The Challenges of Constructing a Deep Sewer in an Urban Environment Andrea Brinkley, PMP Clay Herndon, P.E. Out of Sight, Out of Mind, Not Out of Risk Project Overview 17,300 LF of sewer line 11 to 20 feet deep 61 manholes 7


  1. The Challenges of Constructing a Deep Sewer in an Urban Environment Andrea Brinkley, PMP Clay Herndon, P.E. Out of Sight, Out of Mind, Not Out of Risk

  2. Project Overview • 17,300 LF of sewer line • 11 to 20 feet deep • 61 manholes • 7 lift stations decommissioned Out of Sight, Out of Mind, Not Out of Risk

  3. Project Overview Out of Sight, Out of Mind, Not Out of Risk

  4. Preliminary Engineering • Data Collection • Existing Utilities • Geotechnical Investigation Out of Sight, Out of Mind, Not Out of Risk

  5. Data Collection Out of Sight, Out of Mind, Not Out of Risk

  6. Existing Utilities 8’x8’ BOX CULVERT Out of Sight, Out of Mind, Not Out of Risk

  7. Existing Utilities Out of Sight, Out of Mind, Not Out of Risk

  8. Geotechnical Investigation Out of Sight, Out of Mind, Not Out of Risk

  9. Geotechnical Investigation Out of Sight, Out of Mind, Not Out of Risk

  10. Geotechnical Investigation Out of Sight, Out of Mind, Not Out of Risk

  11. Final Design • Pipe Material Selection • Embedment & Backfill • Trenchless Design • Constructability • Public Involvement Out of Sight, Out of Mind, Not Out of Risk

  12. Pipe Material Selection Out of Sight, Out of Mind, Not Out of Risk

  13. Embedment & Backfill Out of Sight, Out of Mind, Not Out of Risk

  14. Trenchless Design Out of Sight, Out of Mind, Not Out of Risk

  15. Constructability Out of Sight, Out of Mind, Not Out of Risk

  16. Constructability Out of Sight, Out of Mind, Not Out of Risk

  17. Public Involvement Out of Sight, Out of Mind, Not Out of Risk Out of Sight, Out of Mind, Not Out of Risk

  18. Construction Phase • Engineer of Record • 3 rd Party CM • City Inspector Out of Sight, Out of Mind, Not Out of Risk

  19. Construction Out of Sight, Out of Mind, Not Out of Risk

  20. Construction Out of Sight, Out of Mind, Not Out of Risk

  21. Construction Out of Sight, Out of Mind, Not Out of Risk

  22. Conclusions Out of Sight, Out of Mind, Not Out of Risk

  23. Andrea Brinkley, PMP abrinkley@pearlandtx.gov Clay Herndon, P.E. Clay.Herndon@freese.com Out of Sight, Out of Mind, Not Out of Risk

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.