South Placer Municipal Utility District Carie Huff, District Engineer Eric Nielsen, Assistant Superintendent February 2020 Ob je c tive s Compliance General Waste Discharge Reqs Nexus Study Sustainability Repeatable process


slide-1
SLIDE 1

South Placer Municipal Utility District

Carie Huff, District Engineer Eric Nielsen, Assistant Superintendent

February 2020

slide-2
SLIDE 2

Ob je c tive s

  • Compliance
  • General Waste Discharge Reqs
  • Nexus Study
  • Sustainability
  • Repeatable process
  • Leverage investments in technology
  • Model for use during project/plan review
slide-3
SLIDE 3

T ime line

  • 2009
  • Master Plan
  • 2015
  • SECAP
  • 2020
  • SECAP Update
  • Update SECAP every 5 years
slide-4
SLIDE 4

Physic a l Mo de l

  • Model all pipes in system
  • Data input
  • pipe invert elevations
  • manhole rim elevations
  • Stored in GIS for other uses
slide-5
SLIDE 5

Hydra ulic L

  • a ding

EDUs (Tyler) Manholes (Lucity) Address (County GIS)

slide-6
SLIDE 6

E xisting

  • Year 2020
  • Calibrate against

flow recorder data

  • 190 gpd/EDU
  • (same as SPWA)
slide-7
SLIDE 7

Ne a r-T e rm

  • Year 2025
slide-8
SLIDE 8

L

  • ng -T

e rm

  • Year 2060
  • (same as SPWA)
  • Urban Growth Area

(UGA)

  • (same as SPWA)
slide-9
SLIDE 9

E DUs Ove r T ime

200 400 600 800 1000 1200 1400 1600 1800 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060

EDUs/year Total EDUs

Cumulative Total of EDUs Over Time

Total EDUs Five Year Running Average of EDUs/yr

slide-10
SLIDE 10

Pro je c ts

  • To provide needed

capacity for planned growth

slide-11
SLIDE 11

Pro je c t Co sts

  • Based on

Schedule of Values from Resolution 18-22

  • Split between
  • Fund 300 - SECAP
  • Fund 400 - R&R
  • Cross-sectional area based

18” – 1.77 ft2 24” – 3.14 ft2 44% 56%

slide-12
SLIDE 12

Pro je c t Co sts

  • New Projects
  • Sierra College Trunk
  • Cameo Trunk
  • Updates
  • Reviewed timing
  • Revisited naming
  • Created project IDs
slide-13
SLIDE 13

2020 SE CAP

2020 SE CAP Cost 2020 R&R Cost 2020 T

  • tal

Cost

Co nstruc tio n $ 54,300,560 $ 23,913,903 $ 78,214,464 30% Co nting e nc y $ 16,290,168 $ 7,174,171 $ 23,464,339 10% De sig n $ 5,430,056 $ 2,391,390 $ 7,821,446

T

  • tal $ 76,020,785 $ 33,479,464 $ 109,500,249
slide-14
SLIDE 14

Ne xus Study

  • Compliance
  • Mitigation Fee Act – Section 66000
  • Eight steps for plan-based fee methodology
  • Ongoing Administration
  • Fee adjusted annually per Ordinance 17-03
  • Report annually and every five years
slide-15
SLIDE 15

T

  • ta l SE

CAP I mpro ve me nt Co sts $ 76,020,785 E xisting CI P F und Ba la nc e 2019 (inc lude s NSD de b t)

  • $ 26,407,335

F unds ne e de d fo r SE CAP I mpro ve me nts $ 49,613,450 Additio na l E DUs (2060) 12,320

Re sulting Par tic ipation F e e $ 4,027

Re sulting Pa rtic ipa tio n F e e

Cur r e nt F e e = $ 4,014

slide-16
SLIDE 16

Histo ry o f L

  • c a l Pa rtic ipa tio n F

e e

2250 2500 2500 2500 2100 3000 3750 3750 3923 4014 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000 $4,500 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20

Local Participation Fee Fiscal Year

slide-17
SLIDE 17

Sta ff Re c o mme nda tio ns

  • Adopt Resolution 20-06
  • Accepting the SECAP
  • Adopt Resolution 20-07
  • Accepting the Nexus Study
slide-18
SLIDE 18

Ne xt Ste ps

  • Post SECAP to District Website
  • Post Nexus Study to District Website
  • Apply Results of Nexus Study
  • FY 20-21 fees based on results