slide 1 slide 2 slide 3 slide 4 slide 5 slide 6 slide 7
play

Slide 1 Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Dubois - PowerPoint PPT Presentation

Slide 1 Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Dubois Farm Subdivision Schedule A Slide 8 Dubois Farm Subdivision Schedule B Slide 9 Slide 10 Slide 11 Slide 12 Slide 13 Slide 14 Jennings Farm Schedule A Slide 15


  1. Slide 1

  2. Slide 2

  3. Slide 3

  4. Slide 4

  5. Slide 5

  6. Slide 6

  7. Slide 7

  8. Dubois Farm Subdivision Schedule A Slide 8

  9. Dubois Farm Subdivision Schedule B Slide 9

  10. Slide 10

  11. Slide 11

  12. Slide 12

  13. Slide 13

  14. Slide 14

  15. Jennings Farm Schedule A Slide 15

  16. Proposed Temporary Construction Access Slide 16

  17. Proposed Temporary Construction Access Slide 17

  18. Proposed Temporary Construction Access Slide 18

  19. Proposed Temporary Construction Access Slide 19

  20. Approximate Location of Existing Sanitary Easement and Proposed Interconnection Slide 20

  21. Jennings Farm Schedule B Slide 21

  22. Jennings farm Schedule C Slide 22

  23. Jennings Farm Schedule D Slide 23

  24. Proposed Alternative Access Slide 24

  25. Proposed Alternative Access Slide 25

  26. Proposed Alternative Access Slide 26

  27. Proposed Alternative Access Slide 27

  28. Proposed Alternative Access Slide 28

  29. Proposed Alternative Access Slide 29

  30. Assumed Emerald Ash Borer Damage Slide 30

  31. SADC 2021 Planning Incentive Grant Program Slide 31

  32. Stat atewide F Far arml mlan and Total als: 201 2017 7 US C Census o of A Agriculture • Land in F Farms = = 734, 734,084 084 ac. 2017/’ /’18 F Farmland A d Asse ssessm ssment • Total f for A Ag. Use = = 953, 953,442 442 PIG T Totals ls ( (Sc Schedule le A A) : : Co Count nty PIGs: • 18 Co Count nties • 5, 5,073 T 073 Targeted F Farms • 223, 223,620 T 620 Targeted A Acres • Estimated C Cost = $2. 2.037 B 037 Billion Muni nicipa pal P PIGs: • 45 M Munic icip ipalit itie ies • 2, 2,336 T 336 Targeted F Farms • 101 01,798 T 798 Targeted Acres • Estimated C Cost = $1.175 B Billion Total Targeted A Acreage = = 325, 325,41 418 a 8 ac. Appr pprox. Co Co. & & Mun. n. PIG T Target Farm Overlap = p = 19% 9% o or 61 61,829 829 ac. Total Est. T Targeted A Acreage = = 263, 263,589 589 ac. Slide 32

  33. Daniel & Kathleen Haynicz 19.753ac in Elk Twp, Gloucester Co. 84% in corn, vegetable & fruit 1 ac nonseverable exception 6.5 ac severable exception Slide 33

  34. Kathleen Aders Racite 35.738ac in East Greenwich Twp, Gloucester County 87% in barley production 1 ac nonseverable exception Slide 34

  35. James McLain 139.3 ac in Harmony Twp, Warren County 77% in soybeans 2 existing single family residences 1 ac nonseverable exception 0.5 ac nonseverable for flexibility of use Slide 35

  36. Brook Hollow Winery 11.7ac in Knowlton Twp, Warren County 86% in grapes 3.5 ac for flexibility of use No single family residential opportunities Slide 36

  37. Matthew, Robert & Sharon Santini 56 ac in Franklin Twp, Warren County 100% in corn 1.5 ac non-severable exception Slide 37

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend