RSWM LTD FABRIC DIV MORDI, BANSWARA ENERGY CONSERVATION WORK DONE - PowerPoint PPT Presentation

RSWM LTD FABRIC DIV MORDI, BANSWARA ENERGY CONSERVATION WORK DONE JUMBOO JIGGER MACHINE BEFORE AFTER MAIN MOTOR WAS INSTALLED THE VFD IN RUNNING WITH DOL PLACE OF DOL STARTER IN ALL 4 NOS STARTER IN JUMBOO JUMBOO JIGGER JIGGER NO 1,2,3


  1. RSWM LTD FABRIC DIV MORDI, BANSWARA ENERGY CONSERVATION WORK DONE

  2. JUMBOO JIGGER MACHINE BEFORE AFTER MAIN MOTOR WAS INSTALLED THE VFD IN RUNNING WITH DOL PLACE OF DOL STARTER IN ALL 4 NOS STARTER IN JUMBOO JUMBOO JIGGER JIGGER NO 1,2,3 AND 4 MACHINE AND SAVED THE APPROX KWH 31590 PER ANNUM

  3. THEN MACHINE BEFORE AFTER CIRCULATION INSTALLED VFD IN PUMP,BLOWER ,AND CIRCULATION PUMP REEL MOTOR WAS ,BLOWER AND REEL RUNNING WITH DOL MOTOR IN PLACE OF STARTER DOL STARTER AND SAVED THE APPROX KWH 87680 PER ANNUM

  4. SOFTFLOW MACHINE BEFORE AFTER CIRCULATION PUMP INSTALLED VFD IN WAS RUNNING WITH CIRCULATION PUMP IN DOL STARTER PLACE OF DOL STARTER AND SAVED THE APPROX KWH 24000 PER ANNUM

  5. RELAX MACHINE BEFORE AFTER 10 NOS CIRCULATION INSTALLED VFD IN PUMP WAS RUNNING CIRCULATION PUMP IN WITH DOL STARTER PLACE OF DOL STARTER AND SAVED THE APPROX KWH 46720 PER ANNUM

  6. JETDYEING MACHINE BEFORE AFTER CIRCULATION PUMP INSTALLED VFD IN WAS RUNNING WITH CIRCULATION PUMP IN DOL STARTER IN PLACE OF DOL JETDYEING MACHINE STARTER IN JETDYEING NO 4 & 5 NO 4 & 5 AND SAVED THE APPROX KWH 32000 PER ANNUM

  7. STENTER MACHINE NO-3 BEFORE AFTER THERE WAS 1400 INSTALLATION OF NEW STENTER MACHINE UNITS CONSUMED PER YAMUNA MAKE AND DAY IN OLD STENTER MODIFIED MOD BUS MACHINE 8 CHAMBER SYSTEM IN TO ANALOG HARISH MAKE SYSTEM FOR HOT AIR FAN& EXHAUST FAN INVERTERS SAVED APPROX KWH 306774 PER ANNUM

  8. WR MACHINE NO 1 BEFORE AFTER CIRCULATION PUMP INSTALLED VFD IN WAS RUNNING WITH CIRCULATION PUMP IN STAR DELTA STARTER PLACE OF STAR DELTA STARTER AND SAVED THE APPROX KWH 20800 PER ANNUM

  9. HTHP MACHINE BEFORE AFTER HYDROLIC MOTOR WAS INSTALLED VFD IN RUNNING WITH DOL HYDROLIC MOTOR IN STARTER PLACE OF DOL STARTER AND SAVED THE APPROX KWH 16000 PER YEAR

  10. YARNDYEING 100 KG BEFORE AFTER CIRCULATION PUMP INSTALLED VFD IN WAS RUNNING WITH CIRCULATION PUMP IN STAR DELTA STARTER PLACE OF STAR DELTA STARTER AND SAVED THE APPROX KWH 16000 PER ANNUM

  11. BEAMDYEING MACHINE BEFORE AFTER CIRCULATION PUMP INSTALLED VFD IN WAS RUNNING WITH CIRCULATION PUMP IN STAR DELTA STARTER PLACE OF STAR DELTA STARTER AND SAVED THE APPROX KWH 16000 PER ANNUM

  12. PACIFIC JIGGER NO 1 TO 8 BEFORE AFTER ALL PACIFIC JIGGERS'S INSTALLED VFD IN ( 8 NOS) CIRCULATION CIRCULATION PUMP IN PUMP WAS RUNNING PLACE OF STAR DELTA WITH STAR DELTA STARTER AND SAVED STARTER THE APPROX KWH 48000 PER ANNUM

  13. RO PLANT BEFORE AFTER ALL THREE STAGE INSTALLED VFD IN HIGH PRESSURE PUMP HIGH PRESSURE PUMP ( 25 HP,20HP,7.5 HP) IN PLACE OF STAR WERE RUNNING WITH DELTA STARTER AND STAR DELTA STARTER SAVED THE APPROX KWH 78624 PER ANNUM

  14. WEAVING BEFORE AFTER SULZER LOOMS WERE BY REPLACING 6 NOS RUNNING WITH OLD ENERGY EFFICIENT TYPE CONVENTIONAL MOTORS 4.2 KW IN MOTOR PLACE OF CONVENTIONAL MOTORS AND SAVED APPROX KWH 59242 UNIT PER ANNUM

  15. WEAVING H PLANT BEFORE AFTER IN EXISTING LUWA WE INSTALLED VFD DRIVE WERE USING STAR IN H PLANT 2 NOS OF DELTA STARTER IN H SUPPLY AIR FAN AND 2 PLANT SUPPLY AIR FAN NOS IN RETURN AIR & RETURN AIR FAN FAN,WE HAVE SAVED APPROX KWH 127626 PER ANNUM

  16. LIGHTING BEFORE AFTER WE WERE USING WE ARE REPLACING FLOUROCENT TUBE ALL THESE LIGHT WITH LIGHTS 36Watt IN ALL LED TUBE LIGHTS 18 OFFICES OF PLANT AND WATTS AND SAVED THE ADM APPROX KWH 23154 PER ANNUM

  17. THERMOPACK BEFORE AFTER WE WERE USING STAR INSTALLED VFD IN DELTA STARTER IN CIRCULATION PUMP IN THERMIC OIL PLACE OF STAR DELTA CIRCULTION PUMP STARTER AND SAVED THE APPROX KWH 234819 PER ANNUM

  18. DYEING JIGGER BEFORE AFTER WE WERE OPERATE INSTALLED TEMP STEAM VALVE CONTROLLER FOR MANUALLY FOR CONTROL THE STEAM HEATING PURPOSE VALVE ON – OFF AUTOMATICALLY,WE HAVE SAVED PET COKE APPROX 8.7 TON PER ANNUM

  19. STEAM AUDIT BEFORE AFTER THE PIPE SIZE OF WE HAVE DONE THE STEAM LINE IS NOT MODIFICATION IN APPROPRIATE AS PER STEAM LINE BY DESIGN REDUCING THE DIA OF STEAM PIPE AND SAVED THE STEAM APPROX 3500 TON PER ANNUM

  20. THERMOPACK BEFORE AFTER APH DESIGN WAS NOT DONE THE APPROPRIATE AND TUBE MODIFICATION IN APH ALSO DAMAGE TUBE BY INCREASING THE DIA OF APH TUBE AND TUNE THE FUEL – AIR RATIO,WE HAVE SAVED THE PET COKE APPROX 175 MT PER ANNUM

  21. STENTER NO 1 BEFORE AFTER ALL HOT AIR FAN, INSTALLED VFD DRIVE COOLING FAN AND IN HOT AIR EXHAUST WERE FAN,COOLING FAN AND RUNNING WITH DOL EXHAUST, WE HAVE STARTER SAVED APPROX KWH 189891 PER ANNUM

  22. STENTER NO -2 BEFORE AFTER ALL HOT AIR FAN, INSTALLED VFD DRIVE COOLING FAN AND IN HOT AIR EXHAUST WERE FAN,COOLING FAN AND RUNNING WITH DOL EXHAUST, WE HAVE STARTER SAVED APPROX KWH 190242 PER ANNUM

  23. WE GOT RAJASTHAN ENERGY CONSERVATION AWARD RECA-2012

  24. THANK YOU BP SINGH

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.