scandent group pty ltd
play

SCANDENT GROUP PTY LTD Local staff, Local experience, International - PowerPoint PPT Presentation

SCANDENT GROUP PTY LTD Local staff, Local experience, International products Current Practice Underground Electrical Conduit PVC 1. Trench Excavation 2. Preparation of Outer 3. Outer Duct Duct connection Connection Outer ducts,


  1. SCANDENT GROUP PTY LTD “Local staff, Local experience, International products”

  2. Current Practice – Underground Electrical Conduit PVC 1. Trench Excavation 2. Preparation of Outer 3. Outer Duct Duct connection Connection • Outer ducts, couplings, bonding accessories • Placing Materials along with • Connecting 6m long individual excavated trench line ducts between man-holes 4. Trench Refill 5. Air Tightness & 6. Cleaning & Inspection Pressure Test of Installed of Installed Duct • Sand Filling, Soil Refill Outer Compaction Bedding, Padding • Cleaning/Inspection of Outer & Paving. Disposal of Left Soil Duct • Test Air Tightness Up to 7 Steps for Traditional PVC Conduit 7. Insertion of Inner Installation - Time Intensive Ducts • Insertion Individual or bundle depending on specification 2

  3. What is COD? SEAD Coiled Duct is leading a new era of Communication, Control & Underground Cable duct infrastructures. SEAD Coiled Duct is a very robust cable duct infrastructure solution. It is manufactured in great continuous lengths with a plurality of pre-manufactured inner ducts which can be silicone lined. In comparison with traditional technology, SEAD Coiled Duct has solved problems associated with compressive load. SEAD Coiled Duct has greater flexibility, reduced weight, greater continuous lengths, high reliability and greater cost efficiency. 3

  4. Value Proposition 3 Step Installation - Quick and economic installation by saving labour and materials. COD laying in-between two manholes may be done by single laying operation regardless of built-in multiple numbers of inner ducts and length in-between two manholes 1. Trench Excavation with related works 2. COD Laying 3. Trench Refill & Related works 4

  5. Benefits of COD 1. Better Flexibility Owing to spiral forming of product, COD is easy to bend without special bending efforts, and easy to by-pass or over pass hurdles along with the duct line. 5

  6. Benefits of COD 2. Continuous Lengths Supplied in lengths up to 600m and coiled on drum, it reduces considerable labour cost as well as working period to install by waving numerous connections in between two manholes but one time installation. 6

  7. Benefits of COD 3. Lighter in weight Owing to the lighter gravity (0.95:1.43), COD is considerably lighter, which offers benefit in handling in the work site and transportation compare to the conventional duct. 7

  8. Benefits of COD 4. Stronger Owing to the readily built-in multiples numbers of inner ducts perfectly without any loose space inside of spiral outer duct, COD offers considerable advantage in terms of compressive load. 5. Safety COD stands safe in Earthquake and Land Subsidence owing to its strong compressive load and flexibility. 8

  9. Benefits of COD 6. Better resistance against chemicals and better endurance: COD lasts semi-permanently owing to resistance against chemicals and corrosion free from salt water or wetland. 9

  10. Benefits of COD 7. Easy insertion of copper & optic fibre cables COD facilitate easy insertion of cables up to the maximum-coiled length owing to perfect alignment of inner ducts and less friction, as it has no connections. In addition, it enables to extend the manhole distance. 10

  11. Benefits of COD 8. High Reliability COD is non-conductive of electricity, and therefore, it is ideal to apply for power cable duct. 9. Cost Efficiency In consideration of all advantages and efficiency, COD offers cost efficiency throughout all consecutive work stages and endurance. 11

  12. General Comparison of f COD wit ith Conventional Ducting System C.O.D. Conventional Method Description of comparison Outer Duct Inner ducts Outer Duct Inner ducts Raw material H.D.P.E H.D.P.E P.V.C. H.D.P.E No limit No limit 6 meters Length No limit (At maximum) (Up to 500m or 1,000m) No need (saves materials Connection In every 6 m and accessories) Insertion of inner ducts No need To insert Intermediate Manhole No need to build To build in turning point Straight Straight Straight twisted Horizontal alignment of inner duct Saves optic cable about 3 to 5% . Trench Dimension (No need man-working space: (Volume) (Slope cut to secure man-working space) vertical cut) (28mm inner ducts in 3 inner ducts only Up to 5 inner ducts 112mm outer duct) 0.5m(W) x 0.81m(H) 0.3m(W) x 0.6m(H) (Dimension) Rough bedding Trench Bedding Fine bedding (passes over/by hurdles) 12

  13. “Small local team, Large local knowledge, Huge local industry network” 13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend