Sandymount to Seapoint Corridor Study S2S Supporters Meeting November 15 th 2016 Michael Collins for S2S Overview of S2S 1. Background 2. South Bay City Centre 3. City Centre 4. North Bay Michael Collins for S2S Main Sections 1.
Michael Collins for S2S City Centre
- 1. Background
- 2. South Bay
- 3. City Centre
- 4. North Bay
Overview
- f S2S
Michael Collins for S2S
Main Sections
- 1. Merrion Road
- 2. Merrion Gates
- 3. S2S
Michael Collins for S2S
- 1. IRISHTOWN TO PROMENADE (1.5Km)
Part 2: Beach Rd to Newgrove Avenue Existing: Small footpath - No cycleway. Proposed: 2.5m footpath - 3.5m cycleway Comments: Land Acquisition. Flood Protection. Part 1: Sean Moore Park Existing: 3.2m walkway - No cycleway. Proposed: 3.5m cycleway + grass strip Part 3: Newgrove Ave to Promenade Existing: Narrow footpath - no cycleway. Proposed: 4.0m boardwalk; 3m cycleway Comment: Flood Protection
Michael Collins for S2S
2A: Sandymount Promenade (1.1km)
Existing: 3.7m walkway, no cycleway. Proposed: New 3.5m cycleway + buffer Comment: Constrained at the south end?
Michael Collins for S2S 3: Merrion Gates (300m) Existing: Narrow road and footpath no cycleway Proposed: Link Road over rail line. Strand Rd shared cul-de-sac. New under-pass for walkers and cyclists Comment: Land Acquisition; Underpass
Merrion Gates
Michael Collins for S2S 4A: Merrion Gates to Booterstown Existing: Narrow walkway, cycleway in bus lane Proposed: Widened footpath and cycleway. Issues: Land Acquisition; Crossovers; Busy road
- 4. Merrion Gates to Blackrock (2.4 kms)
Michael Collins for S2S
4B: Booterstown to Blackrock
Existing: Narrow walkway + cycleway in Park Proposed: New cycleway. Wide link to Blackrock Issues: Possible duplication – Land Acquisition
Michael Collins for S2S
6 Blackrock to Seapoint (1.1 kms)
Existing: Nothing on seafront Proposed: Seafront Walkway, Cycleway on road. Issues: Seapoint one way, Land Acquisition at
- Seapoint. Separation of Cycleway/Walkway.
Michael Collins for S2S
Why not on the Seafront ?
Issues
- Designation of the area as
an SAC and SPA
- “Project Splitting”
- Conflict in Environmental
Objectives.
SPA Approx 2000Ha SAC Approx 740 Ha
Michael Collins for S2S
Positive
- Seafront/Off-Road Walkway/Cycleway from
Irishtown to Merrion Gates (3.75 kms)
- Seafront Walkway from Blackrock to Seapoint
(1.0km).
- Viable (if less desirable for sections) route for
total 6.5kms – Irishtown to Seapoint.
- Resolves the traffic problems at Merrion Gates.
- Opportunity to re-evaluate the constraints.
- Completion of S2S project is not precluded.
Positive vs Negative for the S2S Negative
- Inland Walkway/Cycleway partly on road from
Merrion Gates to Blackrock (2.5 kms).
- Inland Cycleway on road from Blackrock to
Seapoint (1.0 kms).
- Requires significant land purchase.
- Possible duplication and waste of money.
- Not a continuous off-road, traffic free, safe