roslindale gateway path 25 concept design
play

Roslindale Gateway Path 25% Concept Design July 25, 2018 Project - PowerPoint PPT Presentation

Roslindale Gateway Path 25% Concept Design July 25, 2018 Project Goals A safer connection for cyclists and pedestrians from Roslindale Village to the Arboretum A link for underserved portions of Roslindale to the Arboretum and the


  1. Roslindale Gateway Path 25% Concept Design July 25, 2018

  2. Project Goals • A safer connection for cyclists and pedestrians from Roslindale Village to the Arboretum • A link for underserved portions of Roslindale to the Arboretum and the Village • A connection to the Blackwell Path Extension (and the Southwest Corridor)

  3. 10% Design Public Site Walk HW completes 10% design of Blackwell Path Extension Public Meeting 2015 2016 2017 HW conducts site walk with APC HW completes 10% design of Roslindale HW conducts site walks with Gateway Path WalkUP Roslindale, LivableStreets and the Arboretum

  4. 25% Design Draft Design Final Design Public Meeting Kick-Off Meeting (MBTA Portion) 2018 Oct 2017 Survey Public Meeting Stakeholder Meeting

  5. Scope of Project  25% design of entire path  Limited survey of the Arboretum  Preliminary grading of alignment  Identify gateways and secondary connections  Identify preferred materials  Review options for site amenities  Evaluate planning-level construction costs  Develop graphics showing path perspectives

  6. Primary Path Blackwell Path to Forest Hills Station Arboretum MBTA parcel Roslindale Village

  7. MBTA Section

  8. MBTA Section - Grades

  9. MBTA Section - Photos

  10. Primary Gateway Bussey Brook Meadow Gate

  11. Secondary Gateway Unnamed Gate on Arborough Street Unnamed Gate on Walter Street

  12. Path Materials Stabilized Soil Ipe Boardwalk

  13. Safety Vegetated, defined edge Pavement markings In-grade textured and surfacing reflectors

  14. Path Rendering

  15. Next Steps  Complete the 25% conceptual design for MBTA section  Prepare estimates of probable costs for MBTA section  Continue to work with stakeholders on the remaining sections of the path

  16. Jennifer Relstab, P.E.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend