Sidewalk Scoping Study South Royalton Village Alternatives - - PowerPoint PPT Presentation
Sidewalk Scoping Study South Royalton Village Alternatives - - PowerPoint PPT Presentation
Sidewalk Scoping Study South Royalton Village Alternatives MeetingSeptember 5, 2018 Project Overview 5 Minutes Review of Input 10 Minutes Overview of Alternatives 20 Minutes Minutes Open House 60 Minutes South Royalton
South Royalton Sidewalk Scoping Study
Alternatives Meeting–September 5, 2018
- Project Overview
5 Minutes
- Review of Input
10 Minutes
- Overview of Alternatives
20 Minutes Minutes
- Open House
60 Minutes
South Royalton Sidewalk Scoping Study
Meeting Purpose
- Receive Public Input on Village
Sidewalk Alternatives
South Royalton Sidewalk Scoping Study
Sidewalk Scoping Team
- Greenman-Pedersen, Inc.
- Carolyn Radisch, Project Manager
- Rebecca Brown, Project Engineer
- Bob White, Landscape Architect
- Town of Royalton
- Rose Hemond, Town Administrator
South Royalton Sidewalk Scoping Study
Schedule Overview
- May
Project Kick-Off
- June
Local Concerns Meeting
- May-July
Existing Conditions Review
- June – Aug
Alternatives Development
- September
Alternatives Presentation
- October
Preferred Alternative, Cost Estimate
- December
Final Presentation, Final Report
South Royalton Sidewalk Scoping Study
What is a Scoping Study?
- The study will develop conceptual plans and
a cost estimate for sidewalk improvements in an open and collaborative process.
- There are technical and process
requirements.
South Royalton Sidewalk Scoping Study
Project Goals
Address ADA (Americans with Disabilities Act) issues.
01
Identify issues with traffic flow along the business block.
02
Identify gaps in the sidewalk network.
03
Recommend priority segments for future construction.
04
South Royalton Sidewalk Scoping Study
Study Area
Poor Sidew alk Conditions
South Royalton Sidewalk Scoping Study Missing Sidew alk Links
South Royalton Sidewalk Scoping Study
Study Area
ADA Compliance: Tow n ROW
South Royalton Sidewalk Scoping Study
Study Area
ADA Compliance
ADA Compliance: Tow n ROW
South Royalton Sidewalk Scoping Study ADA Compliance: Curb Ramps
South Royalton Sidewalk Scoping Study
ADA Compliance
Pedestrian Safety: Curb Extensions
South Royalton Sidewalk Scoping Study
Study Area
ADA Access: Business Entries
South Royalton Sidewalk Scoping Study Traffic Patterns, Parking and Pedestrian Safety
Loading Zone Horse Trough 85’
South Royalton Sidewalk Scoping Study Streetscape Improvements
South Royalton Sidewalk Scoping Study
Public Comments
- Poor Condition of Sidewalks – Safety Issues
- Access to Chelsea Street Shops
- Parking
- Sidewalk Missing Links / Crosswalk Concerns / Signage
- Truck Loading / Use of Back Alley
- Horse Trough
- Streetscape Improvements
- Out of Scope Items – Will Hold on to Thoughts for Later
South Royalton Sidewalk Scoping Study
Conceptual Village Center Pedestrian Improvements
South Royalton Sidewalk Scoping Study
Conceptual Village Center Pedestrian Improvements: Detail Areas
South Royalton Sidewalk Scoping Study
Downtown Alternative 1: Repair and Replace Sidewalk
South Royalton Sidewalk Scoping Study
Downtown Alternative 1: Repair and Replace Sidewalk
South Royalton Sidewalk Scoping Study
Downtown Alternative 2: Building Access and Street Loading
South Royalton Sidewalk Scoping Study
Downtown Alternative 2: Building Access and Street Loading
South Royalton Sidewalk Scoping Study
Downtown Alternative 3: Building Access and Relocated Loading
South Royalton Sidewalk Scoping Study
Downtown Alternative 3: Building Access and Relocated Loading
South Royalton Sidewalk Scoping Study
Open House
- Review Conceptual Plans
- Vote for your Preferred Commercial Block Option
- Provide Comments
- Fill out Survey
- Thank You!