comprehensive network of Arlington’s local and arterial streets to enable safe access by all user groups including pedestrians, bicyclists, transit vehicles and users, and motorists of all ages and abilities, allowing these users to access a full range of daily activities.
Above: City of Elizabeth, NJ
Example Pedestrian Policy: Provide straight, level, unimpeded and appropriately-designated pedestrian travel whenever feasible. Example Bicycle Policy: Provide high-quality bicycling facilities as a part
5
Goals and Policies (pp. 62-63):
Transportation Goal #3: Transform the pedestrian and bicycle network into a safer, more attractive and more accessible place to walk and bike.
connecting people with community and choices.
Vision principles (p. 49)
6
Goals and Policies (pp. 62-64):
T7: Improve the walking experience with wider sidewalks, new walkway connections, strategies to reduce topographic barriers, safer street crossings and enhancement of streetscape aesthetics. P5: Complete a new master plan for Gateway Park that calls for removing the existing superstructure and achieving a public park with the flexibility to accommodate a variety of park uses that enhance the
while providing an urban aesthetic that identifies this as a prominent gateway. Curb space priority #2: Provide curb nubs for pedestrian safety. Pedestrian Facilities
7
Along westbound Lee Highway, the multi-use Martha Custis Trail is being widened to 16 feet and shifted away from the travel lanes. On Fort Myer Drive, at westbound Lee Highway, VDOT has built a new curb extension on the south side of the intersection, reducing Fort Myer Drive, briefly, from four lanes to three, and creating a widened (14’) sidewalk there. Project completion: Spring 2020.
Westbound Lee Highway 2018 (at top) and 2020 (bottom). Image: VDOT.
8
9
10
11
Bus transit stop (Metrobus 3Y, ART bus 55) on westbound Lee Highway EB:
12
https://projects.arlingtonva.us/projects/core-rosslyn-transportation-study/