SAN ONOFRE: FAR OUTSIDE THE NORM February 7, 2013 Dan Hirsch, - PowerPoint PPT Presentation

SAN ONOFRE: FAR OUTSIDE THE NORM February 7, 2013 Dan Hirsch, Lecturer, UC Santa Cruz; President, Committee to Bridge the Gap Note: The views presented here are those of the author and do not necessarily represent those of UCSC or CBG.


  1. SAN ONOFRE: FAR OUTSIDE THE NORM February 7, 2013 Dan Hirsch, Lecturer, UC Santa Cruz; President, Committee to Bridge the Gap

  2. Note: The views presented here are those of the author and do not necessarily represent those of UCSC or CBG.

  3. EDISON MA EDISON MAKES KES TW TWO C O CLAIMS LAIMS TO O SUP SUPPOR PORT T ITS R ITS REQUES EQUEST T FOR FOR REST RESTAR ARTING UN TING UNIT 2 IT 2.

  4. FIRST: “ The wear in Unit 2 is far less extensive than the wear in Unit 3 ” and “Unit 3 had more than 300 tubes with the unexpected tube-to-tube wear; Unit 2 only had two tubes exhibiting minor tube-to-tube wear.”

  5. Second SCE Assertion: “ The he na natur ture of e of the the supp suppor ort t str structur ucture e wear is ear is not un not unusual usual in new steam in new steam gener generator tors s and and is is par part o t of the the equip equipment ment settling in.” Source: S. Cal. Edison Press Release, July 13, 2012

  6. THE THE MEDIA MEDIAN N NU NUMBER MBER OF STEAM OF STEAM GENERA GENERATOR OR TUBES TUBES SHO SHOWING WING WEAR WEAR AFTER AFTER ON ONE E CY CYCLE CLE OF OF OPERA OPERATION TION NATION TIONALL ALLY Y IS IS — FOU FOUR. R.

  7. SAN SAN ON ONOFRE OFRE UN UNIT 2 IT 2 HAD HAD 1595 1595 D DAMA AMAGED GED TUBES, TUBES, APPR APPROXIMA XIMATEL TELY Y 400 TIMES THE 400 TIMES THE MEDIA MEDIAN. N. SAN SAN ON ONOFRE OFRE UN UNIT IT 3 3 HAD HAD 1806. 1806.

  8. THE THE MEDIA MEDIAN N NU NUMBER MBER OF WEAR OF WEAR INDICA INDICATIONS TIONS ON ON STEA STEAM M GEN GENERA ERATOR OR TUBES TUBES AFTER AFTER ON ONE E CY CYCLE CLE OF O OF OPERA PERATION TION IS IS — FOU FOUR. R.

  9. SA SAN N ONOFRE UN ONOFRE UNIT 2 HAD IT 2 HAD 4721, GR 4721, GREA EATE TER R THAN THAN A A THOU THOUSAND SAND TIMES TIMES MORE. MORE. SAN SAN ONOFRE ONOFRE UNIT 3 HAD UNIT 3 HAD 10,284. 10,284.

  10. THE THE MEDIAN MEDIAN NU NUMBER MBER OF OF STEA STEAM M GENERA GENERATOR OR TUBES TUBES THA THAT T WERE WERE PL PLUG UGGED GED AFTER AFTER ON ONE CY E CYCLE CLE OF O OF OPERA PERATION TION IS IS — ZER ZERO. . SAN SAN ON ONOFRE OFRE UN UNIT 2 H IT 2 HAD AD 510; 510; UN UNIT 3 H IT 3 HAD AD 807 807.

  11. SCE’s CAL Response States: “The actions to operate at reduced power and shut down for a mid-cycle inspection within 150 cumulative days of operation are interim compensatory actions .

  12. “SCE will reevaluate these actions during the mid-cycle inspection based on the data obtained during the inspections.

  13. “ In addition, SCE has established a project team to develop and implement a long term plan for repairing the SGs .” (emphasis added)

  14. Conclusion It would be unwise to permit restart of San Onofre Unit 2 with its crippled steam generators that need repair or replacement without in fact repairing or replacing them.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.