2000 East Reconstruction
Parley’s Canyon Boulevard to Mary Dott Way (2930 South)
- New road surface - complete
removal of old pavement
- Irrigation ditch piped – curb,
gutter, and sidewalk installed
- Damaged and non-ADA
compliant curb, gutter, and sidewalk replaced
- Bike lanes on both sides
SLIDE 3
2000 East Reconstruction
Parley’s Canyon Boulevard to Mary Dott Way (2930 South)
Online Survey
- Postcards mailed to properties within ¼ mile of the project
- Invitation to tonight’s meeting and to MyStreet page
- Survey closes Friday, August 16th
SLIDE 4
2000 East Reconstruction
Parley’s Canyon Boulevard to Stratford Avenue
- Multi-use path on west side through gully
OR sidewalk on both sides
South of 2700 S to City Border
- Center turn lane
- Bike lanes on both sides
- Millcreek City – transition into existing and continuity with
Millcreek’s future plans
SLIDE 5
2000 East Reconstruction
Parley’s Canyon Blvd to Stratford Ave
SLIDE 6
Parley’s Canyon Boulevard Intersection
SLIDE 7
Parley’s Canyon Boulevard Intersection