July 25, 2018
HW completes 10% design
HW conducts site walks with WalkUP Roslindale, LivableStreets and the Arboretum
Public Meeting HW completes 10% design of Roslindale Gateway Path HW conducts site walk with APC Public Site Walk
Draft Design Kick-Off Meeting Survey Final Design Public Meeting
Stakeholder Meeting Public Meeting (MBTA Portion)
connections
Roslindale Village Arboretum Blackwell Path to Forest Hills Station MBTA parcel
Bussey Brook Meadow Gate
Unnamed Gate on Arborough Street Unnamed Gate on Walter Street
Stabilized Soil Ipe Boardwalk
In-grade textured surfacing Pavement markings and reflectors Vegetated, defined edge